Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 5 kg/cm2 of BP pressure in the engine.

Correct Answer

6

More Questions on Indian Railway

  • Q. What type of speed restriction imposed for loco pilot when at LC gate communication not available between Gateman & Station Master ?
    A)8 kmph
    B)15 kmph
    C)10 kmph
    D)Normal
    Answer: 10 kmph
  • Q. To protect his train, Guard must first proceed ________ meters in rear and place one detonator in BG in absolute block system.
    A)1200
    B)600
    C)800
    D)None of these
    Answer: 600
  • Q. Who will be called Sahayak?
    A)Coolies
    B)New Superfast Train
    C)Upcoming Event made for Disabled Persons
    D)Railway Magazine (including Railway's upcoming ventures)
    Answer: Coolies
  • Q. If distant signal show green accepts, which indication is shown for loco pilot on single distant?
    A)Receive on loop line
    B)Run through from station
    C)Receive of Main line
    D)None of these
    Answer: Run through from station
  • Q. Permission of ________ is required to work the material train in the night.
    A)DRM
    B)AOM
    C)DOM
    D)None of these
    Answer: DRM
  • Q. The headquarter of Central Railway situated at?
    A)Gwalior
    B)Mumbai (CST)
    C)Mumbai (Church Gate)
    D)Gorakhpur
    Answer: Mumbai (CST)
  • Q. The number of Train examination report is ________.
    A)T/436
    B)T/431
    C)T/432
    D)T/436
    Answer: T/431
  • Q. While protecting the material train, banner flag is placed at a distance of
    A)600
    B)400
    C)500
    D)800
    Answer: 600
  • Q. Speed of the last train during ACF on double line is ________ km/h.
    A)20/15/Walking
    B)25/10/Walking
    C)20/10/Walking
    D)None of these
    Answer: 25/10/Walking
  • Q. During power failure in automatic block section, on which authority relief engine will proceed?
    A)TC-912
    B)TA-912
    C)TB-912
    D)TD-912
    Answer: TC-912
  • Q. What is maximum width of coaching stock in BG?
    A)3250 mm
    B)3050 mm
    C)3200 mm
    D)3300 mm
    Answer: 3250 mm
  • Q. At a C’ class staion in two aspect signalling system, ________ and home signals are provided.
    A)Sectional
    B)Corner
    C)Warner
    D)None of these
    Answer: Warner
  • Q. Speed of train shall not be more than ________ km/h in case of whistle failure in block section.
    A)25
    B)20
    C)15
    D)30
    Answer: 25
  • Q. When the points are set for main line, point indicator shows white target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: White
  • Q. To apply for Line block, the notice shall be given to DRM not less than
    A)12 hours
    B)48 hours
    C)24 hours
    D)None of these
    Answer: 24 hours
  • Q. Railway Staff College is situated at
    A)Chennai
    B)Bangalore
    C)Secunderabad
    D)Vadodara
    Answer: Vadodara
  • Q. Which type Authority to proceed shall be used at without starter signal station on single line?
    A)Any one
    B)Non Tangible
    C)Tangible
    D)None of these
    Answer: Tangible
  • Q. Distance between outer and home signals on a double line is ________ meters.
    A)400
    B)900
    C)800
    D)700
    Answer: 400
  • Q. Semi-automatic signal is identified by ________.
    A)Illuminated a marker
    B)Marker
    C)Semi marker
    D)None of these
    Answer: Illuminated a marker
  • Q. EMU trains of harbour line has ________ number of wooden wedges.
    A)6
    B)2
    C)4
    D)8
    Answer: 4

Leave a Comment