More Questions on Indian Railway
- Q. Which research arm of Indian Railways has launched “New Online Vendor Registration System”?
A)National Academy of Indian Railways
B)Indian Railway Institute of Signal Engineering and Telecommunication
C)Research Designs and Standards Organisation
D)Indian Railway Service of Electrical Engineers
Answer: Research Designs and Standards Organisation
- Q. Guard of suburban train shall sign on ________ minutes before the actual departure of the train.
A)40
B)45
C)30
D)15
Answer: 15
- Q. Signal sighting committee consists of TI, SI/PWI and ________.
A)T/C 912
B)T/B 912
C)T/D 912
D)T/A 912
Answer: T/D 912
- Q. Number of the Nil caution order is ________.
A)T/C 410
B)T/A 409
C)T/B 408
D)None of these
Answer: T/A 409
- Q. When VP vehicles are attached in a goods train the maximum number of VPvehicle in one group is
A)8
B)10
C)6
D)None of these
Answer: 6
- Q. Speed of the following tower wagon is ________ km/h.
A)9
B)10
C)8
D)4
Answer: 8
- Q. While stabling box load, hand brakes of ________ wagons at both ends shall be pinned down.
A)7 - 7
B)8 - 8
C)6 - 6
D)8 - 8
Answer: 6 - 6
- Q. Flasher lights will be provided in all ________ engines working on DL and Automatic areas.
A)Power
B)Electrical & Diesel
C)Diesel
D)None of these
Answer: Electrical & Diesel
- Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
A)Call-on Signal
B)Fixed stop signal
C)Hand Signal
D)None of these
Answer: Fixed stop signal
- Q. Speed of Train over points shall be ________ Km/h when the points are clamped and padlocked after disconnection of points.
A)30
B)20
C)25
D)15
Answer: 15
- Q. The turning out time of an MRV Spl. When in is kept in one exit siding is ________ minutes.
A)20
B)25
C)15
D)None of these
Answer: 25
- Q. Block instrument and Advanced starter being failed after line clear?
A)T-369(3B) with P. NO. of line clear
B)T/C 1425
C)T/D 602 + T-511
D)T/D 1425
Answer: T-369(3B) with P. NO. of line clear
- Q. Reference of ________ is written by the side of the Rule if the Rule is corrected.
A)No. and Item No. Correction Slip
B)Number Slip
C)Item Number
D)None of these
Answer: No. and Item No. Correction Slip
- Q. After how many time train shall be protected by Guard in rear if 1st stop signal found in On position?
A)15 minutes
B)10 minutes
C)5 minutes
D)No need
Answer: 15 minutes
- Q. The additional Hours in the case of staff posted at way side stations who are provided with quarters within 0.5kkm will be ________ beyond.
A)24 Hours
B)12 Hours
C)08 Hours
D)16Hours
Answer: 24 Hours
- Q. ISMD must be attached always
A)In the middle
B)Next to Engine
C)In rear
D)None of these
Answer: Next to Engine
- Q. If the Loco Pilot sounds long short long short whistle and passes the home signal it means ________.
A)Received train
B)Through
C)Train parted
D)None of these
Answer: Train parted
- Q. A station where the rail lines end, is called
A)Block station
B)Junction station
C)Way - side station
D)Terminal station
Answer: Terminal station
- Q. At what time the first train in India (and in Asia) flagged off?
A)Saturday, 03:35 PM
B)Saturday, 8:50 AM
C)Sunday, 10:00 AM
D)Sunday, 02:30 PM
Answer: Saturday, 03:35 PM
- Q. Adequate distance kept beyond the starter signal to take off the home signal is called as ________.
A)Block instrument
B)Signal over lap
C)Over lap
D)None of these
Answer: Signal over lap
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State