Q. How many stations to be redeveloped through PPP?

Correct Answer

600

More Questions on Indian Railway

  • Q. Departmental enquiry must be ordered by ________.
    A)DRM
    B)Sr. DPO
    C)COM
    D)Sr. DOM
    Answer: DRM
  • Q. Maximum speed of tower wagon is ________ km/h.
    A)40
    B)25
    C)20
    D)50
    Answer: 40
  • Q. In automatic areas when all signals have failed and communication is available, the driver is issued ________ as authority to proceed.
    A)T/C-912
    B)T/B-912
    C)T/D-912
    D)None of these
    Answer: T/D-912
  • Q. Except ________ signal, cabin master shall not show any other signal from his cabin during shunting.
    A)Red hand signal
    B)Yellow signal
    C)Green signal
    D)None of these
    Answer: Red hand signal
  • Q. Adequate distance means the distance sufficient to ensure ________.
    A)Station Limit
    B)Safety
    C)Non-Safety
    D)None of these
    Answer: Safety
  • Q. How much minimum BP pressure is reduce to require to apply brake in a goods train?
    A)1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
    B)Less than1.0 kg/cm2 B. 1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
    C)1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
    D)
    Answer: Less than1.0 kg/cm2 B. 1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
  • Q. When the train enters the block section without ATP, to permit to start the Train, SM to issue restarting memo with ________.
    A)Both
    B)PN
    C)Without PN
    D)None of these
    Answer: PN
  • Q. Which app has been launched by the Ministry of Railways to expedite & streamline passenger grievance redressal?
    A)Rail Madad
    B)Rail Sathi
    C)Rail Dost
    D)Rail Neer
    Answer: Rail Madad
  • Q. Colour of the semaphore shunt signal is ________.
    A)Green
    B)Red
    C)Yellow
    D)None of these
    Answer: Red
  • Q. The speed of lorry shall not exceed
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. Signal has extinguished.
    A)------00
    B)___0___
    C)0___0
    D)00___
    Answer: ------00
  • Q. Where is the Research, Design and Standard Organisation situated?
    A)Pune
    B)Lucknow
    C)Bangalore
    D)New Delhi
    Answer: Lucknow
  • Q. Signal failure advised to the driver through the station in rear will be inform
    A)T/369(3b)
    B)T/369
    C)T/370
    D)None of these
    Answer: T/369
  • Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
    A)Call-on Signal
    B)Fixed stop signal
    C)Hand Signal
    D)None of these
    Answer: Fixed stop signal
  • Q. No. of vehicles that can be attached to goods trains in rear of BV is
    A)2 bogie or its equivalent
    B)2 bogies
    C)1 bogies
    D)None of these
    Answer: 2 bogie or its equivalent
  • Q. Signal overlap at a terminal station with multi aspect colour light signalling is ________.
    A)Green
    B)White
    C)Red
    D)NIL
    Answer: NIL
  • Q. Second train during TSL will be dispatched after ________.
    A)Both
    B)Line clear
    C)Without line clear
    D)None of these
    Answer: Line clear
  • Q. The headquarter of Central Railway situated at?
    A)Gwalior
    B)Mumbai (CST)
    C)Mumbai (Church Gate)
    D)Gorakhpur
    Answer: Mumbai (CST)
  • Q. Indian Railway will be provided a device to their Gang Men which would be wireless enabled and will intimate them about approaching trains. The Device will be called:
    A)Shaktimaan
    B)Surakhsha
    C)Rail Rakshak
    D)Rakshak
    Answer: Rakshak
  • Q. When signal is not visible from minimum sighting distance, ________ signal is provided.
    A)Shunt
    B)Repeating
    C)Call-on
    D)None of these
    Answer: Repeating

Leave a Comment