More Questions on Indian Railway
- Q. After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.
A)T/606
B)T/605
C)T/606
D)T/609
Answer: T/609
- Q. Any person aggrieved by a decision if labour commissioner may prefer an appeal to the central government within ________ days from the Regional Labour Commissioner
A)30
B)10
C)20
D)None of these
Answer: 30
- Q. Slip siding protects
A)Station section
B)Station limit
C)Block section
D)None of these
Answer: Block section
- Q. Water over track is 90 mm.
A)15 kmph
B)8 kmph
C)10 kmph
D)25 kmph
Answer: 10 kmph
- Q. Maximum permissible speed is fixed by ________.
A)MT
B)CRS
C)GM
D)None of these
Answer: CRS
- Q. General rules may be modified by ________.
A)T/C 912
B)T/B 912
C)T/D 912
D)T/A 912
Answer: T/D 912
- Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
A)25/10 kmph
B)15/8 kmph
C)25/8 kmph
D)25/12 kmph
Answer: 25/8 kmph
- Q. Illuminated A marker of semi-automatic signal means ________.
A)Outer signal
B)Working as automatic signal
C)Semi signal
D)None of these
Answer: Working as automatic signal
- Q. When a passenger carrying train is working with engine running tender foremost the speed is ________ if cow catcher and head light is not provided.
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these
Answer: 20 kmph
- Q. Where is the information about the Ruling Gradient of a section?
A)G & SR
B)SWR
C)WTT
D)Operating Manual
Answer: WTT
- Q. Guard shall use ________ bell code to warn the motorman, if motorman violated the speed.
A)0-00-00
B)000-000
C)00-00
D)000-000-000
Answer: 000-000
- Q. Consider the following statements with regard to ‘Ad Hoc’ Committees of the parliament: 1)They are temporary in nature and appointed for a specific purpose 2)Railway Convention Committee is an ad hoc committee Which among the above statements is / are correct?
A)Both 1 & 2 are correct
B)Only 1 is correct
C)Only 2 is correct
D)Neither 1 nor 2 is correct
Answer: Both 1 & 2 are correct
- Q. How many members did the railway board had?
A)4
B)3
C)5
D)8
Answer: 4
- Q. At the starting station, CC rake goods train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. In Material train, vehicles shall not be detached on gradient.
A)1-400
B)ST 1-260
C)1-100 or steeper
D)None of these
Answer: 1-100 or steeper
- Q. The number of line clear ticket in down direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/D 1425
Answer: T/D 1425
- Q. In case of ACP, Guard of EMU shall give ________ bell.
A)0-00-00
B)00-00-00
C)00-0-00
D)000-0-00
Answer: 00-0-00
- Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
A)T/A-912
B)T/B-912
C)T/C-912
D)None of these
Answer: T/B-912
- Q. Block section limit board provided at station?
A)B class Single line TA
B)B class Single line MAUQ
C)B class Double line TA
D)B class Double line MA
Answer: B class Double line MA
- Q. Stop signal is to be passed in On position.
A)T-806
B)T-509
C)T-369(3b)
D)Simple memo
Answer: T-369(3b)
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State