Q. Reminder Caution Order is?

Correct Answer

T/B409

More Questions on Indian Railway

  • Q. How much minimum BP pressure is reduce to require to apply brake in a goods train?
    A)1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
    B)Less than1.0 kg/cm2 B. 1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
    C)1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
    D)
    Answer: Less than1.0 kg/cm2 B. 1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
  • Q. The number of Train examination report is ________.
    A)T/436
    B)T/431
    C)T/432
    D)T/436
    Answer: T/431
  • Q. What is the maximum speed of a goods train pushed backed from block section ?
    A)15/8 kmph
    B)15 kmph
    C)8 kmph
    D)None of these
    Answer: 8 kmph
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the brake van.
    A)6.8
    B)7.8
    C)5.8
    D)4.8
    Answer: 4.8
  • Q. What action should be taken by LP while observed Abnormal jurk in Ist block section of IBS?
    A)If he failed to inform to SM, protection of the portion by Guard
    B)Inform to SM through IBP phone
    C)Check his train
    D)All of above
    Answer: All of above
  • Q. The turning out time of an MRV Spl. When in is kept in one exit siding is ________ minutes.
    A)20
    B)25
    C)15
    D)None of these
    Answer: 25
  • Q. Where is the wheel and axle plant of Indian Railways situated ?
    A)Mysore
    B)Chennai
    C)Bangalore
    D)Chitradurga
    Answer: Bangalore
  • Q. Load table is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
    A)Only 1 & 3
    B)Only 1 & 2
    C)Only 2 & 3
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. What is the speed of a train after normalized in OHE supply immediate after tripping?
    A)40/15 kmph
    B)60/30 kmph
    C)35/20 kmph
    D)Normal speed
    Answer: 35/20 kmph
  • Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
    A)ACC4
    B)ACC2
    C)ACC3
    D)None of these
    Answer: ACC4
  • Q. Block overlap in two aspect signalling system is ________ meters.
    A)400
    B)500
    C)600
    D)600
    Answer: 400
  • Q. Guard shall use ________ bell code to warn the motorman, if motorman violated the speed.
    A)0-00-00
    B)000-000
    C)00-00
    D)000-000-000
    Answer: 000-000
  • Q. At a station in gradient in 1-260 or steeper, during shunting the Engine must be on the ________ gradient.
    A)Both
    B)UP
    C)Falling
    D)None of these
    Answer: UP
  • Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is
    A)10 kmph
    B)5 kmph
    C)8 kmph
    D)None of these
    Answer: 5 kmph
  • Q. For a passenger carrying train to stop with a few passengers vehicles beyond platform, it must be permitted by
    A)DOM
    B)DSO
    C)DRM
    D)None of these
    Answer: DRM
  • Q. Consider the following railway zones with their headquarters: West Central Railway→ Jabalpur East Coast Railway → Bhubaneswar Western Railway→ Mumbai Which of the above is / are correct?
    A)1, 2 & 3
    B)1 & 2 Only
    C)2 & 3 Only
    D)None
    Answer: 1, 2 & 3
  • Q. Which of the following is India’s first green railway corridor?
    A)Chennai to Manamadurai
    B)Barmer to Munawab
    C)Manamadurai to Rameswaram
    D)Puri to Visakhapatnam
    Answer: Manamadurai to Rameswaram
  • Q. Max. Speed of special train with 132 tonne bogie well wagon shall be ________ km/h.
    A)35
    B)20
    C)25
    D)30
    Answer: 30
  • Q. The railway station situated in the extreme south is
    A)Kanyakumari
    B)Chennai
    C)Cochin
    D)Trivandrum
    Answer: Kanyakumari

Leave a Comment