More Questions on Indian Railway
- Q. ________ percent sub – quota for women under all reserved categories
A)33
B)30
C)35
D)40
Answer: 33
- Q. The Ministry of Railways has recently launched which app for freight managers?
A)SNOORTI app
B)SFOORTI app
C)SKOORTI app
D)SMOORTI app
Answer: SFOORTI app
- Q. At a C’ class staion in two aspect signalling system, ________ and home signals are provided.
A)Sectional
B)Corner
C)Warner
D)None of these
Answer: Warner
- Q. Overloading Tolerance for a 8 wheeler bogie MG vehicle is
A)1.5 Tonne
B)2 Tonnes
C)1 Tonne
D)None of these
Answer: 1 Tonne
- Q. If the patrol man does not turn up within ________ minutes, caution order must be issued.
A)15
B)10
C)5
D)20
Answer: 20
- Q. Wagon with livestock shall be attached ________ position from engine on a passenger train.
A)Third
B)First
C)Second
D)None of these
Answer: Second
- Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
A)25
B)20
C)15
D)None of these
Answer: 25
- Q. Passenger warning board is placed at a distance of ________ meters from the first stop signal.
A)1500
B)1200
C)1000
D)1800
Answer: 1000
- Q. When was the first underground railway (Metro Railway) started?
A)1984
B)1982
C)1989
D)1992
Answer: 1984
- Q. Which of the following two countries have largest electrified railway network in the world?
A)Russia & China
B)Russia & US
C)US & China
D)India & US
Answer: Russia & China
- Q. Calling on signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Subsidiary
- Q. What is the width of broad gauge railway line in India?
A)4 feet 11 inches
B)5 feet 3 inches
C)5 feet 6 inches
D)5 feet 4 inches
Answer: 5 feet 6 inches
- Q. During single line working of DL the speed of the first train is ________ kmph
A)15
B)25
C)20
D)None of these
Answer: 25
- Q. At station where it is not possible to exchange the signal between Guard and Loco Pilot due to curvature the guard shall ask the LP to start the train on ________.
A)Walkie-Talkie
B)Walkie
C)VHF
D)None of these
Answer: Walkie-Talkie
- Q. Loco Pilot shall sound _________ whistle to acknowledge the Guard hand signal.
A)Three Long
B)One Long
C)Two Long
D)None of these
Answer: One Long
- Q. In which year Indian Railway was nationalized?
A)1952
B)1947
C)1951
D)1955
Answer: 1951
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic
- Q. ________ and ‘C’ class ODC shall not be crossed in the block section on double line.
A)60
B)50
C)40
D)75
Answer: 40
- Q. Hand shunting outside section in gradient ________ is prohibited except with DRM permission.
A)ST 1-800
B)ST 1-600
C)ST 1-700
D)None of these
Answer: ST 1-600
- Q. Permission to run C’ class ODC is given by CRS and the maximum speed of train is
A)4
B)2
C)3
D)6
Answer: 2
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State