More Questions on Indian Railway
- Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 5 kg/cm2 of BP pressure in the engine.
A)6
B)10
C)8
D)4
Answer: 6
- Q. Which is the India’s first double Decker train?
A)Guwahati Thiruvananthapuram Express
B)Ahmedabad - Mumbai Central Double Decker Express
C)Samjhauta Express
D)Howrah – Dhanbad Double Decker Express
Answer: Howrah – Dhanbad Double Decker Express
- Q. If the Loco Pilot sounds long short long short whistle and passes the home signal it means ________.
A)Received train
B)Through
C)Train parted
D)None of these
Answer: Train parted
- Q. To pick up the part load from the section, ________ authority is issued if the same loco pilot is proceeding.
A)T/407
B)T/409
C)T/408
D)T/406
Answer: T/409
- Q. When was the nationalization of Indian Railways done?
A)1951
B)1952
C)1950
D)1954
Answer: 1950
- Q. The headquarters of Northern Railway is at
A)Gorakhpur
B)New Delhi
C)Guwahati
D)Mumbai (CST)
Answer: New Delhi
- Q. Which of the following has become the India’s first railway station to have sanitary napkin vending machine?
A)Kolkata railway station
B)Thane railway station
C)Hazrat Nizamuddin railway station
D)Bhopal railway station
Answer: Bhopal railway station
- Q. On which authority advance starter may be passed during shunting operation in its on position?
A)On hand signal
B)T-369(3b)
C)Written memo
D)T-806
Answer: T-806
- Q. When was the North-Eastern frontier Railway (NFR) established?
A)2nd January, 1956
B)15th January, 1958
C)15th January, 1955
D)14th April, 1952
Answer: 15th January, 1958
- Q. Any person aggrieved by a decision if labour commissioner may prefer an appeal to the central government within ________ days from the Regional Labour Commissioner
A)30
B)10
C)20
D)None of these
Answer: 30
- Q. Besides Maharashtra, Karnataka and Goa, which of the following is the fourth State for Konakan Railway Project?
A)Gujarat
B)Kerala
C)Tamil Nadu
D)Andhra Pradesh
Answer: Kerala
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic
- Q. On DL in ________ minutes gap trains must be started during total interruption of communication.
A)30
B)20
C)10
D)None of these
Answer: 30
- Q. The speed of shunting is ________.
A)10 kmph
B)15 kmph
C)20 kmph
D)None of these
Answer: 15 kmph
- Q. Form number of disconnection and reconnection is ________.
A)S&T (T/350)
B)S&T (T/351)
C)S&T (T/352)
D)S&T (T/315)
Answer: S&T (T/351)
- Q. Indian Railways which is the largest of the Public Sector Enterprises, is divided in how many regions?
A)8
B)7
C)9
D)10
Answer: 9
- Q. Calling on signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Subsidiary
- Q. Speed of a passenger train passing through loop line on a station equipped with STD III interlocking?
A)75 kmph
B)140 kmph
C)160 kmph
D)15 kmph
Answer: 15 kmph
- Q. What is maximum width of coaching stock in BG?
A)3250 mm
B)3050 mm
C)3200 mm
D)3300 mm
Answer: 3250 mm
- Q. Max. Speed of passenger train attached with four wheeler wagon shall be ________ km/h.
A)45
B)70
C)65
D)75
Answer: 75