More Questions on Indian Railway
- Q. What is the maximum speed of shunting of a petrol tank wagon?
A)2 kmph
B)15 kmph
C)8 kmph
D)5 kmph
Answer: 8 kmph
- Q. Block overlap in multiple aspect signalling system is ________ meters.
A)180
B)200
C)300
D)208
Answer: 180
- Q. Station limit is the portion between ________.
A)Both
B)Outermost signal
C)Innermost signal
D)None of these
Answer: Outermost signal
- Q. Who is the current director general of Railway Protection Force (RPF)?
A)Dharmendra Kumar
B)Brij Mohanty
C)S H Prakash
D)Arun Kumar
Answer: Arun Kumar
- Q. Point indicator is provided to indicate ________.
A)Both
B)Points
C)Bar
D)None of these
Answer: Points
- Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
A)Call-on Signal
B)Fixed stop signal
C)Hand Signal
D)None of these
Answer: Fixed stop signal
- Q. Station working rules of an interlocked station is prepared by Sr. DOM and ________.
A)Sr. DSTE
B)DOM
C)COM
D)None of these
Answer: Sr. DSTE
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
A)3
B)5
C)2
D)4
Answer: 5
- Q. Loco Pilot shall sound ________ whistle if SM do not exchange hand signals.
A)One short
B)Two short
C)Three short
D)Noen of these
Answer: Two short
- Q. TSL is started between those two stations at which cross over facility are available and
A)D Class/IBC
B)A Class/IBS
C)C Class/IBS
D)None of these
Answer: C Class/IBS
- Q. In token territory, ________ is authority for shunting up to FSS.
A)T/806
B)Shunt Mental Token+T/806
C)Shunt Mental
D)None of these
Answer: Shunt Mental Token+T/806
- Q. Which state to have India’s first privately – run railway station?
A)Kerala
B)Tripura
C)Odisha
D)Madhya Pradesh
Answer: Madhya Pradesh
- Q. Which is the least signalto be installed on C class stations in multiple aspect signalling?
A)Warner, Home
B)Outer, Home
C)Distant, Home
D)Distant, Home, Starter
Answer: Distant, Home
- Q. On which place the competent Railway servant shall be appointed to show proceed hand signal while receive a train on obstructed line on calling-on signal?
A)45 meters beyond the obstruction
B)At 1st facing point of station
C)Facing point of concern line
D)No need
Answer: 45 meters beyond the obstruction
- Q. When did the first ignition engine develop?
A)1900
B)1890
C)1892
D)1904
Answer: 1892
- Q. BD special shall be turned out during night within
A)30 meters
B)25 meters
C)45 meters
D)None of these
Answer: 45 meters
- Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?
A)North Korea
B)Japan
C)South Korea
D)China
Answer: Japan
- Q. DRM permission is necessary when hand shunting outside station section takes place in gradient
A)ST 1-260
B)ST 1-600
C)1-400
D)None of these
Answer: ST 1-600
- Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
A)ACC4
B)ACC2
C)ACC3
D)None of these
Answer: ACC4
- Q. The headquarters of South – Central Railways is situated at
A)Secunderabad
B)Mumbai (CST)
C)Chennai
D)Mumbai (Central)
Answer: Secunderabad
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State