- Q. When VP vehicles are attached in a goods train the maximum number of VPvehicle in one group is
A)8
B)10
C)6
D)None of these
Answer: 6
- Q. Single line working inforce on double line.
A)T/D 602
B)T-511
C)T-512
D)Simple memo
Answer: T/D 602
- Q. After how much time Any goods train shall be treated as overdue train?
A)After 20 minutes
B)After 10 minutes
C)After 15 minutes
D)After 25 minutes
Answer: After 20 minutes
- Q. What was the main source of earning of Railway?
A)Catering
B)Goods fair
C)Passenger fair
D)None of thses
Answer: Goods fair
- Q. On seeing defective stop signal during train working, Loco Pilot will sound ________ whistle to inform the same.
A)One long one short
B)One Long Two Short
C)Two long one short
D)None of these
Answer: One Long Two Short
- Q. In the event of an accident falling in more than one class it should be treated as an accident in the ________ class.
A)Both
B)Lowest
C)Highest
D)None of these
Answer: Highest
- Q. Read the Following Railway Headquarters and Identify which is False?
A)South Railway - Chennai
B)South - Central Railway - Secunderabad
C)Central railway - Bhopal
D)North Railway - New Delhi
Answer: Central railway - Bhopal
- Q. During serious accident, ________ will be the in-charge of control office.
A)Sr. DOM
B)DOM
C)AOM
D)None of these
Answer: Sr. DOM
- Q. After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.
A)T/606
B)T/605
C)T/606
D)T/609
Answer: T/609
- Q. Point indicator shows ________ light when the points are set for loop line.
A)S&T (T/350)
B)S&T (T/351)
C)S&T (T/352)
D)S&T (T/315)
Answer: S&T (T/351)
- Q. What is the speed of second train on double line section running on T/A602?
A)10 kmph
B)20 kmph
C)15 kmph
D)8 kmph
Answer: 8 kmph
- Q. How many Class of Accident?
A)20
B)14
C)16
D)None of these
Answer: 16
- Q. The time taken for formation of a goods train in flat yard is
A)3 kmph
B)2 hrs
C)1 hr
D)None of these
Answer: 2 hrs
- Q. Which of the following is the largest marshalling yard in India (also the longest in Asia)?
A)Itarsi
B)Mughalsarai
C)Mathura
D)Guntakal
Answer: Mughalsarai
- Q. Speed of second train during temporary single line working is ________.
A)Both
B)Normal
C)Abnormal
D)None of these
Answer: Normal
- Q. During single line working on double line in automatic area the speed of all train running in wrong direction shall not exceed
A)10 kmph
B)25 kmph
C)15 kmph
D)None of these
Answer: 25 kmph
- Q. If the motorman of EMU passes the automatic stop signal at ON, he shall proceed at a speed of 15/8 km/h and stop the train before ________ meters of the obstruction on the track.
A)80
B)70
C)75
D)85
Answer: 75
- Q. SLB determines the limits of block section and ________.
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Station Section
- Q. In MACLS system, if approach signal becomes blank, ________ authority is issued from the station in rear.
A)T/407
B)T/409
C)T/408
D)T/406
Answer: T/409
- Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
A)10
B)7
C)9
D)15
Answer: 7