Q. LV board will be of ________ colour and with LV.
A
Yellow
B
Red
C
Green
D
None of these
Correct Answer
Red
More Questions on Indian Railway
Q. TSL is started between those two stations at which cross over facility are available and
A)D Class/IBC B)A Class/IBS C)C Class/IBS D)None of these
Answer: C Class/IBS
Q. By whom General Rule is prepared?
A)PCOM B)Railway Board C)Zonal Railway D)GM
Answer: Railway Board
Q. The number of line clear ticket in up direction is ________.
A)T/A 1425 B)T/C 1425 C)T/D 1426 D)T/B 1425
Answer: T/C 1425
Q. Running staff should not normally be away from head quarters for more than hours at a stretch.
A)72 B)24 C)48 D)None of these
Answer: 72
Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
A)3 B)1 C)2 D)None of these
Answer: 3
Q. Speed of a passenger train passing through loop line on a station equipped with STD III interlocking?
A)75 kmph B)140 kmph C)160 kmph D)15 kmph
Answer: 15 kmph
Q. Station manager of a big station shall inspect the cabins at least once in ________.
A)Thrice in a week. B)Once in a week C)Twice in a week D)None of these
Answer: Once in a week
Q. In automatic areas when all signals have failed and communication is available, the driver is issued ________ as authority to proceed.
A)T/C-912 B)T/B-912 C)T/D-912 D)None of these
Answer: T/D-912
Q. Which authority shall be received from station in rear while colour light distant signal is blank-off?
A)T/A409 B)T/369(1) C)T/409 D)No Need of any Authority
Answer: T/369(1)
Q. Is general manager responsible for?
A)Both railway Board and Railway Ministry B)Railway Board C)Railway Ministry D)None of these
Answer: Railway Board
Q. During hand shunting only ________ Bogies can be hand shunted.
A)3 B)1 C)2 D)None of these
Answer: 1
Q. While cancelling ART/MRV, siren shall be sounded for ________ seconds.
A)85 B)60 C)75 D)90
Answer: 90
Q. SCOR maintains ________ register when serious accident occurs.
A)Chronological B)Logical C)Un-logical D)None of these
Answer: Chronological
Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
A)20 B)10 C)15 D)None of these
Answer: 15
Q. The turning out time off BD SPL. During day is ________ minutes
A)50 B)30 C)20 D)None of these
Answer: 30
Q. Maximum number of explosive unit wagons in a mixed train is
A)3 B)5 C)7 D)None of these
Answer: 3
Q. Consider the following railway zones with their headquarters: West Central Railway→ Jabalpur East Coast Railway → Bhubaneswar Western Railway→ Mumbai Which of the above is / are correct?
A)1, 2 & 3 B)1 & 2 Only C)2 & 3 Only D)None
Answer: 1, 2 & 3
Q. Loco and traffic running staff are entitled for ________ hours rest at head quarters after running duty of 08 hours or more
A)12 hours B)04 hours C)08 hours D)16 hours
Answer: 16 hours
Q. Trap indicator is provided to indicate ________.
A)Provision Switch B)Indication Switch C)Derailing switch D)None of these
Answer: Derailing switch
Q. Guard shall use ________ bell code to warn the motorman, if motorman violated the speed.