More Questions on Indian Railway
- Q. If there is no advanced starter at A’ class station, signal overlap will be ________.
A)Block sectiond
B)Next whole block section
C)Back whole block section
D)None of these
Answer: Next whole block section
- Q. Speed of train shall not be more than ________ km/h in case of whistle failure in block section.
A)25
B)20
C)15
D)30
Answer: 25
- Q. New freight corridors announced at ________
A)Kharagpur - Vijayawada
B)Delhi - Chennai
C)Kharagpur - Mumbai
D)Gujarat - Agra
Answer: Gujarat - Agra
- Q. The main objective of British developing Indian Railway system was to facilitate the traffic between?
A)Source of raw material and production centers
B)Source of raw material and export centers
C)Source of raw material and ports
D)Source of raw material and markets
Answer: Source of raw material and production centers
- Q. A jumper is remote control and is used for ________.
A)Control on Light, Fan etc.
B)Light
C)Fans
D)None of these
Answer: Control on Light, Fan etc.
- Q. Illuminated A marker of semi-automatic signal means ________.
A)Outer signal
B)Working as automatic signal
C)Semi signal
D)None of these
Answer: Working as automatic signal
- Q. What will be the prescribed form for DMT Block?
A)E/223
B)T/409
C)T/806
D)E/233
Answer: E/223
- Q. Which city is hosting the International Conference on Green Initiatives & Railway Electrification?
A)Guwahati
B)Kochi
C)Chennai
D)New Delhi
Answer: New Delhi
- Q. When a train is received at a station during signal failure on signal post telephone, the speed of train is
A)8 kmph
B)15 kmph
C)25 kmph
D)None of these
Answer: 15 kmph
- Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
A)Third
B)First
C)Second
D)None of these
Answer: Third
- Q. Maximum number of explosive unit wagons in a mixed train is
A)3
B)5
C)7
D)None of these
Answer: 3
- Q. Which of the following is the headquarters of the newly established railway zone ‘East Coast Railways’?
A)Hyderabad
B)Visakhapatnam
C)Kolkata
D)Bhubaneswar
Answer: Bhubaneswar
- Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 5 kg/cm2 of BP pressure in the engine.
A)6
B)10
C)8
D)4
Answer: 6
- Q. To start a train from unsignalled line ________ authority is issued.
A)T/511
B)T/512
C)T/515
D)T/521
Answer: T/511
- Q. What is the position of the Indian Railway in the world according to the length of rail lines?
A)Third
B)First
C)Second
D)Fourth
Answer: Fourth
- Q. At the starting station, passenger train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. In context with the Indian railways what is TPWS?
A)Train Protection Warning Stopper
B)Train Passenger Warning System
C)Train Protection Warning System
D)Transmission Protection warning Stopper
Answer: Train Protection Warning System
- Q. How many members did the railway board had?
A)4
B)3
C)5
D)8
Answer: 4
- Q. After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
A)LI
B)TI
C)CI
D)None of these
Answer: TI
- Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Green