Q. During single line working of DL the speed of the first train is ________ kmph

Correct Answer

25

More Questions on Indian Railway

  • Q. Gateman competency certificate of interlocked traffic gate is signed by TI and SE (Sig) and counter signed by ________.
    A)DOM
    B)AOM(G)
    C)AOM(Chg)
    D)None of these
    Answer: AOM(G)
  • Q. Not more than ________ officials can travel in the locomotive unless authorised by operating official.
    A)3
    B)2
    C)4
    D)6
    Answer: 3
  • Q. How many training institutions of Railways are in India?
    A)Five
    B)Three
    C)Four
    D)Six
    Answer: Five
  • Q. On seeing defective stop signal during train working, Loco Pilot will sound ________ whistle to inform the same.
    A)One long one short
    B)One Long Two Short
    C)Two long one short
    D)None of these
    Answer: One Long Two Short
  • Q. When a train is received at a station during signal failure on signal post telephone, the speed of train is
    A)8 kmph
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Guard shall use ________ bell code to warn the motorman, if motorman violated the speed.
    A)0-00-00
    B)000-000
    C)00-00
    D)000-000-000
    Answer: 000-000
  • Q. During prolonged failure of signals in automatic section, ________ authority is issued.
    A)T/C 912
    B)T/B 912
    C)T/D 912
    D)T/A 912
    Answer: T/D 912
  • Q. Which whistle code shall be used by loco pilot while Approach on W board.
    A)Three short
    B)Long continue
    C)Intermittent
    D)Three long
    Answer: Intermittent
  • Q. The numbers of A, B and C coaches are 72, ________ and 76.
    A)71
    B)72
    C)70
    D)75
    Answer: 70
  • Q. Which of the following will become the first central paramilitary force to opt for e – ticketing instead of Railway warrant?
    A)Central Reserve Police Force
    B)Assam Rifles
    C)National Security Guard
    D)Sashastra Seema Bal
    Answer: National Security Guard
  • Q. Yearly goods stock census is taken on ________.
    A)30st November
    B)31st December
    C)31st October
    D)31st March
    Answer: 30st November
  • Q. Speed of the following tower wagon is ________ km/h.
    A)9
    B)10
    C)8
    D)4
    Answer: 8
  • Q. What will be the speed of second train running on T/C 602?
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: Normal speed
  • Q. To call the Guard to the driving cab, Motorman of EMU train will give ________ bell code.
    A)0
    B)0
    C)0
    D)0
    Answer: 0
  • Q. In which class overlapping section is found?
    A)C-Class
    B)A-Class
    C)B-Class
    D)D-Class
    Answer: C-Class
  • Q. When the SM receive a message from local authorities fro unsafe condition of river bunds he must issue caution order with speed ________ kmph during day.
    A)5
    B)15
    C)20
    D)None of these
    Answer: 15
  • Q. When the section is occupied, the arrow indication in the panel in Twin single line working will be
    A)No light
    B)White
    C)Red
    D)None of these
    Answer: Red
  • Q. During thick or foggy weather or night if ________ is not provided, trains are not permitted to draw ahead upto advanced starter.
    A)Both
    B)Track Circuit
    C)Track
    D)None of these
    Answer: Track Circuit
  • Q. Between which of the destinations the first Indian train was started?
    A)From Mumbai to Surat
    B)From Kolkata to Delhi
    C)From Mumbai to Thane
    D)From Mumbai to Madras
    Answer: From Mumbai to Thane
  • Q. Information of caution notice stations is given in ________.
    A)Both A or B
    B)WTT
    C)Working time table
    D)None of these
    Answer: Both A or B

Leave a Comment