Q. The maximum speed of the assistance train to be sent on T/A 602
A)30 kmph B)10 kmph C)15 kmph D)40 kmph
Answer: 15 kmph
Q. With respect to ‘Operating ratio’ in Railways, which of the following statement is/are correct? 1)The higher is the ‘Operating Ratio’; the better is the economic condition of railways. 2) ‘Operating ratio’ of Indian Railways is high on account of social service obligation imposed in Budget. Select the correct option from the codes given below
A)Both 1 & 2 B)Only 1 C)Only 2 D)Neither 1 nor 2
Answer: Only 2
Q. For imposition of line block application must be sent ________ Hours in advance.
A)18 B)24 C)12 D)22
Answer: 24
Q. How many institutions do give suggestions for railways technology?
A)Three B)One C)Two D)Four
Answer: Two
Q. Reminder Caution Order is?
A)T/B409 B)T/409 C)T/A409 D)None of these
Answer: T/B409
Q. Signal sighting committee shall submit its report on form ________.
A)T/101 B B)T/103 B C)T/102 B D)None of these
Answer: T/102 B
Q. Used for A self propelled vehicle repairs in OHE is
A)Moped Trolley B)Tower wagon C)Ladder Trolley D)None of these
Answer: Tower wagon
Q. The Maitree Express connects India with which of the following countries?
A)Bangladesh B)Myanmar C)Pakistan D)Nepal
Answer: Bangladesh
Q. At which of the following places steam engines were originally manufactured by Indian Railway ?
A)Chittranjan B)Varanasi C)Perambur D)Patiala
Answer: Chittranjan
Q. Depot in-charge is responsible to test the detonators once in ________.
A)Year B)Monthly C)Weekly D)None of these
Answer: Year
Q. Number of the Nil caution order is ________.
A)T/C 410 B)T/A 409 C)T/B 408 D)None of these
Answer: T/A 409
Q. In the classification of A to R accidents, ________ and ‘o’ classes are not included.
A)Both B)Minor C)Serious D)None of these
Answer: Serious
Q. Station in rear issues for passing Approach stop signal at ON
A)T-369(1) B)T-509 C)T-369(3b) D)Simple memo
Answer: T-369(1)
Q. The speed of cycle/moped trolley is
A)20 kmph B)15 kmph C)10 kmph D)None of these
Answer: 10 kmph
Q. Signal that controls the entry of trains into the block section in advance is called as
A)Last Stop signal B)Fisrt Stop signal C)Stop signal D)None of these
Answer: Last Stop signal
Q. Trolley caution order no is ________.
A)600 B)400 C)500 D)800
Answer: 400
Q. After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
A)LI B)TI C)CI D)None of these
Answer: TI
Q. Fog signal man must be on ________ Hrs duty.
A)5 B)3 C)4 D)None of these
Answer: 3
Q. After the detonator explodes if Driver does not find any signal he can proceed upto ________ Km cautiously