- Q. Modified lower quadrant signaling may be introduced only with section of
A)GM
B)Railway Board
C)CRS
D)None of these
Answer: CRS
- Q. Block overlap in multiple aspect signalling system is ________ meters.
A)180
B)200
C)300
D)208
Answer: 180
- Q. While shunting a complete train from one line to the other, ________ shall be present in the brakevan.
A)ALP
B)Driver
C)Guard
D)None of these
Answer: Guard
- Q. Hand shunting outside section in gradient ________ is prohibited except with DRM permission.
A)ST 1-800
B)ST 1-600
C)ST 1-700
D)None of these
Answer: ST 1-600
- Q. In automatic block system SL, the minimum equipment of signal shall be
A)Home, Starter, Advance Starter
B)Home, Starter
C)Distance Home Starter
D)None of these
Answer: Home, Starter
- Q. How much distance was travelled by first train of India?
A)34 km
B)33 km
C)36 km
D)46 km
Answer: 34 km
- Q. The main objective of British developing Indian Railway system was to facilitate the traffic between?
A)Source of raw material and production centers
B)Source of raw material and export centers
C)Source of raw material and ports
D)Source of raw material and markets
Answer: Source of raw material and production centers
- Q. Station manager of a big station shall inspect the cabins at least once in ________.
A)Thrice in a week.
B)Once in a week
C)Twice in a week
D)None of these
Answer: Once in a week
- Q. In which of the following cities, the first subway train was started?
A)Kolkata
B)Mumbai
C)Delhi
D)Chennai
Answer: Kolkata
- Q. After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.
A)T/606
B)T/605
C)T/606
D)T/609
Answer: T/609
- Q. Which hooters shall be blown in case of accident on a goods train at outside from ART HQ station?
A)Two
B)Four
C)Three
D)Any one
Answer: Three
- Q. Permission to run C’ class ODC is given by CRS and the maximum speed of train is
A)4
B)2
C)3
D)6
Answer: 2
- Q. On double line, when a running line is blocked by stabled load , the point to be set against are
A)Advance point
B)Either side points
C)Rear points
D)None of these
Answer: Rear points
- Q. When was the North-Eastern frontier Railway (NFR) established?
A)2nd January, 1956
B)15th January, 1958
C)15th January, 1955
D)14th April, 1952
Answer: 15th January, 1958
- Q. During accident or Engine failure in the mid section the report sent to SM must be signed by ________.
A)Both
B)GDR
C)TDR
D)None of these
Answer: GDR
- Q. Impact speed of shunting of one box wagon is ________ km/h.
A)6
B)2
C)5
D)8
Answer: 5
- Q. Notice station notified in?
A)SR
B)SWR
C)GR
D)Working Time Table
Answer: Working Time Table
- Q. Minimum radius for curves in BG is
A)20°
B)16°
C)10°
D)None of these
Answer: 10°
- Q. What is the maximum speed of shunting of a petrol tank wagon?
A)2 kmph
B)15 kmph
C)8 kmph
D)5 kmph
Answer: 8 kmph
- Q. Load infringing standard moving dimensions (ISMD) shall be moved by
A)Work trains
B)Through train
C)Shunting trains
D)None of these
Answer: Through train