- Q. The senior most ________ officer is personally responsible for ensuring and efficient handing of cranes and removal of wreckage after accident.
A)C & W
B)Engineering
C)Mechanical
D)None of these
Answer: Mechanical
- Q. If the driver does not received all right signal from the guard, he must call for is by giving.
A)On long
B)Two sharp whistles
C)One long one short.
D)None of these
Answer: Two sharp whistles
- Q. Sounding of ________ hooters means accident of goods train at home station.
A)6
B)2
C)4
D)8
Answer: 2
- Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
A)800 Meter
B)1200 Meter
C)1000 Meter
D)500 Meter
Answer: 800 Meter
- Q. During thick or foggy weather or night if ________ is not provided, trains are not permitted to draw ahead upto advanced starter.
A)Both
B)Track Circuit
C)Track
D)None of these
Answer: Track Circuit
- Q. Indian Railway will be provided a device to their Gang Men which would be wireless enabled and will intimate them about approaching trains. The Device will be called:
A)Shaktimaan
B)Surakhsha
C)Rail Rakshak
D)Rakshak
Answer: Rakshak
- Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
A)Only 1 & 3
B)Only 1 & 2
C)Only 2 & 3
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
A)ACC4
B)ACC2
C)ACC3
D)None of these
Answer: ACC4
- Q. At the enroute, CC rake goods train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 90
- Q. Signal overlap at a terminal station with multi aspect colour light signalling is ________.
A)Green
B)White
C)Red
D)NIL
Answer: NIL
- Q. On which speed BG train should be run while speedometer failed in block section?
A)No need to reduced speed
B)10% less of sectional speed
C)10% less of booked speed
D)40 kmph
Answer: 10% less of sectional speed
- Q. ________ brake is not provided in the coach of passenger train.
A)Minor
B)Hand
C)Non-hand
D)None of these
Answer: Hand
- Q. Speed of second train during temporary single line working is ________.
A)Both
B)Normal
C)Abnormal
D)None of these
Answer: Normal
- Q. How much distance was travelled by first train of India?
A)34 km
B)33 km
C)36 km
D)46 km
Answer: 34 km
- Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. BSLB determines the limits of block section and ________ .
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Station Section
- Q. The headquarter of Central Railway situated at?
A)Gwalior
B)Mumbai (CST)
C)Mumbai (Church Gate)
D)Gorakhpur
Answer: Mumbai (CST)
- Q. Traffic gates are those located between ________.
A)First signal
B)Outermost stop signal
C)Stop signal
D)None of these
Answer: Outermost stop signal
- Q. How an automatic stop signal can be recognized?
A)Eliminated A marker
B)A marker on white disk
C)No mark
D)Four aspects
Answer: A marker on white disk
- Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these