- Q. Except ________ signal, cabin master shall not show any other signal from his cabin during shunting.
A)Red hand signal
B)Yellow signal
C)Green signal
D)None of these
Answer: Red hand signal
- Q. Illuminated A marker of semi-automatic signal means ________.
A)Outer signal
B)Working as automatic signal
C)Semi signal
D)None of these
Answer: Working as automatic signal
- Q. Load infringing standard moving dimensions (ISMD) shall be moved by
A)Work trains
B)Through train
C)Shunting trains
D)None of these
Answer: Through train
- Q. BP in the Guard cab of EMU shall be ________ kg/cm2 and Motor mans cab shall be 4.6 kg/cm2.
A)4
B)4.2
C)4.01
D)4.6
Answer: 4.6
- Q. What is the maximum speed of a train while view is obstructed due to thick and foggy weather?
A)30 kmph
B)Normal speed
C)15 kmph
D)60 kmph
Answer: 60 kmph
- Q. Which railway station has become the India’s first station to run by all women staff?
A)Chhatrapati Shivaji Terminus railway station
B)Matunga railway station
C)Hazrat Nizamuddin railway station
D)Kolkata railway station
Answer: Matunga railway station
- Q. Consider the following: 1)Real Estate Investment Trust 2)Railway operation 3)Atomic Energy As of now, there is no FDI in India, in which of above sector(s)?
A)1, 2 & 3
B)1 Only
C)1 & 2 Only
D)None
Answer: 1, 2 & 3
- Q. During accident or Engine failure in the mid section the report sent to SM must be signed by ________.
A)Both
B)GDR
C)TDR
D)None of these
Answer: GDR
- Q. The speed of the train over neutral section shall not be less than ________ kmph
A)40
B)20
C)30
D)None of these
Answer: 30
- Q. If the motorman of EMU passes the automatic stop signal at ON, he shall proceed at a speed of 15/8 km/h and stop the train before ________ meters of the obstruction on the track.
A)80
B)70
C)75
D)85
Answer: 75
- Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
A)T/A-912
B)T/B-912
C)T/C-912
D)None of these
Answer: T/B-912
- Q. Speed of Train over points shall be ________ Km/h when the points are clamped and padlocked after disconnection of points.
A)30
B)20
C)25
D)15
Answer: 15
- Q. Motorman of EMU shall give ________ bell code while passing A marker lit gate signal in ON position.
A)0-00
B)00-00
C)000-000
D)None of these
Answer: 00-00
- Q. Speed of the following tower wagon is ________ km/h.
A)9
B)10
C)8
D)4
Answer: 8
- Q. The turning out time of an MRV Spl. When in is kept in one exit siding is ________ minutes.
A)20
B)25
C)15
D)None of these
Answer: 25
- Q. Repeating signal shows ________ light in ON condition.
A)Green
B)Red
C)Yellow
D)None of these
Answer: Red
- Q. Who invented the railway engine?
A)James Watt
B)Charles Babbage
C)Isaac Newton
D)George Stephenson
Answer: George Stephenson
- Q. On which time the departure signal shall be taken off for run through train passing via loop line?
A)After entering in loop line
B)Before entering at station
C)After stopped at station
D)Before 10 minutes from expected arrival
Answer: Before 10 minutes from expected arrival
- Q. When water level is just above top of rail speed of electric locomotive shall apply ?
A)15 kmph
B)5 kmph
C)10 kmph
D)20 kmph
Answer: 10 kmph
- Q. Maximum permissible speed is fixed by ________.
A)MT
B)CRS
C)GM
D)None of these
Answer: CRS