Q. LV board will be of ________ colour and with LV.

Correct Answer

Red

More Questions on Indian Railway

  • Q. If the passenger train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
    A)4
    B)10
    C)9
    D)3
    Answer: 10
  • Q. After how much time Any goods train shall be treated as overdue train?
    A)After 20 minutes
    B)After 10 minutes
    C)After 15 minutes
    D)After 25 minutes
    Answer: After 20 minutes
  • Q. Second train during all communication failure shall be dispatched after an interval of
    A)35
    B)20
    C)25
    D)30
    Answer: 30
  • Q. In how many zones Indian Railway has been divided?
    A)17
    B)14
    C)16
    D)20
    Answer: 17
  • Q. During poor visibility the speed of lorry is
    A)5 kmph
    B)8 kmph
    C)15 kmph
    D)None of these
    Answer: 5 kmph
  • Q. If the Loco Pilot stops after passing the home siGnal and sounds long short long short whistle, it means ________.
    A)Received train
    B)Train Divided
    C)Thorugh train
    D)None of these
    Answer: Train Divided
  • Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
    A)Defective
    B)Restricted
    C)Most restricted
    D)Noe of these
    Answer: Most restricted
  • Q. The Ministry of Railways has recently launched which app for freight managers?
    A)SNOORTI app
    B)SFOORTI app
    C)SKOORTI app
    D)SMOORTI app
    Answer: SFOORTI app
  • Q. Calling on signal is placed below any stop signal except ________.
    A)Stop Signal
    B)First stop signal
    C)Last Stop signal
    D)None of these
    Answer: Last Stop signal
  • Q. Which train in India has the longest route length?
    A)Kanyakumari - Dibrugarh Vivek Express
    B)Howrah - Jammu Tawi Himgiri Express
    C)Kanyakumari - Jammu Tawi Himsagar Express
    D)Guwahati - Tiruvananthapuram Express
    Answer: Kanyakumari - Dibrugarh Vivek Express
  • Q. To receive the train which has entered the block section without authority to proceed, SM to issue ________ and pilot the train or by signal post telephone.
    A)T/369(B)
    B)T/369(3b)
    C)T/369(2b)
    D)None of these
    Answer: T/369(2b)
  • Q. Maximum No. of ________ track machines can be sent for working in a block section.
    A)25
    B)20
    C)15
    D)30
    Answer: 25
  • Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
    A)Both
    B)Path
    C)Platform
    D)None of these
    Answer: Platform
  • Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?
    A)North Korea
    B)Japan
    C)South Korea
    D)China
    Answer: Japan
  • Q. In which of the following cities, the first subway train was started?
    A)Kolkata
    B)Mumbai
    C)Delhi
    D)Chennai
    Answer: Kolkata
  • Q. During prolonged failure of signals in automatic section, ________ authority is issued.
    A)T/C 912
    B)T/B 912
    C)T/D 912
    D)T/A 912
    Answer: T/D 912
  • Q. Indian Railways is constructing the country’s longest railway tunnel and tallest bridge in which of the following states?
    A)Assam and Maharashtra
    B)Manipur and Jammu & Kashmir
    C)Jammu & Kashmir & Assam
    D)Maharashtra and Jammu & Kashmir
    Answer: Manipur and Jammu & Kashmir
  • Q. In case of home signal defective the speed of the train while passing over the points shall not be more than ________ km/h.
    A)15 km
    B)18 km
    C)10 km
    D)20 km
    Answer: 15 km
  • Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
    A)Both
    B)Temporary Working Order.
    C)Permanent working order.
    D)None of these
    Answer: Temporary Working Order.
  • Q. The wagon containing ISMD load shall be attached.
    A)In Middle
    B)In rear
    C)Next to Engine
    D)None of these
    Answer: Next to Engine