More Questions on Indian Railway
- Q. Which of the following is India’s first green railway corridor?
A)Chennai to Manamadurai
B)Barmer to Munawab
C)Manamadurai to Rameswaram
D)Puri to Visakhapatnam
Answer: Manamadurai to Rameswaram
- Q. Standard time is set at all station every day ________ Hours
A)16
B)10
C)15
D)None of these
Answer: 16
- Q. The length of long welded rail under Indian conditions should be about
A)0.50 km
B)1 km
C)2 km
D)None of these
Answer: 1 km
- Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
A)25/10 kmph
B)15/8 kmph
C)25/8 kmph
D)25/12 kmph
Answer: 25/8 kmph
- Q. Shunting to be done in D/L block section
A)T-806
B)PLCT
C)T-369(3b)
D)Simple memo
Answer: T-806
- Q. It is a Python Rake.
A)15 kmph
B)60 kmph
C)25 kmph
D)Normal speed
Answer: 60 kmph
- Q. Which city is hosting the International Conference on Green Initiatives & Railway Electrification?
A)Guwahati
B)Kochi
C)Chennai
D)New Delhi
Answer: New Delhi
- Q. On which place the Guard should be presented at the time of train backed from one running line to another line?
A)In Break van
B)At Facing point
C)On Engine
D)At Anyplace
Answer: In Break van
- Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
A)Yellow
B)RED
C)Green
D)None of these
Answer: RED
- Q. Consider the following statements with regard to ‘Ad Hoc’ Committees of the parliament: 1)They are temporary in nature and appointed for a specific purpose 2)Railway Convention Committee is an ad hoc committee Which among the above statements is / are correct?
A)Both 1 & 2 are correct
B)Only 1 is correct
C)Only 2 is correct
D)Neither 1 nor 2 is correct
Answer: Both 1 & 2 are correct
- Q. The manufacturing of steam engine in Chittranjan Locomotive Works was stopped in
A)1972
B)1974
C)1961
D)1973
Answer: 1972
- Q. Flasher lights will be provided in all ________ engines working on DL and Automatic areas.
A)Power
B)Electrical & Diesel
C)Diesel
D)None of these
Answer: Electrical & Diesel
- Q. In case of goods train without brake van, Guard is exempted from ________.
A)Whistling
B)ARS
C)Tail Lamp
D)None of these
Answer: ARS
- Q. Tank engine can run at ________ speed if cow catcher and head light during night is provided.
A)50 kmph
B)Booked
C)Sectional
D)None of these
Answer: Sectional
- Q. During TFC in double line which authority to serve the driver for train operation?
A)TC-602
B)TC-1425
C)TA-602
D)TD-1425
Answer: TC-602
- Q. Permission of ________ is required to work the material train in the night.
A)DRM
B)AOM
C)DOM
D)None of these
Answer: DRM
- Q. If distant signal show green accepts, which indication is shown for loco pilot on single distant?
A)Receive on loop line
B)Run through from station
C)Receive of Main line
D)None of these
Answer: Run through from station
- Q. During failure of signals and communications in DL automatic area the authority to proceed is
A)T/B 912
B)T/D 912
C)T/A 912
D)None of these
Answer: T/B 912
- Q. Which marker is available in repeating signal?
A)P-Marker
B)G-Marker
C)C-Marker
D)R-Marker
Answer: R-Marker
- Q. What is the massage of 000 (three short) whistle sound by loco pilot?
A)Train parting
B)Signal Approaching
C)Train out of control
D)Unable to proceed
Answer: Train out of control
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State