Q. During failure of signals and communications in DL automatic area the authority to proceed is

Correct Answer

T/B 912

More Questions on Indian Railway

  • Q. The Rangpo – Sivok Railway line, connects which among the following two states of India?
    A)West Bengal ↔ Tripura
    B)Arunachal Pradesh ↔ Tripura
    C)Sikkim ↔ West Bengal
    D)Arunachal Pradesh ↔ Assam
    Answer: Sikkim ↔ West Bengal
  • Q. Warning boards for neutral section shall be fixed at a distance of
    A)300 and 600 meters
    B)400 and 600 meters
    C)500 and 250 meters
    D)None of these
    Answer: 500 and 250 meters
  • Q. In which year Indian Railway was nationalized?
    A)1952
    B)1947
    C)1951
    D)1955
    Answer: 1951
  • Q. The Indian Railways has launched which virtual server to optimise server usage and faster connectivity?
    A)RailSilver
    B)RailSagar
    C)RailCloud
    D)RailBharat
    Answer: RailCloud
  • Q. Hand shunting outside section in gradient ________ is prohibited except with DRM permission.
    A)ST 1-800
    B)ST 1-600
    C)ST 1-700
    D)None of these
    Answer: ST 1-600
  • Q. Target time for ARME from double exit siding is?
    A)45 minutes
    B)20 minutes
    C)30 minutes
    D)60 minutes
    Answer: 20 minutes
  • Q. Read the Following Railway Headquarters and Identify which is False?
    A)South Railway - Chennai
    B)South - Central Railway - Secunderabad
    C)Central railway - Bhopal
    D)North Railway - New Delhi
    Answer: Central railway - Bhopal
  • Q. Depot in-charge is responsible to test the detonators once in ________.
    A)Year
    B)Monthly
    C)Weekly
    D)None of these
    Answer: Year
  • Q. Which of the following stations has all the three gauges viz. broad, metre and narrow?
    A)Shimla
    B)Lucknow
    C)Chandigarh
    D)Siliguri
    Answer: Siliguri
  • Q. Maximum speed of the train while unloading ballast is ________ km/h.
    A)6
    B)8
    C)4
    D)10
    Answer: 8
  • Q. Gateman competency certificate of interlocked traffic gate is signed by TI and SE (Sig) and counter signed by ________.
    A)DOM
    B)AOM(G)
    C)AOM(Chg)
    D)None of these
    Answer: AOM(G)
  • Q. Block instrument and Advanced starter being failed after line clear?
    A)T-369(3B) with P. NO. of line clear
    B)T/C 1425
    C)T/D 602 + T-511
    D)T/D 1425
    Answer: T-369(3B) with P. NO. of line clear
  • Q. When was the first underground railway (Metro Railway) started?
    A)1984
    B)1982
    C)1989
    D)1992
    Answer: 1984
  • Q. When the SM receive a message from local authorities fro unsafe condition of river bunds he must issue caution order with speed ________ kmph during day.
    A)5
    B)15
    C)20
    D)None of these
    Answer: 15
  • Q. Sounding of ________ hooters means accident of goods train at home station.
    A)6
    B)2
    C)4
    D)8
    Answer: 2
  • Q. After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
    A)LI
    B)TI
    C)CI
    D)None of these
    Answer: TI
  • Q. Guard of passenger train shall sign on ________ minutes before the actual departure of the train.
    A)40
    B)35
    C)30
    D)35
    Answer: 30
  • Q. In Material train, vehicles shall not be detached on gradient.
    A)1-400
    B)ST 1-260
    C)1-100 or steeper
    D)None of these
    Answer: 1-100 or steeper
  • Q. Tower wagon shall run as per the rules of working of ________.
    A)Passengers
    B)Wagon
    C)Train
    D)None of these
    Answer: Train
  • Q. When the platform level is ________ MM and more second arriving train shall not be received and berthed on non platform line directly.
    A)650
    B)700
    C)725
    D)760
    Answer: 760