- Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
A)10 meters
B)20 meters
C)15 meters
D)5 meters
Answer: 20 meters
- Q. Which of the following faunal species found in India are invasive species? 1)Railway Creeper 2)Lantana 3)Black wattle Select the correct option from the codes given below:
A)Only 2 & 3
B)Only 1
C)Only 1 & 2
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. Calling on signal is placed below any stop signal except ________.
A)Stop Signal
B)First stop signal
C)Last Stop signal
D)None of these
Answer: Last Stop signal
- Q. During Thick or Foggy weather, 2 Detonators must be placed in rear of Engineering indicator at
A)400 meters
B)270 meters
C)90 meters
D)None of these
Answer: 90 meters
- Q. Kacheguda railway station has declared the India’s first Energy – Efficient ‘A1 Category’ Railway Station. It is situated in which city?
A)Kochi
B)Hyderabad
C)Chennai
D)Kolkata
Answer: Hyderabad
- Q. Which of the following zonal headquarters – city combination is incorrect?
A)East Central - Hajipur
B)South East Central - Bilaspur
C)North Western - Jodhpur
D)West Central - Jabalpur
Answer: North Western - Jodhpur
- Q. In case of goods train without brake van, Guard is exempted from ________.
A)Whistling
B)ARS
C)Tail Lamp
D)None of these
Answer: ARS
- Q. When a signal is out of use two cross bars will be put across with ________ long and 10 CM wide.
A)03 meter
B)01 meter
C)02 meter
D)04 meter
Answer: 01 meter
- Q. The number of private number sheet is ________.
A)T/99 D
B)T/99 F
C)T/99 A
D)T/99 E
Answer: T/99 F
- Q. For block forwarded form ________ must be issued.
A)Both
B)T/806+LSSS
C)T/608
D)None of these
Answer: T/806+LSSS
- Q. A platform surrounded by rail lines from all the four sides, is called
A)Island platform
B)Dock platform
C)Passenger platform
D)Goods platform
Answer: Island platform
- Q. How many systems of working in Indian Railways for train operation?
A)8
B)6
C)7
D)9
Answer: 6
- Q. After how many time train shall be protected by Guard in rear if 1st stop signal found in On position?
A)15 minutes
B)10 minutes
C)5 minutes
D)No need
Answer: 15 minutes
- Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
A)15 km
B)8 km
C)10 km
D)25 km
Answer: 25 km
- Q. Marshalling rules of passenger train are framed by ________.
A)DRM
B)DOM
C)COM
D)AOM
Answer: COM
- Q. DRM nominates ________ for each section to issue caution orders to train crew.
A)Nil notice
B)Caution notice station
C)Notice
D)None of these
Answer: Caution notice station
- Q. Second train during TSL will be dispatched after ________.
A)Both
B)Line clear
C)Without line clear
D)None of these
Answer: Line clear
- Q. What is maximum width of coaching stock in BG?
A)3250 mm
B)3050 mm
C)3200 mm
D)3300 mm
Answer: 3250 mm
- Q. What will be the maximum speedof train in case of failure of headlight of engine?
A)60 kmph
B)30 kmph
C)40 kmph
D)Normal speed
Answer: 40 kmph
- Q. Hand shunting speed is ________
A)8 kmph
B)5 kmph
C)10 kmph
D)None of these
Answer: 5 kmph