Q. Hand shunting outside section in gradient ________ is prohibited except with DRM permission.

Correct Answer

ST 1-600

More Questions on Indian Railway

  • Q. Which state government has recently signed MoU with Indian Railways to expand green cover?
    A)Maharashtra
    B)Kerala
    C)Uttar Pradesh
    D)Rajasthan
    Answer: Maharashtra
  • Q. Speed of following tower wagon in the block section is ________ km/h.
    A)8
    B)5
    C)2
    D)4
    Answer: 8
  • Q. Upto how many track machine shall be allowed for working within the block section?
    A)8
    B)2
    C)5
    D)10
    Answer: 5
  • Q. The headquarters of South Railways is situated at
    A)Delhi
    B)Kolkata
    C)Chennai
    D)Mumbai
    Answer: Chennai
  • Q. On which time the watch shall be set by loco pilot with Station masters watch?
    A)A & B both
    B)At 8.00 Hrs
    C)At 16.00 Hrs
    D)At the time of on duty
    Answer: At the time of on duty
  • Q. When a motor trolley is in charge of office, the motor trolley can go upto outer most facing points after waiting for ________ minutes.
    A)20
    B)10
    C)15
    D)25
    Answer: 10
  • Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
    A)Only 1 & 3
    B)Only 1 & 2
    C)Only 2 & 3
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
    A)T/369(1)
    B)T/369(3b)
    C)T/369(2)
    D)T/409
    Answer: T/409
  • Q. In case of block forward, private number of ________ station is written on shunting authority.
    A)T/809
    B)T/806
    C)T/809
    D)T/810
    Answer: T/806
  • Q. Trap indicator is provided to indicate ________.
    A)Provision Switch
    B)Indication Switch
    C)Derailing switch
    D)None of these
    Answer: Derailing switch
  • Q. Consider the following steps in Budget Procedure in India: 1)The demands for grants of various ministries and departments including railways are considered by the concerned standing committees 2)Broad contours of the budget and the principles and policies underlying it are discussed. 3)A cut motion is moved in the Lok Sabha 4)Budget is presented in the House. Which among the following is the correct sequence of the above steps?
    A)4 2 1 3
    B)1 2 3 4
    C)1 2 4 3
    D)3 1 4 2
    Answer: 4 2 1 3
  • Q. Fly shunting will take place in
    A)Flat Yard
    B)Hump Yard
    C)Gravity Yard
    D)None of these
    Answer: Hump Yard
  • Q. The use of block instrument shall be governed by special instructions to be issued with the prior approval of
    A)CSO
    B)Railway Board
    C)CRS
    D)None of these
    Answer: CRS
  • Q. After passing an automatic stop signal at ON. If the Driver finds a train or obstruction he must stop his train at ________ away from the train or obstruction.
    A)150 meters
    B)200 meters
    C)180 meters
    D)None of these
    Answer: 150 meters
  • Q. During single line working of DL the speed of the first train is ________ kmph
    A)15
    B)25
    C)20
    D)None of these
    Answer: 25
  • Q. At what time the first train in India (and in Asia) flagged off?
    A)Saturday, 03:35 PM
    B)Saturday, 8:50 AM
    C)Sunday, 10:00 AM
    D)Sunday, 02:30 PM
    Answer: Saturday, 03:35 PM
  • Q. At the enroute, CC rake goods train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 90
  • Q. Shunting to be done in D/L block section
    A)T-806
    B)PLCT
    C)T-369(3b)
    D)Simple memo
    Answer: T-806
  • Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
    A)3
    B)1
    C)2
    D)None of these
    Answer: 3
  • Q. ________ bogies can be attached in rear of SLR of Mail/Express train.
    A)2
    B)4
    C)3
    D)8
    Answer: 2

Leave a Comment