More Questions on Indian Railway
- Q. All automatic stop signals will have ________ marker plate.
A)G
B)B
C)A
D)None of these
Answer: A
- Q. Signal has extinguished.
A)------00
B)___0___
C)0___0
D)00___
Answer: ------00
- Q. The headquarters of South Railways is situated at
A)Delhi
B)Kolkata
C)Chennai
D)Mumbai
Answer: Chennai
- Q. In two aspects areas where shunting in the face of approaching train is not permitted, shunting can be permitted during ________ and under certain conditions (UP to FSS).
A)Both
B)Day
C)Night
D)None of these
Answer: Day
- Q. By whom the rear portion of train left behind in block section protected?
A)By engineearing official
B)By Guard
C)By LP
D)No need to protect the load
Answer: By Guard
- Q. At what time the first train in India (and in Asia) flagged off?
A)Saturday, 03:35 PM
B)Saturday, 8:50 AM
C)Sunday, 10:00 AM
D)Sunday, 02:30 PM
Answer: Saturday, 03:35 PM
- Q. The maximum speed of the assistance train to be sent on T/A 602
A)30 kmph
B)10 kmph
C)15 kmph
D)40 kmph
Answer: 15 kmph
- Q. for the purpose of shunting is gradient the steeper gradient for Roller bearing vehicle is
A)ST 1-260
B)ST 1-400
C)1-400 or sleeper
D)None of these
Answer: 1-400 or sleeper
- Q. DRM nominates ________ for each section to issue caution orders to train crew.
A)Nil notice
B)Caution notice station
C)Notice
D)None of these
Answer: Caution notice station
- Q. Who will be called Sahayak?
A)Coolies
B)New Superfast Train
C)Upcoming Event made for Disabled Persons
D)Railway Magazine (including Railway's upcoming ventures)
Answer: Coolies
- Q. Danger zone in 25 KV AC traction is ________ meters from OHE.
A)3
B)1
C)2
D)4
Answer: 2
- Q. Modified lower quadrant signaling may be introduced only with section of
A)GM
B)Railway Board
C)CRS
D)None of these
Answer: CRS
- Q. Motor Trolly can follow another motor trolly during
A)Day and Night clear weather
B)Day and Night
C)Day only
D)None of these
Answer: Day and Night clear weather
- Q. The main objective of British developing Indian Railway system was to facilitate the traffic between?
A)Source of raw material and production centers
B)Source of raw material and export centers
C)Source of raw material and ports
D)Source of raw material and markets
Answer: Source of raw material and production centers
- Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
A)8 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. Shutting signal in the color light signal system under the starter of which light is visible in the on-condition?
A)Single white
B)Yellow
C)Two White parallel
D)No light
Answer: No light
- Q. When the Head light fails during night the speed of train is ________ in BG. If there is no other caution for less speed is the Block section
A)25 kmph
B)30 kmph
C)40 kmph
D)None of these
Answer: 40 kmph
- Q. Repeating signal shows ________ light in ON condition.
A)Green
B)Red
C)Yellow
D)None of these
Answer: Red
- Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
A)10
B)7
C)9
D)15
Answer: 7
- Q. For ‘B’ Class ISMD load, permission must be granted by
A)CE
B)DRM
C)CRS
D)None of these
Answer: CE
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State