Q. Block competency certificate is given in the prescribed form ________.

Correct Answer

T/115B

More Questions on Indian Railway

  • Q. Signal sighting committee shall submit its report on form ________.
    A)T/101 B
    B)T/103 B
    C)T/102 B
    D)None of these
    Answer: T/102 B
  • Q. Which authorities shall be issued to wrong direction train running during temporary single line working on double line section on Absolute Block system?
    A)T-1425
    B)T-806 +Caution order
    C)T/D 602 + T-511
    D)None of these
    Answer: T/D 602 + T-511
  • Q. Who will be called Sahayak?
    A)Coolies
    B)New Superfast Train
    C)Upcoming Event made for Disabled Persons
    D)Railway Magazine (including Railway's upcoming ventures)
    Answer: Coolies
  • Q. Minimum depth of space for wheel flange from rail level in BG is
    A)3"
    B)2"
    C)1 (1/2)"
    D)None of these
    Answer: 1 (1/2)"
  • Q. High flood level mark shall be painted in
    A)Blue
    B)Red
    C)White
    D)None of these
    Answer: Red
  • Q. Indian Railway will publish new Magazine in all regional language. The name of that Magazine is:
    A)Rail Prakashan
    B)Rail Line
    C)Big Thing, Big Way
    D)Rail Bandhu
    Answer: Rail Bandhu
  • Q. No. of vehicles that can be attached to goods trains in rear of BV is
    A)2 bogie or its equivalent
    B)2 bogies
    C)1 bogies
    D)None of these
    Answer: 2 bogie or its equivalent
  • Q. Tank engine can run at ________ speed if cow catcher and head light during night is provided.
    A)50 kmph
    B)Booked
    C)Sectional
    D)None of these
    Answer: Sectional
  • Q. Loco and traffic running staff are entitled for ________ hours rest at head quarters after running duty of 08 hours or more
    A)12 hours
    B)04 hours
    C)08 hours
    D)16 hours
    Answer: 16 hours
  • Q. On which place the competent Railway servant shall be appointed to show proceed hand signal while receive a train on obstructed line on calling-on signal?
    A)45 meters beyond the obstruction
    B)At 1st facing point of station
    C)Facing point of concern line
    D)No need
    Answer: 45 meters beyond the obstruction
  • Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?
    A)North Korea
    B)Japan
    C)South Korea
    D)China
    Answer: Japan
  • Q. The form number of authority to proceed without line clear is ________.
    A)T/B1408
    B)T/1408
    C)T/A1408
    D)None of these
    Answer: T/1408
  • Q. If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Verbally
    B)Walkie-Talkie
    C)Written Memo
    D)None of these
    Answer: Written Memo
  • Q. Block section limit board provided at station?
    A)B class Single line TA
    B)B class Single line MAUQ
    C)B class Double line TA
    D)B class Double line MA
    Answer: B class Double line MA
  • Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
    A)Both
    B)Temporary Working Order.
    C)Permanent working order.
    D)None of these
    Answer: Temporary Working Order.
  • Q. What is the width of broad gauge railway line in India?
    A)4 feet 11 inches
    B)5 feet 3 inches
    C)5 feet 6 inches
    D)5 feet 4 inches
    Answer: 5 feet 6 inches
  • Q. The additional Hours in the case of staff posted at way side stations who are provided with quarters within 0.5kkm will be ________ beyond.
    A)24 Hours
    B)12 Hours
    C)08 Hours
    D)16Hours
    Answer: 24 Hours
  • Q. The additional Hours in the case of Gate man C saloon attendant, care takers will be ________
    A)24 Hours
    B)12 Hours
    C)08 Hours
    D)16 Hours
    Answer: 24 Hours
  • Q. Maximum speed of tower wagon is ________ km/h.
    A)40
    B)25
    C)20
    D)50
    Answer: 40
  • Q. Impact speed of shunting of one box wagon is ________ km/h.
    A)6
    B)2
    C)5
    D)8
    Answer: 5