Q. During failure of signals and communications in DL automatic area the authority to proceed is

Correct Answer

T/B 912

More Questions on Indian Railway

  • Q. IBS shows ________ light in normal condition.
    A)Green
    B)White
    C)Red
    D)Yellow
    Answer: Red
  • Q. WTT will be issued ________.
    A)Three in Year
    B)Once in a Year
    C)Two in a Year
    D)None of these
    Answer: Once in a Year
  • Q. When the derailing switch is closed, trap indicator shows ________ Light by night and no target by day.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: Green
  • Q. To pick up the part load from the section, ________ authority is issued if the same loco pilot is proceeding.
    A)T/407
    B)T/409
    C)T/408
    D)T/406
    Answer: T/409
  • Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
    A)PWI
    B)CI
    C)LI
    D)TI
    Answer: PWI
  • Q. When a motor trolley is in charge of office, the motor trolley can go upto outer most facing points after waiting for ________ minutes.
    A)20
    B)10
    C)15
    D)25
    Answer: 10
  • Q. Train crew shall exchange alright hand signals upto ________ or last points.
    A)Call-on
    B)Advance starter
    C)Starter
    D)None of these
    Answer: Advance starter
  • Q. Which city is hosting the International Conference on Green Initiatives & Railway Electrification?
    A)Guwahati
    B)Kochi
    C)Chennai
    D)New Delhi
    Answer: New Delhi
  • Q. How many Class of Accident?
    A)20
    B)14
    C)16
    D)None of these
    Answer: 16
  • Q. The consumption of fuel during idle run per hour is
    A)25 Lts
    B)15 Lts
    C)20 Lts
    D)None of these
    Answer: 25 Lts
  • Q. Engineering allowance, loco gain and traffic gain are mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
    A)3
    B)5
    C)2
    D)4
    Answer: 5
  • Q. No. of vehicles that can be attached to goods trains in rear of BV is
    A)2 bogie or its equivalent
    B)2 bogies
    C)1 bogies
    D)None of these
    Answer: 2 bogie or its equivalent
  • Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
    A)35
    B)20
    C)25
    D)30
    Answer: 30
  • Q. When was the nationalization of Indian Railways done?
    A)1951
    B)1952
    C)1950
    D)1954
    Answer: 1950
  • Q. The first – ever Indian Railways Human Resources Round Table Conference has started in which city?
    A)Pune
    B)New Delhi
    C)Chennai
    D)Kochi
    Answer: New Delhi
  • Q. When was the new Harbour rail line inaugurated?
    A)1931
    B)1925
    C)1928
    D)1933
    Answer: 1925
  • Q. Passenger warning board is placed at a distance of ________ meters from the first stop signal.
    A)1500
    B)1200
    C)1000
    D)1800
    Answer: 1000
  • Q. Which of the following is the largest marshalling yard in India (also the longest in Asia)?
    A)Itarsi
    B)Mughalsarai
    C)Mathura
    D)Guntakal
    Answer: Mughalsarai
  • Q. Guard’s assistance is required by LP.
    A)0
    B)0
    C)0
    D)____
    Answer: 0

Leave a Comment