More Questions on Indian Railway
- Q. If the SE (P.way) is not with the train, maximum speed at the spot of lurch shall be ________ km/h.
A)10
B)15
C)20
D)25
Answer: 10
- Q. What type of speed restriction imposed for loco pilot when at LC gate communication not available between Gateman & Station Master ?
A)8 kmph
B)15 kmph
C)10 kmph
D)Normal
Answer: 10 kmph
- Q. To admit the train on loop line, generally the far end points are to be ser for ________.
A)Both
B)Loop line
C)Main line
D)None of these
Answer: Main line
- Q. In case of accident, siren is repeated at an interval of ________ minutes.
A)20
B)10
C)15
D)5
Answer: 5
- Q. Launched three Trains to improve Quality of Travel (for reserved passengers), these are:
A)Dirubhargh, Sahayak and Humsafar
B)Humsafar, Tejas and Uday
C)Tejas, Antyodaya and Gatiman
D)Sahayak,Antyodaya and Gatiman
Answer: Humsafar, Tejas and Uday
- Q. Headquarters of which one among the following Railway Zones in India is situated at the highest elevation from the mean sea level?
A)South Western Railway
B)East Central Railway
C)South Eastern Railway
D)West Central Railway
Answer: South Western Railway
- Q. What is maximum width of coaching stock in BG?
A)3250 mm
B)3050 mm
C)3200 mm
D)3300 mm
Answer: 3250 mm
- Q. During accident or Engine failure in the mid section the report sent to SM must be signed by ________.
A)Both
B)GDR
C)TDR
D)None of these
Answer: GDR
- Q. When the calling on signal is taken off, it indicates the loco pilot to proceed ________ and be prepared to stop short of any obstruction.
A)Defective
B)Caution
C)Cautiously
D)None of these
Answer: Cautiously
- Q. While clearing the load with an invalid brake power certificate, if train examiner is not available, Loco Pilot and Guard shall ensure safety of the train and take the train upto ________.
A)Executive
B)Examine
C)Next Examine
D)None of these
Answer: Next Examine
- Q. Engineering allowance, loco gain and traffic gain are mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. Indian Railways is constructing the country’s longest railway tunnel and tallest bridge in which of the following states?
A)Assam and Maharashtra
B)Manipur and Jammu & Kashmir
C)Jammu & Kashmir & Assam
D)Maharashtra and Jammu & Kashmir
Answer: Manipur and Jammu & Kashmir
- Q. In which of the following cities, the first subway train was started?
A)Kolkata
B)Mumbai
C)Delhi
D)Chennai
Answer: Kolkata
- Q. In MACLS system, if approach signal becomes blank, ________ authority is issued from the station in rear.
A)T/407
B)T/409
C)T/408
D)T/406
Answer: T/409
- Q. If a military personnel is injured or killed in railway premises the DRM shall advise ________ New Delhi.
A)Army Head Quarter
B)Railway Board
C)Zonal HQ
D)None of these
Answer: Army Head Quarter
- Q. Where is the Indian Railways Institute of Civil Engineering Institute situated?
A)Nasik
B)Pune
C)Chennai
D)Secunderabad
Answer: Pune
- Q. How much distance was travelled by first train of India?
A)34 km
B)33 km
C)36 km
D)46 km
Answer: 34 km
- Q. Which of the following will become the first central paramilitary force to opt for e – ticketing instead of Railway warrant?
A)Central Reserve Police Force
B)Assam Rifles
C)National Security Guard
D)Sashastra Seema Bal
Answer: National Security Guard
- Q. For imposition of line block application must be sent ________ Hours in advance.
A)18
B)24
C)12
D)22
Answer: 24
- Q. Validity of the competency certificate of the gateman is for ________ years.
A)9
B)10
C)3
D)4
Answer: 3