More Questions on Indian Railway
- Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.
A)25
B)30
C)20
D)50
Answer: 30
- Q. Target time for dispatch of ARME from single exit siding at night is ________ minutes.
A)8
B)10
C)5
D)25
Answer: 25
- Q. Hand shunting of wagons is totally prohibited in gradients
A)1 in 260
B)1 in 400 OR Steeper
C)ST 1- IN 400
D)None of these
Answer: 1 in 400 OR Steeper
- Q. The speed of engine movement from traffic yard to loco and loco to traffic yard is
A)15 kmph
B)8 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. In Automatic block system, when a train is working on T/B912, the speed over, points at station is
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 15 kmph
- Q. To apply for Line block, the notice shall be given to DRM not less than
A)12 hours
B)48 hours
C)24 hours
D)None of these
Answer: 24 hours
- Q. Slip siding protects
A)Station section
B)Station limit
C)Block section
D)None of these
Answer: Block section
- Q. After getting T/369(I) speed over the points while passing the signal is ________ km/h.
A)25
B)75
C)15
D)30
Answer: 15
- Q. The maximum distance covered by a patrol man should not normally exceed
A)15 KM
B)10 KM a day
C)12 KM
D)None of these
Answer: 10 KM a day
- Q. The form number of authority to proceed without line clear is ________.
A)T/B1408
B)T/1408
C)T/A1408
D)None of these
Answer: T/1408
- Q. Adequate distance kept beyond the starter signal to take off the home signal is called as ________.
A)Block instrument
B)Signal over lap
C)Over lap
D)None of these
Answer: Signal over lap
- Q. Maximum impact speed when shunting a group of roller bearing fitted stock coupled together must be?
A)3 kmph
B)2 kmph
C)2.5 kmph
D)3.5 kmph
Answer: 2.5 kmph
- Q. Cotton in closed wagon shall be attached ________ position from engine on a goods train.
A)Third
B)First
C)Second
D)None of these
Answer: Second
- Q. Besides Mahrashtra, Karnataka and Goa, which of the following is the fourth State for Konkan Railway Project?
A)Gujarat
B)Kerala
C)Tamil Nadu
D)Andhra Pradesh
Answer: Kerala
- Q. Joint sighting committee shall inspect the visibility of signals once in
A)6 months
B)A month
C)3 months
D)None of these
Answer: 3 months
- Q. Authority to pass IBS has been issued from station in rear.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. ________ is measured with the help of anemometer.
A)Both
B)Wind
C)Velocity
D)None of these
Answer: Both
- Q. Length of a BG ICF Coach is
A)21.337 meters
B)22.089 meters
C)21.494 meters
D)None of these
Answer: 21.337 meters
- Q. Accident drill is to be conducted once in ________ if no real accident occurs during this period.
A)01 month
B)04 month
C)02 month
D)03 Months
Answer: 02 month
- Q. Section controller shall transmit the correct time at ________ hours daily to all the stations.
A)16
B)20
C)12
D)10
Answer: 16
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State