Q. Number of the Nil caution order is ________.

Correct Answer

T/A 409

More Questions on Indian Railway

  • Q. In case of defective home signal of C’ class station, T/369(3b) authority is issued on which ________ of the staion in advance is written.
    A)Authority
    B)Private Number
    C)Cuation Number
    D)None of these
    Answer: Private Number
  • Q. Water over track is 90 mm.
    A)15 kmph
    B)8 kmph
    C)10 kmph
    D)25 kmph
    Answer: 10 kmph
  • Q. Booked speed of a train is ________ percent less than maximum permissible speed
    A)15
    B)5
    C)10
    D)20
    Answer: 10
  • Q. Line clear is obtained from ________ / ________ to send the train upto IBS.
    A)Counter circuit
    B)Track circuit/axle counter
    C)Circuit
    D)None of these
    Answer: Track circuit/axle counter
  • Q. New freight corridors announced at ________
    A)Kharagpur - Vijayawada
    B)Delhi - Chennai
    C)Kharagpur - Mumbai
    D)Gujarat - Agra
    Answer: Gujarat - Agra
  • Q. What is the name of the first train of Indian Railways handed over to private players for operation?
    A)Karnataka Express
    B)Tejas Express
    C)Shatabdi Express
    D)Duronto Express
    Answer: Tejas Express
  • Q. Sand hump is a substitute to ________ and also a means of isolation.
    A)Over signal
    B)Signal
    C)Signal overlap
    D)None of these
    Answer: Signal overlap
  • Q. When was the first train in India started?
    A)1853
    B)1851
    C)1852
    D)1854
    Answer: 1853
  • Q. Is general manager responsible for?
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)None of these
    Answer: Railway Board
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the engine.
    A)5
    B)4
    C)2
    D)8
    Answer: 5
  • Q. Depot in-charge is responsible to test the detonators once in ________.
    A)Year
    B)Monthly
    C)Weekly
    D)None of these
    Answer: Year
  • Q. Which railway zone has become the first Rail Zone in India with 100% LED Lighting at railway stations?
    A)South Western Railway
    B)North Eastern Railway
    C)South Central Railway
    D)North Central Railway
    Answer: South Central Railway
  • Q. Departmental enquiry must be ordered by ________.
    A)DRM
    B)Sr. DPO
    C)COM
    D)Sr. DOM
    Answer: DRM
  • Q. When the section is occupied, the arrow indication in the panel in Twin single line working will be
    A)No light
    B)White
    C)Red
    D)None of these
    Answer: Red
  • Q. Normally maximum gradient in station yards in BG is (at present)
    A)1 in 1000
    B)1 in 260
    C)1 - 400
    D)None of these
    Answer: 1 - 400
  • Q. Height gauge is for the safety of ________.
    A)Motor Trolley
    B)Trolley
    C)Ohe
    D)None of these
    Answer: Ohe
  • Q. The time taken for formation of a goods train in flat yard is
    A)3 kmph
    B)2 hrs
    C)1 hr
    D)None of these
    Answer: 2 hrs
  • Q. for the purpose of shunting is gradient the steeper gradient for Roller bearing vehicle is
    A)ST 1-260
    B)ST 1-400
    C)1-400 or sleeper
    D)None of these
    Answer: 1-400 or sleeper
  • Q. When signal is not visible from minimum sighting distance, ________ signal is provided.
    A)Shunt
    B)Repeating
    C)Call-on
    D)None of these
    Answer: Repeating
  • Q. SLB determines the limits of block section and ________.
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Station Section