Q. For Temporary diversions, the permission must be obtained from

Correct Answer

Railway Board

More Questions on Indian Railway

  • Q. No. of vehicles that can be attached to goods trains in rear of BV is
    A)2 bogie or its equivalent
    B)2 bogies
    C)1 bogies
    D)None of these
    Answer: 2 bogie or its equivalent
  • Q. Load infringing standard moving dimensions (ISMD) shall be moved by
    A)Work trains
    B)Through train
    C)Shunting trains
    D)None of these
    Answer: Through train
  • Q. For a passenger carrying train to stop with a few passengers vehicles beyond platform, it must be permitted by
    A)DOM
    B)DSO
    C)DRM
    D)None of these
    Answer: DRM
  • Q. The first locomotive which was manufactured in Chittaranjan on
    A)Sep - 1949
    B)Nov - 1950
    C)Oct - 1950
    D)Oct - 1954
    Answer: Nov - 1950
  • Q. How many surrounding area may be sealed from fire in case of leakage in LPG tank wagon?
    A)1500 meters
    B)200 meters
    C)1000 meters
    D)2000 meters
    Answer: 1000 meters
  • Q. What is the name of the first train of Indian Railways handed over to private players for operation?
    A)Karnataka Express
    B)Tejas Express
    C)Shatabdi Express
    D)Duronto Express
    Answer: Tejas Express
  • Q. If there is no advanced starter at A’ class station, signal overlap will be ________.
    A)Block sectiond
    B)Next whole block section
    C)Back whole block section
    D)None of these
    Answer: Next whole block section
  • Q. Air pressure in the engine and brake van of a goods train with 58 N Boxes shall be 5.0 kg/cm2 and ________ respectively.
    A)4.5 kg/cm2
    B)4.1 kg/cm2
    C)4.2 kg/cm2
    D)4.7 kg/cm2
    Answer: 4.7 kg/cm2
  • Q. Shunt signal is a ________ signal.
    A)Both
    B)Subsidiary
    C)Ordinary
    D)None of these
    Answer: Subsidiary
  • Q. WTT will be issued ________.
    A)Three in Year
    B)Once in a Year
    C)Two in a Year
    D)None of these
    Answer: Once in a Year
  • Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
    A)Yellow
    B)RED
    C)Green
    D)None of these
    Answer: RED
  • Q. Modified lower quadrant signaling may be introduced only with section of
    A)GM
    B)Railway Board
    C)CRS
    D)None of these
    Answer: CRS
  • Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
    A)27 meters
    B)30 meters
    C)3 meters
    D)100 meters
    Answer: 30 meters
  • Q. Not more than ________ persons including trollyman shall go on a 4 HP motor trolly.
    A)9
    B)10
    C)7
    D)4
    Answer: 7
  • Q. Between which of the destinations the first Indian train was started?
    A)From Mumbai to Surat
    B)From Kolkata to Delhi
    C)From Mumbai to Thane
    D)From Mumbai to Madras
    Answer: From Mumbai to Thane
  • Q. When signal is not visible from minimum sighting distance, ________ signal is provided.
    A)Shunt
    B)Repeating
    C)Call-on
    D)None of these
    Answer: Repeating
  • Q. Caution and Termination indication Boards will be fixed from the bridge or vulnerable places at
    A)1000 meters
    B)400 meters
    C)600 meters
    D)None of these
    Answer: 600 meters
  • Q. Normal condition of automatic stop signal is ________.
    A)Yellow
    B)Red
    C)Green
    D)None of these
    Answer: Green
  • Q. Single line working inforce on double line.
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T/D 602
  • Q. Night duty should not normally be performed by the running staff for more than ________ nights at a stretch.
    A)6
    B)10
    C)12
    D)None of these
    Answer: 6