- Q. If there is no advanced starter at A’ class station, signal overlap will be ________.
A)Block sectiond
B)Next whole block section
C)Back whole block section
D)None of these
Answer: Next whole block section
- Q. Danger zone in 25 KV AC traction is ________ meters from OHE.
A)3
B)1
C)2
D)4
Answer: 2
- Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these
Answer: 25 kmph
- Q. In case of ACP, Assistant Loco Pilot shall proceed towards the rear from ________ side.
A)Back
B)Left
C)Right
D)Noe of these
Answer: Right
- Q. During single line working of DL the speed of the first train is ________ kmph
A)15
B)25
C)20
D)None of these
Answer: 25
- Q. Which of the following zones administers the Matheran Hill Railway?
A)Central Railways
B)Konkan Railways
C)Western Railways
D)Southern Railways
Answer: Central Railways
- Q. SCOR maintains ________ register when serious accident occurs.
A)Chronological
B)Logical
C)Un-logical
D)None of these
Answer: Chronological
- Q. If the Advanced starter is defective and IBS is working, SM shall issue ________ authority with private number of same station to pass the advanced starter.
A)T/369(4b)
B)T/369(3b)
C)T/369(2B)
D)T/369(5b)
Answer: T/369(3b)
- Q. While cancelling ART/MRV, siren shall be sounded for ________ seconds.
A)85
B)60
C)75
D)90
Answer: 90
- Q. The maximum speed of a train while passing through station of interlocking std III is?
A)140 kmph
B)50 kmph
C)110 kmph
D)160 kmph
Answer: 140 kmph
- Q. Which of the following stations has all the three gauges viz. broad, metre and narrow?
A)Shimla
B)Lucknow
C)Chandigarh
D)Siliguri
Answer: Siliguri
- Q. For Block Back form ________ To be issued on DL.
A)T/B-806+PN
B)T/806+PN
C)T/A806+PN
D)None of these
Answer: T/806+PN
- Q. IN the BD Spl, the water must be filled ________.
A)Three Week
B)Once a week
C)Two week
D)None of these
Answer: Once a week
- Q. Which type Authority to proceed shall be used at without starter signal station on single line?
A)Any one
B)Non Tangible
C)Tangible
D)None of these
Answer: Tangible
- Q. Maximum speed of tower wagon is ________ km/h.
A)40
B)25
C)20
D)50
Answer: 40
- Q. Station in rear issues for passing Approach stop signal at ON
A)T-369(1)
B)T-509
C)T-369(3b)
D)Simple memo
Answer: T-369(1)
- Q. Colour of the semaphore shunt signal is ________.
A)Green
B)Red
C)Yellow
D)None of these
Answer: Red
- Q. How much block overlap is required at the station equipped with MACLS?
A)120 meters
B)400 meters
C)180 meters
D)Zero meters
Answer: 180 meters
- Q. What will be the prescribed form for DMT Block?
A)E/223
B)T/409
C)T/806
D)E/233
Answer: E/223
- Q. Consider the following statements about the Railwire Saathi project: 1)It is an initiative by the Indian Railway Stations Development Corporation Limited (IRSDC) 2)It aims to provide railway stations in India with high – speed public Wi – Fi service Which of the above statements is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: 2 Only