Q. In which year Research, Design and Standard organization was established?

Correct Answer

1957

More Questions on Indian Railway

  • Q. When the derailing switch is open, trap indicator shows red target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: Red
  • Q. Form number of disconnection and reconnection is ________.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. Signals are normally located to the ________ side of the line.
    A)Both
    B)Right
    C)Left
    D)None of these
    Answer: Left
  • Q. When the train is stopped at FSS for more than ________ minutes, the Driver must send his assistant to station after consulting with guard.
    A)10
    B)5
    C)7
    D)None of these
    Answer: 5
  • Q. Trap indicator is provided to indicate ________.
    A)Provision Switch
    B)Indication Switch
    C)Derailing switch
    D)None of these
    Answer: Derailing switch
  • Q. The maximum speed of a train while passing through station of interlocking std III is?
    A)140 kmph
    B)50 kmph
    C)110 kmph
    D)160 kmph
    Answer: 140 kmph
  • Q. Clocks of control office shall be synchronized with All India Radio at 08:00 hours,
    A)15:30
    B)14:30
    C)12:30
    D)13:30
    Answer: 13:30
  • Q. The minimum BP pressure is requiring on engine before continuity test is?
    A)5.8 kg/cm2 D. 5.00 kg/cm2
    B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    D)5.00 kg/cm2
    Answer: 5.00 kg/cm2
  • Q. Read the Following Railway Headquarters and Identify which is False?
    A)South Railway - Chennai
    B)South - Central Railway - Secunderabad
    C)Central railway - Bhopal
    D)North Railway - New Delhi
    Answer: Central railway - Bhopal
  • Q. When the platform level is ________ MM and more second arriving train shall not be received and berthed on non platform line directly.
    A)650
    B)700
    C)725
    D)760
    Answer: 760
  • Q. While ordering ART/MRV each siren shall be sounded for ________ seconds.
    A)43
    B)41
    C)42
    D)45
    Answer: 45
  • Q. Isolation shall be provided at an interlocked station when the speed is
    A)Above 50 kmph
    B)50 kmph
    C)75 kmph
    D)None of these
    Answer: Above 50 kmph
  • Q. Station working rules of an interlocked station is prepared by Sr. DOM and ________.
    A)Sr. DSTE
    B)DOM
    C)COM
    D)None of these
    Answer: Sr. DSTE
  • Q. The first Shatabdi express was introduced between which of the following locations?
    A)New Delhi and Jhansi
    B)Bombay and Thane
    C)Bombay and Kolkata
    D)New Delhi and Chennai
    Answer: New Delhi and Jhansi
  • Q. In automatic block system SL, the minimum equipment of signal shall be
    A)Home, Starter, Advance Starter
    B)Home, Starter
    C)Distance Home Starter
    D)None of these
    Answer: Home, Starter
  • Q. The number of Train examination report is ________.
    A)T/436
    B)T/431
    C)T/432
    D)T/436
    Answer: T/431
  • Q. Maximum number of explosive unit wagons in a mixed train is
    A)3
    B)5
    C)7
    D)None of these
    Answer: 3
  • Q. Target time for departing ART during day is 30 minutes and during night is ________ minutes.
    A)60
    B)40
    C)50
    D)45
    Answer: 45
  • Q. Maximum No. of ________ track machines can be sent for working in a block section.
    A)25
    B)20
    C)15
    D)30
    Answer: 25
  • Q. The train has parted
    A)_____00
    B)------0------0
    C)0___0
    D)00___
    Answer: ------0------0