More Questions on Indian Railway
- Q. Second train during all communication failure shall be dispatched after an interval of
A)35
B)20
C)25
D)30
Answer: 30
- Q. On which time the departure signal shall be taken off for run through train passing via loop line?
A)After entering in loop line
B)Before entering at station
C)After stopped at station
D)Before 10 minutes from expected arrival
Answer: Before 10 minutes from expected arrival
- Q. In how many zones Indian Railway has been divided?
A)17
B)14
C)16
D)20
Answer: 17
- Q. Maximum speed of trains during day in case of OHE failure is ________
A)65 km
B)108 km
C)70 km
D)60 km
Answer: 60 km
- Q. Gateman competency certificate of interlocked traffic gate is signed by TI and SE (Sig) and counter signed by ________.
A)DOM
B)AOM(G)
C)AOM(Chg)
D)None of these
Answer: AOM(G)
- Q. While cancelling ART/MRV, siren shall be sounded for ________ seconds.
A)85
B)60
C)75
D)90
Answer: 90
- Q. Slip siding protects
A)Station section
B)Station limit
C)Block section
D)None of these
Answer: Block section
- Q. A station where the rail lines end, is called
A)Block station
B)Junction station
C)Way - side station
D)Terminal station
Answer: Terminal station
- Q. Signal failure advised to the driver through the station in rear will be inform
A)T/369(3b)
B)T/369
C)T/370
D)None of these
Answer: T/369
- Q. If a military personnel is injured or killed in railway premises the DRM shall advise ________ New Delhi.
A)Army Head Quarter
B)Railway Board
C)Zonal HQ
D)None of these
Answer: Army Head Quarter
- Q. Minimum depth of space for wheel flange from rail level in BG is
A)3"
B)2"
C)1 (1/2)"
D)None of these
Answer: 1 (1/2)"
- Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
A)27 meters
B)30 meters
C)3 meters
D)100 meters
Answer: 30 meters
- Q. Each motor coach shall consist of ________ Traction motors.
A)4
B)2
C)3
D)5
Answer: 4
- Q. Number of the Nil caution order is ________.
A)T/C 410
B)T/A 409
C)T/B 408
D)None of these
Answer: T/A 409
- Q. What is maximum width for 8-Wheeled Goods stock in BG?
A)3250 mm
B)3050 mm
C)3200 mm
D)3300 mm
Answer: 3050 mm
- Q. During single line working on double line in automatic area the speed of all train running in wrong direction shall not exceed
A)10 kmph
B)25 kmph
C)15 kmph
D)None of these
Answer: 25 kmph
- Q. Whenever new signal is placed, caution order is issued to Loco Pilot for ________ days.
A)35
B)15
C)20
D)10
Answer: 10
- Q. 400 meters beyond the home signal of a C’ class station is called as ________.
A)Last stop signal
B)Block section
C)Overlapping block section
D)None of these
Answer: Overlapping block section
- Q. On which speed BG engine shall be run while speedometer is defective during run?
A)25 kmph
B)50 kmph
C)40 kmph
D)Maximum 10% less of MPS
Answer: Maximum 10% less of MPS
- Q. India’s first solar – powered 1600 HP DEMU train has launched from which railway station?
A)Habibganj railway station
B)Farukhnagar railway station
C)Safdarjung railway station
D)Mumbai Central railway station
Answer: Safdarjung railway station