More Questions on Indian Railway
- Q. Signals are normally located to the ________ side of the line.
A)Both
B)Right
C)Left
D)None of these
Answer: Left
- Q. Stop signal is to be passed in On position.
A)T-806
B)T-509
C)T-369(3b)
D)Simple memo
Answer: T-369(3b)
- Q. Indian Railways is constructing the country’s longest railway tunnel and tallest bridge in which of the following states?
A)Assam and Maharashtra
B)Manipur and Jammu & Kashmir
C)Jammu & Kashmir & Assam
D)Maharashtra and Jammu & Kashmir
Answer: Manipur and Jammu & Kashmir
- Q. After how much time Any goods train shall be treated as overdue train?
A)After 20 minutes
B)After 10 minutes
C)After 15 minutes
D)After 25 minutes
Answer: After 20 minutes
- Q. At the starting station, CC rake goods train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. BP in the Guard cab of EMU shall be ________ kg/cm2 and Motor mans cab shall be 4.6 kg/cm2.
A)4
B)4.2
C)4.01
D)4.6
Answer: 4.6
- Q. Number of the Reminder caution order is ________.
A)T/C 410
B)T/A 409
C)T/B 409
D)None of these
Answer: T/B 409
- Q. If leakage in LPG Tank, how long area is prohibited to carry to burn the burning fire ?
A)100 meters
B)45 meters
C)50 meters
D)1000 meters
Answer: 45 meters
- Q. Number of the caution order is ________
A)T/410
B)T/409
C)T/408
D)None of these
Answer: T/409
- Q. Where is the wheel and axle plant of Indian Railways situated ?
A)Mysore
B)Chennai
C)Bangalore
D)Chitradurga
Answer: Bangalore
- Q. When water touches danger level mark, C.O. to be issued for speed – during day
A)20 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. D class station board is placed ________ meters from the end of the platform.
A)600
B)400
C)500
D)800
Answer: 500
- Q. Block overlap in two aspect signalling system is ________ meters.
A)400
B)500
C)600
D)600
Answer: 400
- Q. DRM permission is necessary when hand shunting outside station section takes place in gradient
A)ST 1-260
B)ST 1-600
C)1-400
D)None of these
Answer: ST 1-600
- Q. The headquarters of the South Central Railway zone is located in?
A)Hyderabad
B)Kolkata
C)Secunderabad
D)Gorakhpur
Answer: Secunderabad
- Q. Where is the wheel and axle plant of Indian Railways situated?
A)Bangalore
B)Chittranjan
C)Kapurthala
D)Perambur
Answer: Bangalore
- Q. Modified lower quadrant signaling may be introduced only with section of
A)GM
B)Railway Board
C)CRS
D)None of these
Answer: CRS
- Q. Gorakhpur which has the longest railway platform in the world is located in which of the following states?
A)Uttar Pradesh
B)Odisha
C)West Bengal
D)Chhattisgarh
Answer: Uttar Pradesh
- Q. The headquarters of South Railways is situated at
A)Delhi
B)Kolkata
C)Chennai
D)Mumbai
Answer: Chennai
- Q. When was the North-Eastern frontier Railway (NFR) established?
A)2nd January, 1956
B)15th January, 1958
C)15th January, 1955
D)14th April, 1952
Answer: 15th January, 1958