More Questions on Indian Railway
- Q. Which state to have India’s first privately – run railway station?
A)Kerala
B)Tripura
C)Odisha
D)Madhya Pradesh
Answer: Madhya Pradesh
- Q. Point indicator is provided to indicate ________.
A)Both
B)Points
C)Bar
D)None of these
Answer: Points
- Q. The maximum distance covered by a patrol man should not normally exceed
A)15 KM
B)10 KM a day
C)12 KM
D)None of these
Answer: 10 KM a day
- Q. When the derailing switch is closed, trap indicator shows ________ Light by night and no target by day.
A)Yellow
B)Red
C)Green
D)White
Answer: Green
- Q. On double line, when a running line is blocked by stabled load , the point to be set against are
A)Advance point
B)Either side points
C)Rear points
D)None of these
Answer: Rear points
- Q. General Manger is responsible for
A)Both railway Board and Railway Ministry
B)Railway Board
C)Railway Ministry
D)None of these
Answer: Railway Board
- Q. Any person aggrieved by a decision if labour commissioner may prefer an appeal to the central government within ________ days from the Regional Labour Commissioner
A)30
B)10
C)20
D)None of these
Answer: 30
- Q. Validity of the competency certificate of the gateman is for ________ years.
A)9
B)10
C)3
D)4
Answer: 3
- Q. When the derailing switch is open, trap indicator shows red target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Red
- Q. Cancellation facility through ________ helpline number will be provided using ‘One Time Password’ sent on registered phone number.
A)139
B)144
C)123
D)119
Answer: 139
- Q. General rules may be modified by ________.
A)T/C 912
B)T/B 912
C)T/D 912
D)T/A 912
Answer: T/D 912
- Q. Maximum of ________ cranes can be attached in a passenger train.
A)3
B)1
C)2
D)4
Answer: 1
- Q. If the Distant signal of a Gate becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
A)Nil caution order
B)Caution order
C)Reminder order
D)None of these
Answer: Caution order
- Q. Departmental enquiry must be ordered by ________.
A)DRM
B)Sr. DPO
C)COM
D)Sr. DOM
Answer: DRM
- Q. On DL in ________ minutes gap trains must be started during total interruption of communication.
A)30
B)20
C)10
D)None of these
Answer: 30
- Q. The largest national enterprise of India is
A)Airways
B)Indian Railway
C)Indian Shipyard
D)Waterways
Answer: Indian Railway
- Q. When the train enters the block section without ATP, to permit to start the Train, SM to issue restarting memo with ________.
A)Both
B)PN
C)Without PN
D)None of these
Answer: PN
- Q. What will be the maximum speedof train in case of failure of headlight of engine?
A)60 kmph
B)30 kmph
C)40 kmph
D)Normal speed
Answer: 40 kmph
- Q. If outside the station limits the distance between two trains is ________ in averted collusion, such occurrence may not be treated as an averted collision.
A)100 meter
B)200 meter
C)250 meter
D)400 meters and more
Answer: 400 meters and more
- Q. When a stream engine is running tender foremost the speed shall not exceed ________.
A)30 kmph
B)40 kmph
C)20 kmph
D)None of these
Answer: 40 kmph
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State