Q. If the block instrument becomes defective on a double line, ________ signal is also treated as defective.

Correct Answer

Last stop signal

More Questions on Indian Railway

  • Q. How much distance was travelled by first train of India?
    A)34 km
    B)33 km
    C)36 km
    D)46 km
    Answer: 34 km
  • Q. Speed of the following tower wagon is ________ km/h.
    A)9
    B)10
    C)8
    D)4
    Answer: 8
  • Q. The speed of shunting is ________.
    A)10 kmph
    B)15 kmph
    C)20 kmph
    D)None of these
    Answer: 15 kmph
  • Q. High flood level mark shall be painted in
    A)Blue
    B)Red
    C)White
    D)None of these
    Answer: Red
  • Q. How an automatic stop signal can be recognized?
    A)Eliminated A marker
    B)A marker on white disk
    C)No mark
    D)Four aspects
    Answer: A marker on white disk
  • Q. What will be the speed of a train running through from station without brake van provoded with Tail lamp?
    A)15 kmph
    B)20 kmph
    C)Stop & Start
    D)Normal speed
    Answer: Normal speed
  • Q. When a goods train is working without brake can the speed is
    A)25 kmph by day and 15 kmph by night
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: None of these
  • Q. For which time Guard rough journal must be kept safe?
    A)Upto 3 Years
    B)Upto 1 Year
    C)Upto 2 Years
    D)Upto 6 Months
    Answer: Upto 3 Years
  • Q. Who has been appointed the new Financial Commissioner (FC) of Indian Railways?
    A)Anand Mathur
    B)A K Prasad
    C)S K Bhagat
    D)Akhil Agrawal
    Answer: A K Prasad
  • Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
    A)8 kmph
    B)10 kmph
    C)15 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Point indicator shows ________ light when the points are set for loop line.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. Load table is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. Consider the following statements: 1. Anti – collision device (ACD) Network is patented by Konkan Railway Corporation Ltd. 2. Anti – collision device (ACD) uses Global Positioning System for its work Which among the above statements is / are correct?
    A)Both are true
    B)Only 1 is true
    C)Only 2 is true
    D)Neither is true
    Answer: Both are true
  • Q. Hand shunting of vehicles in gradients ________ is totally prohibited
    A)1 In 100 or steeper
    B)1 in 400 or Steeper
    C)1 in 200 or steeper
    D)None of these
    Answer: 1 in 400 or Steeper
  • Q. What is the target time for ART during night hours?
    A)60 minutes
    B)30 minutes
    C)45 minutes
    D)20 minutes
    Answer: 45 minutes
  • Q. The headquarters of North – Eastern railway is situated at
    A)Gorakhpur
    B)Mumbai (CST)
    C)Guwahati
    D)New Delhi
    Answer: Gorakhpur
  • Q. Signal passed at danger is treated as ________ accident.
    A)Indirection
    B)Indicative
    C)Direct
    D)None of these
    Answer: Indicative
  • Q. How much block overlap is required at the station equipped with single line MACLS?
    A)120 meters
    B)400 meters
    C)180 meters
    D)Zero meters
    Answer: 180 meters
  • Q. Which of the following ran the first train from Bori Bunder to Thane in 1853?
    A)Central India Railway
    B)Bombay Baroda Railway
    C)The Scindia Railway
    D)Great Indian Peninsula Railway
    Answer: Great Indian Peninsula Railway
  • Q. When two trollies are working in section the gap between the two must be
    A)400 Meters
    B)100 meters
    C)200 meters
    D)None of these
    Answer: 100 meters