Q. If the IBS signal is ON and Telephone is defective, Loco Pilot shall wait for 5 minutes and proceed at a speed of ________

Correct Answer

15/8

More Questions on Indian Railway

  • Q. Shunting restrictions of station is written in ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: SWR
  • Q. Signal passed at danger is treated as ________ accident.
    A)Indirection
    B)Indicative
    C)Direct
    D)None of these
    Answer: Indicative
  • Q. ________ brake is not provided in the coach of passenger train.
    A)Minor
    B)Hand
    C)Non-hand
    D)None of these
    Answer: Hand
  • Q. First Train started in India?
    A)1853
    B)1851
    C)1852
    D)1854
    Answer: 1853
  • Q. The railway station situated in the extreme south is
    A)Kanyakumari
    B)Chennai
    C)Cochin
    D)Trivandrum
    Answer: Kanyakumari
  • Q. Loco pilot shall not take alcoholic drinks before ________ hours from signing on duty.
    A)8
    B)5
    C)4
    D)10
    Answer: 8
  • Q. Maximum speed of the train while unloading ballast is ________ km/h.
    A)6
    B)8
    C)4
    D)10
    Answer: 8
  • Q. How many copies of caution order shall be prepared for a train provided with banking engine?
    A)5
    B)3
    C)4
    D)None of these
    Answer: 5
  • Q. If the patrol man does not turn up within ________ minutes, he will be treated as delayed.
    A)15
    B)10
    C)20
    D)40
    Answer: 15
  • Q. If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Verbally
    B)Walkie-Talkie
    C)Written Memo
    D)None of these
    Answer: Written Memo
  • Q. When was the North – Eastern frontier Railway (NEFR) established?
    A)2nd Jan, 1956
    B)15th Jan, 1958
    C)15th Jan, 1955
    D)14th April, 1952
    Answer: 15th Jan, 1958
  • Q. Maximum of ________ cranes can be attached in a passenger train.
    A)3
    B)1
    C)2
    D)4
    Answer: 1
  • Q. The Indian Railways has launched which virtual server to optimise server usage and faster connectivity?
    A)RailSilver
    B)RailSagar
    C)RailCloud
    D)RailBharat
    Answer: RailCloud
  • Q. At the starting station, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. Block competency certificate is given in the prescribed form ________.
    A)T/115A
    B)T/115B
    C)T/115C
    D)T/115D
    Answer: T/115B
  • Q. Mountain Railways of India refer to the railway lines built in the mountains of India in the nineteenth and early twentieth century, during the British Raj, even being run today by the Indian Railways. How many railway lines refer to the Mountain Railways of India ?
    A)5
    B)3
    C)4
    D)6
    Answer: 3
  • Q. Which of the following ran the first train from Bori Bunder to Thane in 1853?
    A)Central India Railway
    B)Bombay Baroda Railway
    C)The Scindia Railway
    D)Great Indian Peninsula Railway
    Answer: Great Indian Peninsula Railway
  • Q. What is the massage of 0000(Four short) whistle sound by loco pilot?
    A)Train parting
    B)Signal Approaching
    C)Train out of control,
    D)Unable to proceed, Guard protect the train in rear
    Answer: Unable to proceed, Guard protect the train in rear
  • Q. Termination indication board will be
    A)Rectangular
    B)Square
    C)Round
    D)None of these
    Answer: Round
  • Q. When the train has not cleared the fouling marks. Driver to give ________ whistle
    A)01 long
    B)03 long
    C)02 long
    D)None of these
    Answer: 03 long