- Q. What is maximum width of coaching stock in BG?
A)3250 mm
B)3050 mm
C)3200 mm
D)3300 mm
Answer: 3250 mm
- Q. On DL in ________ minutes gap trains must be started during total interruption of communication.
A)30
B)20
C)10
D)None of these
Answer: 30
- Q. Marshalling rules of passenger train are framed by ________.
A)DRM
B)DOM
C)COM
D)AOM
Answer: COM
- Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is
A)10 kmph
B)5 kmph
C)8 kmph
D)None of these
Answer: 5 kmph
- Q. Consider the following statements about Railway Convention Committee: 1)The Chairman of the Committee is appointed by the Speaker from amongst the members of the Committee 2) The Committee reviews the rate of dividend which is payable by the Railway Undertaking to the General Revenues Which of the above statements is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: Both 1 & 2
- Q. Guard of goods train shall sign on ________ minutes before the actual departure of the train.
A)40
B)45
C)30
D)35
Answer: 45
- Q. In block section trains entered simultaneously from either direction and finally stopped before collision and distance between both the trains was 400 mtrs, which type of accident occured?
A)Save collision
B)Violation of block rules
C)Passingn danger signal
D)All of above
Answer: All of above
- Q. Indian Railways has recently signed pact with which company for use of Natural Gas in railway workshops?
A)NTPC
B)ONGC
C)GAIL India
D)IOCL
Answer: GAIL India
- Q. When the Loco pilot should contact with SM on telephone while IBS in “ON” position?
A)Immediate
B)After 5 minutes
C)After 2 minutes
D)After 1 miutes in day and 2 minutes in night
Answer: After 1 miutes in day and 2 minutes in night
- Q. For Block Back form ________ To be issued on DL.
A)T/B-806+PN
B)T/806+PN
C)T/A806+PN
D)None of these
Answer: T/806+PN
- Q. Wagon with livestock shall be attached ________ position from engine on a passenger train.
A)Third
B)First
C)Second
D)None of these
Answer: Second
- Q. Standard moving dimensions Load infringing (ISMD) shall be moved by
A)Work trains
B)Through train
C)Shunting trains
D)None of these
Answer: Through train
- Q. How many Class of Accident?
A)20
B)14
C)16
D)None of these
Answer: 16
- Q. To receive a train on unsignalled line, ________ authority is issued.
A)T/369(4b) Pilot in MEMU
B)T/369(3b) Pilot in MEMO
C)T/369(2B) Pilot in MEMO
D)T/369(5b) Pilot in MEMU
Answer: T/369(3b) Pilot in MEMO
- Q. In MAUQ area where signal arm home with isolation is provided the speed is over point is
A)Unrestricted
B)75 kmph
C)50 kmph
D)None of these
Answer: 75 kmph
- Q. Permissible limit of flat tyre in goods and coaching vehicles is 60mm and ________ respectively.
A)80 mm
B)60 mm
C)70 mm
D)50 mm
Answer: 50 mm
- Q. If the goods train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
A)10
B)3
C)4
D)20
Answer: 20
- Q. Permission of ________ is required to work the material train in the night.
A)DRM
B)AOM
C)DOM
D)None of these
Answer: DRM
- Q. Load table is mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. Mission PACE deals with
A)Fast Ticketing System
B)Protection of nature
C)Help Customers
D)Quality of Goods and Services
Answer: Quality of Goods and Services