More Questions on Indian Railway
- Q. The maximum speed of a train while passing through station of interlocking std III is?
A)140 kmph
B)50 kmph
C)110 kmph
D)160 kmph
Answer: 140 kmph
- Q. What is maximum width of coaching stock in BG?
A)3250 mm
B)3050 mm
C)3200 mm
D)3300 mm
Answer: 3250 mm
- Q. The number of line clear ticket in up direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/B 1425
Answer: T/C 1425
- Q. With respect to ‘Operating ratio’ in Railways, which of the following statement is/are correct? 1)The higher is the ‘Operating Ratio’; the better is the economic condition of railways. 2) ‘Operating ratio’ of Indian Railways is high on account of social service obligation imposed in Budget. Select the correct option from the codes given below
A)Both 1 & 2
B)Only 1
C)Only 2
D)Neither 1 nor 2
Answer: Only 2
- Q. Calling on signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Subsidiary
- Q. Metro Railway is functioning in which of the following Indian States?
A)West Bengal
B)Gujarat
C)Maharashtra
D)Tamil Nadu
Answer: West Bengal
- Q. In double Distant signalling, outermost signal post is painted with ________.
A)Green & Yellow
B)White & yellow
C)Black & Yellow
D)None of these
Answer: Black & Yellow
- Q. Colour of the semaphore shunt signal is ________.
A)Green
B)Red
C)Yellow
D)None of these
Answer: Red
- Q. What is the target time for ART during night hours?
A)60 minutes
B)30 minutes
C)45 minutes
D)20 minutes
Answer: 45 minutes
- Q. Where is the Indian Railways Institute of Mechanical and Electrical Engineering institute situated?
A)Jamalpur
B)Nasik
C)Baroda
D)Pune
Answer: Jamalpur
- Q. The speed of the train over neutral section shall not be less than ________ kmph
A)40
B)20
C)30
D)None of these
Answer: 30
- Q. During thick or foggy weather or night if ________ is not provided, trains are not permitted to draw ahead upto advanced starter.
A)Both
B)Track Circuit
C)Track
D)None of these
Answer: Track Circuit
- Q. On seeing defective stop signal during train working, Loco Pilot will sound ________ whistle to inform the same.
A)One long one short
B)One Long Two Short
C)Two long one short
D)None of these
Answer: One Long Two Short
- Q. In which year Indian Railway was nationalized?
A)1952
B)1947
C)1951
D)1955
Answer: 1951
- Q. During shunting if load move toward the person signalling hand signal should be given at night by railway staff.
A)White light left and right
B)Green light up and down
C)Green light left and right
D)Green light without any movement
Answer: Green light left and right
- Q. Termination indication boards post will be pointed alternatively black and white with ________ CM high bands.
A)15
B)20
C)25
D)30
Answer: 30
- Q. At the starting station, passenger train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. When two trollies are working in section the gap between the two must be
A)400 Meters
B)100 meters
C)200 meters
D)None of these
Answer: 100 meters
- Q. Which authority shall be received to perform shunting beyond LSS at station of double line equipped with
A)T/A 602
B)T-806
C)T/A 802
D)T-806 A
Answer: T-806
- Q. Dead engine is attached at ________ position on a Mail / Express train.
A)Both
B)Engine to engine
C)Next to engine
D)None of these
Answer: Next to engine