Q. Loco and traffic running staff are eligible for ________ hours rest at Head quarters after running duty of less than 08 hours.

Correct Answer

12 Hours

More Questions on Indian Railway

  • Q. The extended life of Detonator is ________ Years.
    A)4
    B)5
    C)6
    D)10
    Answer: 10
  • Q. Only ________ persons other than the motor man/guard are authorized to travel in the cab in EMU
    A)6
    B)2
    C)4
    D)8
    Answer: 2
  • Q. Indian Railways is constructing the country’s longest railway tunnel and tallest bridge in which of the following states?
    A)Assam and Maharashtra
    B)Manipur and Jammu & Kashmir
    C)Jammu & Kashmir & Assam
    D)Maharashtra and Jammu & Kashmir
    Answer: Manipur and Jammu & Kashmir
  • Q. Running staff should not normally be away from head quarters for more than hours at a stretch.
    A)72
    B)24
    C)48
    D)None of these
    Answer: 72
  • Q. In Material train, vehicles shall not be detached on gradient.
    A)1-400
    B)ST 1-260
    C)1-100 or steeper
    D)None of these
    Answer: 1-100 or steeper
  • Q. On which place the competent Railway servant shall be appointed to show proceed hand signal while receive a train on obstructed line on calling-on signal?
    A)45 meters beyond the obstruction
    B)At 1st facing point of station
    C)Facing point of concern line
    D)No need
    Answer: 45 meters beyond the obstruction
  • Q. What is the speed of second train on double line section running on T/A602?
    A)10 kmph
    B)20 kmph
    C)15 kmph
    D)8 kmph
    Answer: 8 kmph
  • Q. Consider the following statements about the proposed Rail Development Authority: 1)It will act within the parameters of the Railway Act, 1989 2)The authority will consist of four members 3)It will regulate the sector opened to the private sector for investment Which of the above statements is/are correct?
    A)2 & 3 Only
    B)1 & 2 Only
    C)3 Only
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. The main objective of British developing Indian Railway system was to facilitate the traffic between?
    A)Source of raw material and production centers
    B)Source of raw material and export centers
    C)Source of raw material and ports
    D)Source of raw material and markets
    Answer: Source of raw material and production centers
  • Q. DRM nominates ________ for each section to issue caution orders to train crew.
    A)Nil notice
    B)Caution notice station
    C)Notice
    D)None of these
    Answer: Caution notice station
  • Q. How many stations to be redeveloped through PPP?
    A)350
    B)100
    C)200
    D)600
    Answer: 600
  • Q. Maximum speed of B’ class ODC is ________ km/h.
    A)60
    B)50
    C)40
    D)75
    Answer: 40
  • Q. Amount of vaccum level required in high speed train loco is
    A)56 cm
    B)50 cm
    C)55 cm
    D)None of these
    Answer: 56 cm
  • Q. Your train is first during TSL on double line.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 25 kmph
  • Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: Green
  • Q. The Speaker of Lok Sabha also works as the ex – officio Chairperson of which of the following committees? 1)Railway Convention Committee 2)Business Advisory Committee 3)Public Account Committee Select the correct option from the codes given below:
    A)1 & 3 Only
    B)1 & 2 Only
    C)2 Only
    D)1, 2 & 3
    Answer: 2 Only
  • Q. Special instructions are issued by whom?
    A)Authorized officer
    B)CCM
    C)CRS
    D)None of these
    Answer: Authorized officer
  • Q. Palace on Wheels train was inaugurated in which year?
    A)1982
    B)1988
    C)1972
    D)1965
    Answer: 1982
  • Q. To attach the 12 coach EMU rake, ________ units are to be attached.
    A)8
    B)5
    C)6
    D)4
    Answer: 4
  • Q. Colour of the semaphore calling on signal is ________.
    A)Green
    B)Red
    C)White
    D)None of these
    Answer: White