Q. On which speed BG engine shall be run while speedometer is defective during run?

Correct Answer

Maximum 10% less of MPS

More Questions on Indian Railway

  • Q. Tank engine can run at ________ speed if cow catcher and head light during night is provided.
    A)50 kmph
    B)Booked
    C)Sectional
    D)None of these
    Answer: Sectional
  • Q. The speed of Motor Trolly over points and crossings is
    A)15 kmph
    B)10 kmph
    C)8 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Guard of goods train shall sign on ________ minutes before the actual departure of the train.
    A)40
    B)45
    C)30
    D)35
    Answer: 45
  • Q. Impact speed of shunting of one box wagon is ________ km/h.
    A)6
    B)2
    C)5
    D)8
    Answer: 5
  • Q. Which road suburban railway station in Mumbai has been rechristened as Prabhadevi station?
    A)Churchgate
    B)Boisar
    C)Andheri
    D)Elphinstone
    Answer: Elphinstone
  • Q. How many training institutions of Railways are in India?
    A)Five
    B)Three
    C)Four
    D)Six
    Answer: Five
  • Q. The passenger bogies of the Indian Railways are manufactured at which of the following places?
    A)Perambur
    B)Kapurthala
    C)Chittranjan
    D)Bangalore
    Answer: Perambur
  • Q. When was Petrol Rail car started on Kalka – Shimla Rail route?
    A)1918
    B)1911
    C)1913
    D)1917
    Answer: 1911
  • Q. Capacity of a catch siding is ________.
    A)Station
    B)Equivalent to length of full train
    C)Length
    D)None of these
    Answer: Equivalent to length of full train
  • Q. In the enroute, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 90
  • Q. “Act” means the Railway Act is ________.
    A)1989 (22 of 1989)
    B)1989 (24 of 1989)
    C)1989 (23 of 1989)
    D)None of these
    Answer: 1989 (24 of 1989)
  • Q. Isolation shall be provided at an interlocked station when the speed is
    A)Above 50 kmph
    B)50 kmph
    C)75 kmph
    D)None of these
    Answer: Above 50 kmph
  • Q. Knowledge of subsidiary rules is examined by ________ if train working staff of another Railway is required to work on our Railway.
    A)LI
    B)TI
    C)CI
    D)None of these
    Answer: TI
  • Q. Notice station notified in?
    A)SR
    B)SWR
    C)GR
    D)Working Time Table
    Answer: Working Time Table
  • Q. Maximum impact speed when shunting a group of roller bearing fitted stock coupled together must be?
    A)3 kmph
    B)2 kmph
    C)2.5 kmph
    D)3.5 kmph
    Answer: 2.5 kmph
  • Q. Consider the following statements about the Railwire Saathi project: 1)It is an initiative by the Indian Railway Stations Development Corporation Limited (IRSDC) 2)It aims to provide railway stations in India with high – speed public Wi – Fi service Which of the above statements is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: 2 Only
  • Q. Signal sighting committee shall submit its report on form ________.
    A)T/101 B
    B)T/103 B
    C)T/102 B
    D)None of these
    Answer: T/102 B
  • Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.
    A)15
    B)25
    C)20
    D)10
    Answer: 25
  • Q. Staff of ________ department shall protect the material train while working in block section.
    A)Engineering
    B)Operation
    C)C & W
    D)None of these
    Answer: Engineering
  • Q. Signals are normally located to the ________ side of the line.
    A)Both
    B)Right
    C)Left
    D)None of these
    Answer: Left