Q. LV board will be of ________ colour and with LV.

Correct Answer

Red

More Questions on Indian Railway

  • Q. Indian Railway will be provided a device to their Gang Men which would be wireless enabled and will intimate them about approaching trains. The Device will be called:
    A)Shaktimaan
    B)Surakhsha
    C)Rail Rakshak
    D)Rakshak
    Answer: Rakshak
  • Q. On which place the competent Railway servant shall be appointed to show proceed hand signal while receive a train on obstructed line on calling-on signal?
    A)45 meters beyond the obstruction
    B)At 1st facing point of station
    C)Facing point of concern line
    D)No need
    Answer: 45 meters beyond the obstruction
  • Q. What will be maximum speed during shunting of goods train?
    A)25 kmph
    B)8 kmph
    C)15 kmph
    D)30 kmph
    Answer: 15 kmph
  • Q. In the event of an accident falling in more than one class it should be treated as an accident in the ________ class.
    A)Both
    B)Lowest
    C)Highest
    D)None of these
    Answer: Highest
  • Q. To admit the train on loop line, generally the far end points are to be ser for ________.
    A)Both
    B)Loop line
    C)Main line
    D)None of these
    Answer: Main line
  • Q. What is maximum width of coaching stock in BG?
    A)3250 mm
    B)3050 mm
    C)3200 mm
    D)3300 mm
    Answer: 3250 mm
  • Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.
    A)Both
    B)Red Light
    C)Green Light
    D)None of these
    Answer: Red Light
  • Q. During Thick or Foggy weather, 2 Detonators must be placed in rear of Engineering indicator at
    A)400 meters
    B)270 meters
    C)90 meters
    D)None of these
    Answer: 90 meters
  • Q. SLB determines the limits of Station section and ________
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Block Section
  • Q. The train has parted
    A)_____00
    B)------0------0
    C)0___0
    D)00___
    Answer: ------0------0
  • Q. At what time the first train in Indian (and in Asia) flagged off?
    A)Saturday, 03:35 PM
    B)Saturday, 8:50 AM
    C)Sunday, 10:00 AM
    D)Sunday, 02:30 PM
    Answer: Saturday, 03:35 PM
  • Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
    A)27 meters
    B)30 meters
    C)3 meters
    D)100 meters
    Answer: 30 meters
  • Q. On which speed BG engine shall be run while speedometer is defective during run?
    A)25 kmph
    B)50 kmph
    C)40 kmph
    D)Maximum 10% less of MPS
    Answer: Maximum 10% less of MPS
  • Q. Number of the caution order is ________
    A)T/410
    B)T/409
    C)T/408
    D)None of these
    Answer: T/409
  • Q. Only ________ persons other than the motor man/guard are authorized to travel in the cab in EMU
    A)6
    B)2
    C)4
    D)8
    Answer: 2
  • Q. Motorman of EMU shall give ________ bell code while passing A marker lit gate signal in ON position.
    A)0-00
    B)00-00
    C)000-000
    D)None of these
    Answer: 00-00
  • Q. When the derailing switch is closed, trap indicator shows ________ Light by night and no target by day.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: Green
  • Q. When was the new Harbour rail line inaugurated?
    A)1931
    B)1925
    C)1928
    D)1933
    Answer: 1925
  • Q. EMU trains of harbour line has ________ number of wooden wedges.
    A)6
    B)2
    C)4
    D)8
    Answer: 4
  • Q. DRM permission is necessary when hand shunting outside station section takes place in gradient
    A)ST 1-260
    B)ST 1-600
    C)1-400
    D)None of these
    Answer: ST 1-600