Q. Maximum speed of the train while unloading ballast is ________ km/h.

Correct Answer

8

More Questions on Indian Railway

  • Q. A material train may be divided outside station limit during emergency under the supervision of ________.
    A)Driver
    B)Guard
    C)PWI
    D)None of these
    Answer: PWI
  • Q. Signal sighting committee shall submit its report on form ________.
    A)T/101 B
    B)T/103 B
    C)T/102 B
    D)None of these
    Answer: T/102 B
  • Q. Special instructions are issued by whom?
    A)Authorized officer
    B)CCM
    C)CRS
    D)None of these
    Answer: Authorized officer
  • Q. Single line working inforce on double line.
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T/D 602
  • Q. What is the speed of a train after normalized in OHE supply immediate after tripping?
    A)40/15 kmph
    B)60/30 kmph
    C)35/20 kmph
    D)Normal speed
    Answer: 35/20 kmph
  • Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
    A)Call-on Signal
    B)Fixed stop signal
    C)Hand Signal
    D)None of these
    Answer: Fixed stop signal
  • Q. EMU train has ________ type of couplings.
    A)Shakuu
    B)Shakau
    C)Shakua
    D)None of these
    Answer: Shakau
  • Q. ndian Railway’s Jamalpur Workshop is located at?
    A)Bihar
    B)West Bengal
    C)Orissa
    D)Uttar Pradesh
    Answer: Bihar
  • Q. When was the construction work for the first Railway line Started?
    A)1823
    B)1821
    C)1828
    D)1830
    Answer: 1821
  • Q. When was the Jammu City appeared on the map of Indian Railway?
    A)1967
    B)1956
    C)1963
    D)1965
    Answer: 1965
  • Q. What will be the code of engine whistle during signal passing at ON or in defective condition on proper authority information by the Loco Pilot to Guard ?
    A)--0
    B)0-0
    C)-0-
    D)---
    Answer: 0-0
  • Q. Authority to pass IBS has been issued from station in rear.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. Which year is declared as “Year of Rail Users” by the Indian Railways?
    A)1996
    B)2000
    C)1995
    D)1997
    Answer: 1995
  • Q. When was Petrol Rail car started on Kalka – Shimla Rail route?
    A)1918
    B)1911
    C)1913
    D)1917
    Answer: 1911
  • Q. In Automatic Block system , in BG when there is obstruction in the adjacent line, driver to protect the adjacent line first by placing one detonator at not less than ________ , metres.
    A)1200
    B)600
    C)800
    D)None of these
    Answer: 600
  • Q. Gorakhpur which has the longest railway platform in the world is located in which of the following states?
    A)Uttar Pradesh
    B)Odisha
    C)West Bengal
    D)Chhattisgarh
    Answer: Uttar Pradesh
  • Q. Hand shunting of vehicles is prohibited in gradient
    A)1 - 400 or steeper
    B)1 - 260
    C)1 - 400
    D)None of these
    Answer: 1 - 400 or steeper
  • Q. Hand shunting speed is ________
    A)8 kmph
    B)5 kmph
    C)10 kmph
    D)None of these
    Answer: 5 kmph
  • Q. When a running line is occupied ________ entry must be made in TSR.
    A)Yellow Ink
    B)Red Ink
    C)Green Ink
    D)None of these
    Answer: Red Ink
  • Q. Consider the following: 1)Real Estate Investment Trust 2)Railway operation 3)Atomic Energy As of now, there is no FDI in India, in which of above sector(s)?
    A)1, 2 & 3
    B)1 Only
    C)1 & 2 Only
    D)None
    Answer: 1, 2 & 3

Leave a Comment