- Q. When the driver reports rough running or lurch on the run, the SM to issue caution order with speed ________ kmph
A)20
B)10
C)15
D)None of these
Answer: 10
- Q. After how much time Any goods train shall be treated as overdue train?
A)After 20 minutes
B)After 10 minutes
C)After 15 minutes
D)After 25 minutes
Answer: After 20 minutes
- Q. What type of speed restriction imposed for loco pilot when at LC gate communication not available between Gateman & Station Master ?
A)8 kmph
B)15 kmph
C)10 kmph
D)Normal
Answer: 10 kmph
- Q. How many officers may be attached with light engine?
A)1
B)2
C)3
D)None of these
Answer: 3
- Q. Colour of the semaphore distant signal is ________.
A)Yellow
B)Red
C)White
D)Green
Answer: Yellow
- Q. Mission PACE deals with
A)Fast Ticketing System
B)Protection of nature
C)Help Customers
D)Quality of Goods and Services
Answer: Quality of Goods and Services
- Q. For Block Back form ________ To be issued on DL.
A)T/B-806+PN
B)T/806+PN
C)T/A806+PN
D)None of these
Answer: T/806+PN
- Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.
A)Both
B)Red Light
C)Green Light
D)None of these
Answer: Red Light
- Q. During thick & foggy weather, line must be clear upto ________ for granting line clear at a B’ class station in TALQ signalling system on Double line.
A)Shunt signal
B)Calling-on Signal
C)Home Signal
D)None of these
Answer: Home Signal
- Q. Which of the following is the headquarters of the newly established railway zone ‘East Coast Railways’?
A)Hyderabad
B)Visakhapatnam
C)Kolkata
D)Bhubaneswar
Answer: Bhubaneswar
- Q. Block back are used at?
A)Single/Double line both
B)On Single line
C)On Double line
D)None of these
Answer: Single/Double line both
- Q. To send the assisting engine into obstructed block section T/A 602 authority is issued ________ and the speed of engine shall be ________.
A)15/10 km/h
B)25/10 km/h
C)20/10 km/h
D)None of these
Answer: 15/10 km/h
- Q. ________ tail board will be used is EMU train.
A)Turn Over & Turn Flow
B)Turnover
C)Turn Flow
D)None of these
Answer: Turnover
- Q. In case of movement from one station to another station upto how many track machine with one camping coach each shall be allowed under one authority to proceed?
A)8
B)3
C)5
D)10
Answer: 3
- Q. Adequate distance means the distance sufficient to ensure ________.
A)Station Limit
B)Safety
C)Non-Safety
D)None of these
Answer: Safety
- Q. When the rail failure is rectified by the train can pass at speed
A)30 kmph
B)20 kmph
C)25 kmph
D)None of these
Answer: 30 kmph
- Q. The consumption of fuel during idle run per hour is
A)25 Lts
B)15 Lts
C)20 Lts
D)None of these
Answer: 25 Lts
- Q. Which of the following stations has all the three gauges viz. broad, metre and narrow?
A)Shimla
B)Lucknow
C)Chandigarh
D)Siliguri
Answer: Siliguri
- Q. Distant signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Permissive
- Q. Which among the following becomes the part of Consolidated Fund of India? 1)Capitation Taxes 2)Taxes on railway fares and freights 3)Taxes on sale and purchase of newspapers and advertisements therein Select the correct option from the codes given below:
A)Only 3
B)Only 1 & 2
C)Only 2 & 3
D)None of them
Answer: None of them
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State