More Questions on Indian Railway
- Q. To apply for Line block, the notice shall be given to DRM not less than
A)12 hours
B)48 hours
C)24 hours
D)None of these
Answer: 24 hours
- Q. A station where the rail lines end, is called
A)Block station
B)Junction station
C)Way - side station
D)Terminal station
Answer: Terminal station
- Q. When four wheeler attached, speed of passenger train will be ________ km/h.
A)85
B)80
C)75
D)90
Answer: 75
- Q. If the points are set for main line, point indicator gives ________ light in the night.
A)Yellow
B)red
C)Green
D)White
Answer: White
- Q. Who has been appointed as the new Union Minister of Railways?
A)Ashwini Vaishnaw
B)Piyush Goyal
C)Nirmala Sitharaman
D)Mukhtar Abbas Naqvi
Answer: Ashwini Vaishnaw
- Q. Section controller shall transmit the correct time at ________ hours daily to all the stations.
A)16
B)20
C)12
D)10
Answer: 16
- Q. Consider the following railway zones with their headquarters: West Central Railway→ Jabalpur East Coast Railway → Bhubaneswar Western Railway→ Mumbai Which of the above is / are correct?
A)1, 2 & 3
B)1 & 2 Only
C)2 & 3 Only
D)None
Answer: 1, 2 & 3
- Q. Overloading Tolerance for a 8 wheeler bogie MG vehicle is
A)1.5 Tonne
B)2 Tonnes
C)1 Tonne
D)None of these
Answer: 1 Tonne
- Q. The use of block instrument shall be governed by special instructions to be issued with the prior approval of
A)CSO
B)Railway Board
C)CRS
D)None of these
Answer: CRS
- Q. Visibility test object is placed at a distance of ________ meters from the station building.
A)180
B)108
C)100M
D)200
Answer: 180
- Q. During thick or foggy weather or night if ________ is not provided, trains are not permitted to draw ahead upto advanced starter.
A)Both
B)Track Circuit
C)Track
D)None of these
Answer: Track Circuit
- Q. Rake link book-let is prepared by COM and ________.
A)DPO
B)CPTM
C)CPO
D)None of these
Answer: CPTM
- Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
A)25
B)20
C)15
D)None of these
Answer: 25
- Q. Maximum No. of ________ explosive wagons can be attached to a goods train.
A)6
B)5
C)4
D)10
Answer: 5
- Q. The Ministry of Railways has recently launched which app for freight managers?
A)SNOORTI app
B)SFOORTI app
C)SKOORTI app
D)SMOORTI app
Answer: SFOORTI app
- Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Green
- Q. Permission of ________ is required to work the material train in the night.
A)DRM
B)AOM
C)DOM
D)None of these
Answer: DRM
- Q. What is the width of broad gauge railway line in India?
A)4 feet 11 inches
B)5 feet 3 inches
C)5 feet 6 inches
D)5 feet 4 inches
Answer: 5 feet 6 inches
- Q. Station Working Rules of Non-interlocked station is signed by ________.
A)AOM & ADEN
B)DOM & DEN
C)Sr. DOM & Sr. DEN
D)None of these
Answer: Sr. DOM & Sr. DEN
- Q. Competency certificate of the gateman of interlocked engineering gate is signed by
A)Both
B)SSE/P.way
C)SSE/Sig.
D)None of these
Answer: Both
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State