Q. Maximum No. of ________ track machines can be sent for working in a block section.

Correct Answer

25

More Questions on Indian Railway

  • Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
    A)Sound energy
    B)Potential energy
    C)Electricity
    D)Magnetic energy
    Answer: Electricity
  • Q. Where is the Railway Staff College located?
    A)Vadodara
    B)Pune
    C)Delhi
    D)Allahabad
    Answer: Vadodara
  • Q. If the G marker Gate signal is at ON, Loco pilot may pass it after stopping for 01 minute by day and ________ minutes by night.
    A)8
    B)5
    C)2
    D)4
    Answer: 2
  • Q. Which year is declared as “Year of Rail Users” by the Indian Railways?
    A)1996
    B)2000
    C)1995
    D)1997
    Answer: 1995
  • Q. A vehicle which can be bodily lifted off the line by ________ is a trolley
    A)3 man
    B)02 man
    C)04 man
    D)None of these
    Answer: 04 man
  • Q. Which hooters shall be blown in case of accident on a goods train at outside from ART HQ station?
    A)Two
    B)Four
    C)Three
    D)Any one
    Answer: Three
  • Q. In the work of short duration the first flag man to the approaching train must started at not less than ________ Metres from the last detonator.
    A)145
    B)45
    C)90
    D)150
    Answer: 45
  • Q. It is a Python Rake.
    A)15 kmph
    B)60 kmph
    C)25 kmph
    D)Normal speed
    Answer: 60 kmph
  • Q. Calling on signal is a ________ signal.
    A)Subsidiary
    B)Permissive
    C)Home
    D)None of these
    Answer: Subsidiary
  • Q. Intermediate Block home will be provided only on ________ Line.
    A)Triple
    B)Single
    C)Double
    D)None of these
    Answer: Single
  • Q. The form number of authority to proceed without line clear is ________.
    A)T/B1408
    B)T/1408
    C)T/A1408
    D)None of these
    Answer: T/1408
  • Q. Maximum impact speed when shunting a single roller bearing fitted stock must be?
    A)5 kmph
    B)3 kmph
    C)4 kmph
    D)6 kmph
    Answer: 5 kmph
  • Q. Corridor block is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. In which Governor – General’s reign railway lines in India were established?
    A)Lord Kenning
    B)Lord William Bentick
    C)Lord Cornwallis
    D)Lord Dalhousie
    Answer: Lord Dalhousie
  • Q. At what time the first train in India (and in Asia) flagged off?
    A)Saturday, 03:35 PM
    B)Saturday, 8:50 AM
    C)Sunday, 10:00 AM
    D)Sunday, 02:30 PM
    Answer: Saturday, 03:35 PM
  • Q. Distance between outer and home signals on a single line is ________ meters when there is no advanced starter or SLB in the opposite direction.
    A)400
    B)900
    C)800
    D)700
    Answer: 400
  • Q. The main objective of British developing Indian Railway system was to facilitate the traffic between?
    A)Source of raw material and production centers
    B)Source of raw material and export centers
    C)Source of raw material and ports
    D)Source of raw material and markets
    Answer: Source of raw material and production centers
  • Q. Mission PACE deals with
    A)Fast Ticketing System
    B)Protection of nature
    C)Help Customers
    D)Quality of Goods and Services
    Answer: Quality of Goods and Services
  • Q. If leakage in LPG Tank, how long area is prohibited to carry to burn the burning fire ?
    A)100 meters
    B)45 meters
    C)50 meters
    D)1000 meters
    Answer: 45 meters
  • Q. Height gauge is for the safety of ________.
    A)Motor Trolley
    B)Trolley
    C)Ohe
    D)None of these
    Answer: Ohe