Q. Block section limit board provided at station?

Correct Answer

B class Double line MA

More Questions on Indian Railway

  • Q. Signal has extinguished.
    A)------00
    B)___0___
    C)0___0
    D)00___
    Answer: ------00
  • Q. ________ percent sub – quota for women under all reserved categories
    A)33
    B)30
    C)35
    D)40
    Answer: 33
  • Q. Which train in India has the longest route length?
    A)Kanyakumari - Dibrugarh Vivek Express
    B)Howrah - Jammu Tawi Himgiri Express
    C)Kanyakumari - Jammu Tawi Himsagar Express
    D)Guwahati - Tiruvananthapuram Express
    Answer: Kanyakumari - Dibrugarh Vivek Express
  • Q. On DL in ________ minutes gap trains must be started during total interruption of communication.
    A)30
    B)20
    C)10
    D)None of these
    Answer: 30
  • Q. ISMD must be attached always
    A)In the middle
    B)Next to Engine
    C)In rear
    D)None of these
    Answer: Next to Engine
  • Q. The speed of lorry shall not exceed
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. The monies in the National Investment Fund can be used for ________: 1. Recapitalization of public sector banks 2. Purchasing the shares of CPSEs 3. Towards operating expenses of Indian Railways 4. Social Overheads such as building schools, toilets etc. Select the correct option from the codes given below:
    A)Only 1, 2 & 4
    B)Only 1, 2 & 3
    C)Only 2, 3 & 4
    D)Only 1 & 2
    Answer: Only 1 & 2
  • Q. For ‘B’ Class ISMD load, permission must be granted by
    A)CE
    B)DRM
    C)CRS
    D)None of these
    Answer: CE
  • Q. During shunting, outer, home and ________ signals are not taken off.
    A)Both
    B)Last stop signal
    C)First stop signal
    D)None of these
    Answer: First stop signal
  • Q. At least how far will the final detonator be used to defend the train in broad gauge?
    A)820 meters
    B)180 meters
    C)600 meters
    D)1220 meters
    Answer: 1220 meters
  • Q. If the IBS is defective and advanced starter is working, SM shall issue ________ authority with private number of next station to pass IBS.
    A)T/369(4b)
    B)T/369(3b)
    C)T/369(2B)
    D)T/369(5b)
    Answer: T/369(3b)
  • Q. If the driver does not received all right signal from the guard, he must call for is by giving.
    A)On long
    B)Two sharp whistles
    C)One long one short.
    D)None of these
    Answer: Two sharp whistles
  • Q. When was the first train steamed off in India?
    A)1875
    B)1848
    C)1853
    D)1880
    Answer: 1853
  • Q. ndian Railway’s Jamalpur Workshop is located at?
    A)Bihar
    B)West Bengal
    C)Orissa
    D)Uttar Pradesh
    Answer: Bihar
  • Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
    A)Third
    B)First
    C)Second
    D)Fourth
    Answer: Second
  • Q. When a train is received at a station during signal failure on signal post telephone, the speed of train is
    A)8 kmph
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Rake link book-let is prepared by COM and ________.
    A)DPO
    B)CPTM
    C)CPO
    D)None of these
    Answer: CPTM
  • Q. Running staff should not normally be away from head quarters for more than hours at a stretch.
    A)72
    B)24
    C)48
    D)None of these
    Answer: 72
  • Q. Used for A self propelled vehicle repairs in OHE is
    A)Moped Trolley
    B)Tower wagon
    C)Ladder Trolley
    D)None of these
    Answer: Tower wagon
  • Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.
    A)Both
    B)Red Light
    C)Green Light
    D)None of these
    Answer: Red Light