Q. Number of the Nil caution order is ________.

Correct Answer

T/A 409

More Questions on Indian Railway

  • Q. Train is to be passed through loop line.
    A)30 kmph
    B)15 kmph
    C)25 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. ________ tail board will be used is EMU train.
    A)Turn Over & Turn Flow
    B)Turnover
    C)Turn Flow
    D)None of these
    Answer: Turnover
  • Q. Maximum No. of ________ track machines can be sent for working in a block section.
    A)25
    B)20
    C)15
    D)30
    Answer: 25
  • Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
    A)25/10 kmph
    B)15/8 kmph
    C)25/8 kmph
    D)25/12 kmph
    Answer: 25/8 kmph
  • Q. How many surrounding area may be sealed from fire in case of leakage in LPG tank wagon?
    A)1500 meters
    B)200 meters
    C)1000 meters
    D)2000 meters
    Answer: 1000 meters
  • Q. ________ must be issued during thick or foggy weather.
    A)Reminder Caution Order
    B)Caution Order
    C)Nil Caution Order
    D)Minimum Caution Order
    Answer: Caution Order
  • Q. If the driver does not received all right signal from the guard, he must call for is by giving.
    A)On long
    B)Two sharp whistles
    C)One long one short.
    D)None of these
    Answer: Two sharp whistles
  • Q. The time limit for starting BD special during day is ________.
    A)30 meters
    B)20 meters
    C)15 meters
    D)40 meters
    Answer: 30 meters
  • Q. Caution order is carried forward at stations on ________ at 09:00 hours.
    A)Monday
    B)Tueday
    C)Sunday
    D)None of these
    Answer: Monday
  • Q. Target time for ARME from double exit siding is?
    A)45 minutes
    B)20 minutes
    C)30 minutes
    D)60 minutes
    Answer: 20 minutes
  • Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
    A)800 Meter
    B)1200 Meter
    C)1000 Meter
    D)500 Meter
    Answer: 800 Meter
  • Q. In Automatic Block system , in BG when there is obstruction in the adjacent line, driver to protect the adjacent line first by placing one detonator at not less than ________ , metres.
    A)1200
    B)600
    C)800
    D)None of these
    Answer: 600
  • Q. Railway Staff College is situated at
    A)Chennai
    B)Bangalore
    C)Secunderabad
    D)Vadodara
    Answer: Vadodara
  • Q. Warning boards for neutral section shall be fixed at a distance of
    A)300 and 600 meters
    B)400 and 600 meters
    C)500 and 250 meters
    D)None of these
    Answer: 500 and 250 meters
  • Q. Only ________ persons other than the motor man/guard are authorized to travel in the cab in EMU
    A)6
    B)2
    C)4
    D)8
    Answer: 2
  • Q. Signal passed at danger is treated as ________ accident.
    A)Indirection
    B)Indicative
    C)Direct
    D)None of these
    Answer: Indicative
  • Q. Loss of Railway property of ________ is treated as serious accident.
    A)75 Lakhs
    B)More than 50 lakhs
    C)01 crore
    D)More than 02 crore
    Answer: More than 02 crore
  • Q. Colour of the semaphore repeating signal is ________.
    A)Yellow
    B)Red
    C)White
    D)Green
    Answer: Yellow
  • Q. How an automatic stop signal can be recognized?
    A)Eliminated A marker
    B)A marker on white disk
    C)No mark
    D)Four aspects
    Answer: A marker on white disk
  • Q. With respect to ‘Operating ratio’ in Railways, which of the following statement is/are correct? 1)The higher is the ‘Operating Ratio’; the better is the economic condition of railways. 2) ‘Operating ratio’ of Indian Railways is high on account of social service obligation imposed in Budget. Select the correct option from the codes given below
    A)Both 1 & 2
    B)Only 1
    C)Only 2
    D)Neither 1 nor 2
    Answer: Only 2

Leave a Comment