Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.

Correct Answer

25

More Questions on Indian Railway

  • Q. In token territory, ________ is authority for shunting up to FSS.
    A)T/806
    B)Shunt Mental Token+T/806
    C)Shunt Mental
    D)None of these
    Answer: Shunt Mental Token+T/806
  • Q. During failure of signals and communications in DL automatic area the authority to proceed is
    A)T/B 912
    B)T/D 912
    C)T/A 912
    D)None of these
    Answer: T/B 912
  • Q. The train has parted
    A)_____00
    B)------0------0
    C)0___0
    D)00___
    Answer: ------0------0
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the brake van.
    A)6.8
    B)7.8
    C)5.8
    D)4.8
    Answer: 4.8
  • Q. Maximum impact speed when shunting a single roller bearing fitted stock must be?
    A)5 kmph
    B)3 kmph
    C)4 kmph
    D)6 kmph
    Answer: 5 kmph
  • Q. Consider the following statements with respect to Railway Freight corridor projects in India: 1)The Eastern freight corridor extends from Dankuni in Bengal to Ludhiana in Punjab and it is funded by World Bank 2)The Western freight corridor extends from Jawaharlal Nehru port in Mumbai to Dadri near Delhi and it is funded by Japan International Cooperation Agency Which of the above is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: Both 1 & 2
  • Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: Green
  • Q. Fly shunting will take place in
    A)Flat Yard
    B)Hump Yard
    C)Gravity Yard
    D)None of these
    Answer: Hump Yard
  • Q. When the section is occupied, the arrow indication in the panel in Twin single line working will be
    A)No light
    B)White
    C)Red
    D)None of these
    Answer: Red
  • Q. Suburban Working time table is signed by ________ , COM and CPTM.
    A)DRM
    B)DOM
    C)AOM
    D)None of these
    Answer: DRM
  • Q. Which authority shall be received from station in rear to pass defective home signal?
    A)T-409
    B)T-369(3b)
    C)T-369(1)
    D)Simple memo
    Answer: T-369(1)
  • Q. Track maintenance machine is permitted to work during
    A)Day clear weather
    B)Day
    C)Day and Night
    D)None of these
    Answer: Day and Night
  • Q. How many copies of caution order shall be prepared for a train provided with banking engine?
    A)5
    B)3
    C)4
    D)None of these
    Answer: 5
  • Q. Whenever new signal is placed, caution order is issued to Loco Pilot for ________ days.
    A)35
    B)15
    C)20
    D)10
    Answer: 10
  • Q. The railway station situated in the extreme south is
    A)Kanyakumari
    B)Chennai
    C)Cochin
    D)Trivandrum
    Answer: Kanyakumari
  • Q. If there is no advanced starter at A’ class station, signal overlap will be ________.
    A)Block sectiond
    B)Next whole block section
    C)Back whole block section
    D)None of these
    Answer: Next whole block section
  • Q. On which place the competent Railway servant shall be appointed to show proceed hand signal while receive a train on obstructed line on calling-on signal?
    A)45 meters beyond the obstruction
    B)At 1st facing point of station
    C)Facing point of concern line
    D)No need
    Answer: 45 meters beyond the obstruction
  • Q. The number of line clear ticket in down direction is ________.
    A)T/A 1425
    B)T/C 1425
    C)T/D 1426
    D)T/D 1425
    Answer: T/D 1425
  • Q. What will be the minimum distance of 2 Towar Wagons in the same block section ?
    A)130 meters
    B)100 meters
    C)120 meters
    D)140 meters
    Answer: 120 meters
  • Q. If the vehicles escaped on right line on a double line ________ bell code is given to the station in advance.
    A)0000-000
    B)000000-0000 0
    C)00000-0
    D)0000-0000
    Answer: 000000-0000 0