- Q. Stop signal is to be passed in On position.
A)T-806
B)T-509
C)T-369(3b)
D)Simple memo
Answer: T-369(3b)
- Q. Passenger warning board is placed at a distance of ________ meters from the first stop signal.
A)1500
B)1200
C)1000
D)1800
Answer: 1000
- Q. No passenger train shall be started from a station before the ________ time
A)Both
B)Advertised
C)Non-advertised
D)None of these
Answer: Advertised
- Q. When the rail failure is rectified by the train can pass at speed
A)30 kmph
B)20 kmph
C)25 kmph
D)None of these
Answer: 30 kmph
- Q. What is the width of broad gauge railway line in India?
A)4 feet 11 inches
B)5 feet 3 inches
C)5 feet 6 inches
D)5 feet 4 inches
Answer: 5 feet 6 inches
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic
- Q. Medical relief van shall be dispatched within ________ minutes from double exit siding.
A)15
B)10
C)20
D)25
Answer: 15
- Q. Who invented the railway engine?
A)James Watt
B)Charles Babbage
C)Isaac Newton
D)George Stephenson
Answer: George Stephenson
- Q. Written authority received to pass approach stop signal.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. Which is the shortest station name in Indian Railways?
A)Goa
B)Pune
C)Bc
D)Ib
Answer: Ib
- Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
A)35
B)20
C)25
D)30
Answer: 30
- Q. When VP vehicles are attached in a goods train the maximum number of VPvehicle in one group is
A)8
B)10
C)6
D)None of these
Answer: 6
- Q. A jumper is remote control and is used for ________.
A)Control on Light, Fan etc.
B)Light
C)Fans
D)None of these
Answer: Control on Light, Fan etc.
- Q. When the train has not cleared the fouling marks. Driver to give ________ whistle
A)01 long
B)03 long
C)02 long
D)None of these
Answer: 03 long
- Q. If there is no advanced starter at A’ class station, signal overlap will be ________.
A)Block sectiond
B)Next whole block section
C)Back whole block section
D)None of these
Answer: Next whole block section
- Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
A)Yellow
B)RED
C)Green
D)None of these
Answer: RED
- Q. At which of the following places Diesel Component Works is established?
A)Perambur
B)Jamshedpur
C)Patiala
D)Varanasi
Answer: Patiala
- Q. The height of standards used as supports in open trucks loaded with fire wood bamboo etc, shall not exceed the following in BG from the floor of wagon.
A)1 - 890 meters
B)1 - 98 meters
C)1 - 830 meters
D)None of these
Answer: 1 - 98 meters
- Q. Second train during all communication failure shall be dispatched after an interval of
A)35
B)20
C)25
D)30
Answer: 30
- Q. On which time the watch shall be set by loco pilot with Station masters watch?
A)A & B both
B)At 8.00 Hrs
C)At 16.00 Hrs
D)At the time of on duty
Answer: At the time of on duty