Q. How many systems of working in Indian Railways for train operation?

Correct Answer

6

More Questions on Indian Railway

  • Q. 400 meters beyond the home signal of a C’ class station is called as ________.
    A)Last stop signal
    B)Block section
    C)Overlapping block section
    D)None of these
    Answer: Overlapping block section
  • Q. Booked speed is fixed by ________.
    A)Sr. DOM
    B)COM
    C)CCM
    D)None of these
    Answer: COM
  • Q. Mission PACE deals with
    A)Fast Ticketing System
    B)Protection of nature
    C)Help Customers
    D)Quality of Goods and Services
    Answer: Quality of Goods and Services
  • Q. What is the length of North – Eastern Frontier Railway (NEFR)?
    A)4290 km
    B)4300 Km
    C)3700 Km
    D)5298 km
    Answer: 3700 Km
  • Q. The distance between two automatic signals is normally
    A)3 km
    B)2 km
    C)1 km
    D)None of these
    Answer: 1 km
  • Q. Which state to have India’s first privately – run railway station?
    A)Kerala
    B)Tripura
    C)Odisha
    D)Madhya Pradesh
    Answer: Madhya Pradesh
  • Q. In block section trains entered simultaneously from either direction and finally stopped before collision and distance between both the trains was 400 mtrs, which type of accident occured?
    A)Save collision
    B)Violation of block rules
    C)Passingn danger signal
    D)All of above
    Answer: All of above
  • Q. When was the nationalization of Indian Railways done?
    A)1951
    B)1952
    C)1950
    D)1954
    Answer: 1950
  • Q. Who has been appointed as the new Union Minister of Railways?
    A)Ashwini Vaishnaw
    B)Piyush Goyal
    C)Nirmala Sitharaman
    D)Mukhtar Abbas Naqvi
    Answer: Ashwini Vaishnaw
  • Q. To admit the train on loop line, generally the far end points are to be ser for ________.
    A)Both
    B)Loop line
    C)Main line
    D)None of these
    Answer: Main line
  • Q. Which of the following stations was formerly known as Victoria Terminus?
    A)Lokmanya Tilak Terminus
    B)Churchgate Railway Station
    C)Mumbai Central
    D)Chhatrapati Shivaji Terminus
    Answer: Chhatrapati Shivaji Terminus
  • Q. Flasher lights will be provided in all ________ engines working on DL and Automatic areas.
    A)Power
    B)Electrical & Diesel
    C)Diesel
    D)None of these
    Answer: Electrical & Diesel
  • Q. How many systems of working in Indian Railways for train operation?
    A)8
    B)6
    C)7
    D)9
    Answer: 6
  • Q. Train crew shall exchange alright hand signals upto ________ or last points.
    A)Call-on
    B)Advance starter
    C)Starter
    D)None of these
    Answer: Advance starter
  • Q. In which year Research, Design and Standard organization was established?
    A)1959
    B)1954
    C)1957
    D)1967
    Answer: 1957
  • Q. Which authority shall be received from station in rear while colour light distant signal is blank-off?
    A)T/A409
    B)T/369(1)
    C)T/409
    D)No Need of any Authority
    Answer: T/369(1)
  • Q. During prolonged failure of signals in automatic section, ________ authority is issued.
    A)T/C 912
    B)T/B 912
    C)T/D 912
    D)T/A 912
    Answer: T/D 912
  • Q. Normal condition of automatic stop signal is ________.
    A)Yellow
    B)Red
    C)Green
    D)None of these
    Answer: Green
  • Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
    A)Station Traffic
    B)Movement of traffic
    C)None of Traffic
    D)None of these
    Answer: Movement of traffic
  • Q. After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.
    A)T/606
    B)T/605
    C)T/606
    D)T/609
    Answer: T/609

Leave a Comment