More Questions on Indian Railway
- Q. By whom General Rule is prepared?
A)PCOM
B)Railway Board
C)Zonal Railway
D)GM
Answer: Railway Board
- Q. Motor Trolley permit is ________
A)T/1625
B)T/1425
C)T/1525
D)None of these
Answer: T/1525
- Q. There are 8 appendices and ________ parts in SWR.
A)10
B)8
C)4
D)12
Answer: 12
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic
- Q. The headquarters of the South Central Railway zone is located in?
A)Hyderabad
B)Kolkata
C)Secunderabad
D)Gorakhpur
Answer: Secunderabad
- Q. What is the massage of 0000(Four short) whistle sound by loco pilot?
A)Train parting
B)Signal Approaching
C)Train out of control,
D)Unable to proceed, Guard protect the train in rear
Answer: Unable to proceed, Guard protect the train in rear
- Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
A)35
B)20
C)25
D)30
Answer: 30
- Q. The number of line clear ticket in down direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/D 1425
Answer: T/D 1425
- Q. Only ________ persons other than the motor man/guard are authorized to travel in the cab in EMU
A)6
B)2
C)4
D)8
Answer: 2
- Q. Which authority shall be issued to pass a starter signal during advanced starter single is failed and starter is interlocked with Ad. Starter at a station equipped with single line token less block?
A)Memo + Hand Signal
B)T-369(3b)
C)PLCT
D)Starter should be taken off
Answer: T-369(3b)
- Q. When a token is lost, the lost token notice is issued and it is valid for ________ months.
A)3
B)6
C)4
D)2
Answer: 6
- Q. At a C’ class staion in two aspect signalling system, ________ and home signals are provided.
A)Sectional
B)Corner
C)Warner
D)None of these
Answer: Warner
- Q. If the passenger train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
A)4
B)10
C)9
D)3
Answer: 10
- Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
A)25/10 kmph
B)15/8 kmph
C)25/8 kmph
D)25/12 kmph
Answer: 25/8 kmph
- Q. Used for A self propelled vehicle repairs in OHE is
A)Moped Trolley
B)Tower wagon
C)Ladder Trolley
D)None of these
Answer: Tower wagon
- Q. Railway Staff College is situated at
A)Chennai
B)Bangalore
C)Secunderabad
D)Vadodara
Answer: Vadodara
- Q. ________ brake is not provided in the coach of passenger train.
A)Minor
B)Hand
C)Non-hand
D)None of these
Answer: Hand
- Q. Consider the following statements with respect to the Railway Convention Committee: 1)The committee consists of members only from Lok Sabha 2)Railway Minister is the ex – officio chairman of Railway Convention Committee Which of the above statements is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: Neither 1 nor 2
- Q. Motorman shall give ________ beat to release the hand brakes.
A)00-00-00
B)00-0-00
C)0-0-0
D)0-00-00
Answer: 00-0-00
- Q. When was the North – Eastern frontier Railway (NEFR) established?
A)2nd Jan, 1956
B)15th Jan, 1958
C)15th Jan, 1955
D)14th April, 1952
Answer: 15th Jan, 1958