More Questions on Indian Railway
- Q. To admit the train on loop line, generally the far end points are to be ser for ________.
A)Both
B)Loop line
C)Main line
D)None of these
Answer: Main line
- Q. Who has been appointed the new Financial Commissioner (FC) of Indian Railways?
A)Anand Mathur
B)A K Prasad
C)S K Bhagat
D)Akhil Agrawal
Answer: A K Prasad
- Q. In case of block forward, private number of ________ station is written on shunting authority.
A)T/809
B)T/806
C)T/809
D)T/810
Answer: T/806
- Q. Which research arm of Indian Railways has launched “New Online Vendor Registration System”?
A)National Academy of Indian Railways
B)Indian Railway Institute of Signal Engineering and Telecommunication
C)Research Designs and Standards Organisation
D)Indian Railway Service of Electrical Engineers
Answer: Research Designs and Standards Organisation
- Q. When was the North – Eastern frontier Railway (NEFR) established?
A)2nd Jan, 1956
B)15th Jan, 1958
C)15th Jan, 1955
D)14th April, 1952
Answer: 15th Jan, 1958
- Q. W/L board will be provided at not less than ________ metres from the gate.
A)600
B)400
C)500
D)800
Answer: 600
- Q. Which of the following is India’s first green railway corridor?
A)Chennai to Manamadurai
B)Barmer to Munawab
C)Manamadurai to Rameswaram
D)Puri to Visakhapatnam
Answer: Manamadurai to Rameswaram
- Q. When water level is just above top of rail speed of electric locomotive shall apply ?
A)15 kmph
B)5 kmph
C)10 kmph
D)20 kmph
Answer: 10 kmph
- Q. Notice station notified in?
A)SR
B)SWR
C)GR
D)Working Time Table
Answer: Working Time Table
- Q. At the starting station, passenger train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
A)Only 1 & 3
B)Only 1 & 2
C)Only 2 & 3
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. In case of defective home signal of C’ class station, T/369(3b) authority is issued on which ________ of the staion in advance is written.
A)Authority
B)Private Number
C)Cuation Number
D)None of these
Answer: Private Number
- Q. Fog signal man must be on ________ Hrs duty.
A)5
B)3
C)4
D)None of these
Answer: 3
- Q. The additional Hours in the case of staff posted at way side stations who are provided with quarters within 0.5kkm will be ________ beyond.
A)24 Hours
B)12 Hours
C)08 Hours
D)16Hours
Answer: 24 Hours
- Q. What is the maximum speed of a train Ist train dispatched after introduced TSL on double line section?
A)15 kmph
B)30 kmph
C)25 kmph
D)Normal speed
Answer: 25 kmph
- Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
A)10 meters
B)20 meters
C)15 meters
D)5 meters
Answer: 20 meters
- Q. What was the main source of earning of Railway?
A)Catering
B)Goods fair
C)Passenger fair
D)None of thses
Answer: Goods fair
- Q. When a token is lost, the lost token notice is issued and it is valid for ________ months.
A)3
B)6
C)4
D)2
Answer: 6
- Q. 400 meters beyond the home signal of a C’ class station is called as ________.
A)Last stop signal
B)Block section
C)Overlapping block section
D)None of these
Answer: Overlapping block section
- Q. Shunting restrictions of station is written in ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: SWR