More Questions on Indian Railway
- Q. Which is the India’s first double Decker train?
A)Guwahati Thiruvananthapuram Express
B)Ahmedabad - Mumbai Central Double Decker Express
C)Samjhauta Express
D)Howrah – Dhanbad Double Decker Express
Answer: Howrah – Dhanbad Double Decker Express
- Q. How much distance was travelled by first train of India?
A)34 km
B)33 km
C)36 km
D)46 km
Answer: 34 km
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic
- Q. When a driver finds automatic stop signal at on he must stop for 01 minute during day and 02 minutes during night and proceed at ________ kmph
A)25
B)15
C)20
D)None of these
Answer: 15
- Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.
A)25
B)30
C)20
D)50
Answer: 30
- Q. What will be the code of engine whistle during signal passing at ON or in defective condition on proper authority information by the Loco Pilot to Guard ?
A)--0
B)0-0
C)-0-
D)---
Answer: 0-0
- Q. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.
A)600
B)500
C)400
D)800
Answer: 600
- Q. In case of ACP Guard shall proceed towards the front from ________ side.
A)Back
B)Left
C)Right
D)Noe of these
Answer: Left
- Q. Distant signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Permissive
- Q. Cancellation facility through ________ helpline number will be provided using ‘One Time Password’ sent on registered phone number.
A)139
B)144
C)123
D)119
Answer: 139
- Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
A)Yellow
B)RED
C)Green
D)None of these
Answer: RED
- Q. Shunting to be done in D/L block section
A)T-806
B)PLCT
C)T-369(3b)
D)Simple memo
Answer: T-806
- Q. When a token is lost, the lost token notice is issued and it is valid for ________ months.
A)3
B)6
C)4
D)2
Answer: 6
- Q. During single line working of DL the speed of the first train is ________ kmph
A)15
B)25
C)20
D)None of these
Answer: 25
- Q. Who has been appointed as the new Union Minister of Railways?
A)Ashwini Vaishnaw
B)Piyush Goyal
C)Nirmala Sitharaman
D)Mukhtar Abbas Naqvi
Answer: Ashwini Vaishnaw
- Q. How many dead engine can be attached in a goods train?
A)3
B)1
C)2
D)4
Answer: 1
- Q. Booked speed is fixed by ________.
A)Sr. DOM
B)COM
C)CCM
D)None of these
Answer: COM
- Q. Which of the following is the largest railway junction in India?
A)Mathura
B)Delhi
C)Bhatinda
D)Allahabad
Answer: E
- Q. What should be done by guard if train entering in block section without authority to proceed?
A)Protect the Train
B)Stop the Train
C)Inform to SM
D)All of above
Answer: All of above
- Q. By whom General Rule is prepared?
A)PCOM
B)Railway Board
C)Zonal Railway
D)GM
Answer: Railway Board