More Questions on Indian Railway
- Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
A)Both
B)Path
C)Platform
D)None of these
Answer: Platform
- Q. Repeating signal shows ________ light in ON condition.
A)Green
B)Red
C)Yellow
D)None of these
Answer: Red
- Q. When the water rises above ballast level, but below rail level in cause ways, train may be permitted to run by
A)2 gangman
B)JE(Pway)
C)One gangman
D)None of these
Answer: JE(Pway)
- Q. The main objective of British developing Indian Railway system was to facilitate the traffic between?
A)Source of raw material and production centers
B)Source of raw material and export centers
C)Source of raw material and ports
D)Source of raw material and markets
Answer: Source of raw material and production centers
- Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
A)T/369(1)
B)T/369(3b)
C)T/369(2)
D)T/409
Answer: T/409
- Q. Who will be called Sahayak?
A)Coolies
B)New Superfast Train
C)Upcoming Event made for Disabled Persons
D)Railway Magazine (including Railway's upcoming ventures)
Answer: Coolies
- Q. Maximum number of explosive unit wagons in a mixed train is
A)3
B)5
C)7
D)None of these
Answer: 3
- Q. After advising the SM about Engine failure, if the Engine is able to move Driver can proceed with one Railway Servant walk in the front and another follow the train with danger signal at a distance not less than ________ Meters on MG/BG.
A)300/400
B)500/600
C)400/500
D)None of these
Answer: 500/600
- Q. Maximum speed of tower wagon is ________ km/h.
A)40
B)25
C)20
D)50
Answer: 40
- Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
A)10 meters
B)20 meters
C)15 meters
D)5 meters
Answer: 20 meters
- Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
A)3
B)1
C)2
D)None of these
Answer: 3
- Q. Apart from the regular store, Guard of material train must also possess ________.
A)Third aid box
B)First aid box
C)Second aid box
D)None of these
Answer: First aid box
- Q. At a station in gradient in 1-260 or steeper, during shunting the Engine must be on the ________ gradient.
A)Both
B)UP
C)Falling
D)None of these
Answer: UP
- Q. Signal overlap at a terminal station with multi aspect colour light signalling is ________.
A)Green
B)White
C)Red
D)NIL
Answer: NIL
- Q. For disconnection of points S&T official must issue form ________
A)T/B 351
B)T/351
C)T/A 351
D)None of these
Answer: T/351
- Q. Loco Pilot shall sound _________ whistle to acknowledge the Guard hand signal.
A)Three Long
B)One Long
C)Two Long
D)None of these
Answer: One Long
- Q. During thick or foggy weather or night if ________ is not provided, trains are not permitted to draw ahead upto advanced starter.
A)Both
B)Track Circuit
C)Track
D)None of these
Answer: Track Circuit
- Q. Number of train signal register of double line is ________.
A)T/66 B
B)T/66 A
C)T/66 C
D)T/66
Answer: T/66 B
- Q. The Maitree Express connects India with which of the following countries?
A)Bangladesh
B)Myanmar
C)Pakistan
D)Nepal
Answer: Bangladesh
- Q. The headquarters of North – East Frontier Railway (NFR) is
A)Chennai
B)Kolkata
C)Maligaon (Guwahati)
D)Gorakhpur
Answer: Maligaon (Guwahati)