More Questions on Indian Railway
- Q. The manufacturing of steam engine in Chittranjan Locomotive Works was stopped in
A)1972
B)1974
C)1961
D)1973
Answer: 1972
- Q. The speed of cycle/moped trolley is
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. Which of the following zones administers the Matheran Hill Railway?
A)Central Railways
B)Konkan Railways
C)Western Railways
D)Southern Railways
Answer: Central Railways
- Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
A)5
B)10
C)20
D)None of these
Answer: 10
- Q. Standard time is set at all station every day ________ Hours
A)16
B)10
C)15
D)None of these
Answer: 16
- Q. P marker is provided for a
A)Semaphore warner
B)Colour light distance
C)Semaphore distant
D)None of these
Answer: Colour light distance
- Q. For imposition of line block application must be sent ________ Hours in advance.
A)18
B)24
C)12
D)22
Answer: 24
- Q. When signal is not visible from minimum sighting distance, ________ signal is provided.
A)Shunt
B)Repeating
C)Call-on
D)None of these
Answer: Repeating
- Q. SLB determines the limits of Station section and ________
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Block Section
- Q. Consider the following: 1)Real Estate Investment Trust 2)Railway operation 3)Atomic Energy As of now, there is no FDI in India, in which of above sector(s)?
A)1, 2 & 3
B)1 Only
C)1 & 2 Only
D)None
Answer: 1, 2 & 3
- Q. Colour of the semaphore shunt signal is ________.
A)Green
B)Red
C)Yellow
D)None of these
Answer: Red
- Q. Distance between outer and home signals on a single line is ________ meters when there is advanced starter or SLB in the opposite direction.
A)540
B)900
C)580
D)570
Answer: 580
- Q. India’s first rail auto hub will be located in:
A)Delhi
B)Kolkata
C)Chennai
D)New Delhi
Answer: Chennai
- Q. If leakage in LPG Tank, how long area is prohibited to carry to burn the burning fire ?
A)100 meters
B)45 meters
C)50 meters
D)1000 meters
Answer: 45 meters
- Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
A)Call-on Signal
B)Fixed stop signal
C)Hand Signal
D)None of these
Answer: Fixed stop signal
- Q. Visibility test object is placed at a distance of ________ meters from the station building.
A)180
B)108
C)100M
D)200
Answer: 180
- Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
A)Sound energy
B)Potential energy
C)Electricity
D)Magnetic energy
Answer: Electricity
- Q. Permission of ________ is required to work the material train in the night.
A)DRM
B)AOM
C)DOM
D)None of these
Answer: DRM
- Q. It is a Python Rake.
A)15 kmph
B)60 kmph
C)25 kmph
D)Normal speed
Answer: 60 kmph
- Q. To start the train from a line with common starter, ________ authority is issued.
A)T/512
B)T/516
C)T/517
D)T/511
Answer: T/512
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State