- Q. The validity of BCC is for ________ years
A)01 years
B)03 years
C)02 years
D)None of these
Answer: 03 years
- Q. How many dead engine can be attached in a goods train?
A)3
B)1
C)2
D)4
Answer: 1
- Q. Consider the following statements: 1. Anti – collision device (ACD) Network is patented by Konkan Railway Corporation Ltd. 2. Anti – collision device (ACD) uses Global Positioning System for its work Which among the above statements is / are correct?
A)Both are true
B)Only 1 is true
C)Only 2 is true
D)Neither is true
Answer: Both are true
- Q. Your train is first during TSL on double line.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 25 kmph
- Q. In which year Indian Railway was nationalized?
A)1952
B)1947
C)1951
D)1955
Answer: 1951
- Q. After how many time train shall be protected by Guard in rear if 1st stop signal found in On position?
A)15 minutes
B)10 minutes
C)5 minutes
D)No need
Answer: 15 minutes
- Q. BD special shall be turned out during night within
A)30 meters
B)25 meters
C)45 meters
D)None of these
Answer: 45 meters
- Q. How many hooters shall be used for ART at the time of accident of a goods train outside the HQ.
A)4
B)2
C)3
D)5
Answer: 3
- Q. Used for A self propelled vehicle repairs in OHE is
A)Moped Trolley
B)Tower wagon
C)Ladder Trolley
D)None of these
Answer: Tower wagon
- Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
A)Third
B)First
C)Second
D)None of these
Answer: Third
- Q. The shuttle train service between Lahore and ________ railway station resumed its operation on 15 December after a gap of 22 years.
A)Amritsar
B)Wagah
C)Islamabad
D)Faridkot
Answer: Wagah
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
A)3
B)5
C)2
D)4
Answer: 5
- Q. Maximum speed of the train while unloading ballast is ________ km/h.
A)6
B)8
C)4
D)10
Answer: 8
- Q. What is the normal aspect of an Automatic stop signal on double line Automatic section?
A)DOUBLE YELLOW
B)RED
C)GREEN
D)YELLOW
Answer: GREEN
- Q. “C” class ODC is run with the permission of ________.
A)Head Quarter
B)DOM
C)CRS
D)None of these
Answer: CRS
- Q. Shunting restrictions of station is written in ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: SWR
- Q. The banner flag is a ________
A)Both of these
B)Temporary stop signal
C)Permanent stop signal
D)None of these
Answer: Temporary stop signal
- Q. There is insufficient vacuum/pressure in engine.
A)_____00
B)___0___
C)0___0
D)00-----
Answer: 00-----
- Q. Which marker is available in repeating signal?
A)P-Marker
B)G-Marker
C)C-Marker
D)R-Marker
Answer: R-Marker
- Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph