- Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
A)25
B)20
C)15
D)None of these
Answer: 25
- Q. Palace on Wheels train was inaugurated in which year?
A)1982
B)1988
C)1972
D)1965
Answer: 1982
- Q. Adequate distance kept beyond the starter signal to take off the home signal is called as ________.
A)Block instrument
B)Signal over lap
C)Over lap
D)None of these
Answer: Signal over lap
- Q. In the enroute, passenger train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 90
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the engine.
A)5
B)4
C)2
D)8
Answer: 5
- Q. Shutting signal in the color light signal system under the starter of which light is visible in the on-condition?
A)Single white
B)Yellow
C)Two White parallel
D)No light
Answer: No light
- Q. ________ is measured with the help of anemometer.
A)Both
B)Wind
C)Velocity
D)None of these
Answer: Both
- Q. If a staff is absent for ________ days from duty fresh declaration must be obtained
A)20 days
B)10 days
C)15 days
D)None of these
Answer: 15 days
- Q. On which time the watch shall be set by loco pilot with Station masters watch?
A)A & B both
B)At 8.00 Hrs
C)At 16.00 Hrs
D)At the time of on duty
Answer: At the time of on duty
- Q. What was the main source of earning of Railway?
A)Catering
B)Goods fair
C)Passenger fair
D)None of thses
Answer: Goods fair
- Q. Where is the Research, Design and Standard Organisation situated?
A)Pune
B)Lucknow
C)Bangalore
D)New Delhi
Answer: Lucknow
- Q. If the motorman of EMU passes the automatic stop signal at ON, he shall proceed at a speed of 15/8 km/h and stop the train before ________ meters of the obstruction on the track.
A)80
B)70
C)75
D)85
Answer: 75
- Q. Written authority received to pass approach stop signal.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. What is the target time for ART during night hours?
A)60 minutes
B)30 minutes
C)45 minutes
D)20 minutes
Answer: 45 minutes
- Q. Notice station caution order No. is ________
A)T/C-409
B)T/409
C)T/B-409
D)None of these
Answer: T/409
- Q. Capacity of a catch siding is ________.
A)Station
B)Equivalent to length of full train
C)Length
D)None of these
Answer: Equivalent to length of full train
- Q. The largest national enterprise of India is
A)Airways
B)Indian Railway
C)Indian Shipyard
D)Waterways
Answer: Indian Railway
- Q. In case of ACP, Guard of EMU shall give ________ bell.
A)0-00-00
B)00-00-00
C)00-0-00
D)000-0-00
Answer: 00-0-00
- Q. Line clear is obtained from ________ / ________ to send the train upto IBS.
A)Counter circuit
B)Track circuit/axle counter
C)Circuit
D)None of these
Answer: Track circuit/axle counter
- Q. In one train only system, information of lost of metal token is given to ________.
A)DRM
B)DOM
C)AOM
D)None of these
Answer: DRM