More Questions on Indian Railway
- Q. In Automatic block system, when a train is working on T/B912, the speed over, points at station is
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 15 kmph
- Q. Consider the following: 1)Real Estate Investment Trust 2)Railway operation 3)Atomic Energy As of now, there is no FDI in India, in which of above sector(s)?
A)1, 2 & 3
B)1 Only
C)1 & 2 Only
D)None
Answer: 1, 2 & 3
- Q. When a passenger carrying train is working with engine running tender foremost the speed is ________ if cow catcher and head light is not provided.
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these
Answer: 20 kmph
- Q. The speed of Engine on Baharline is ________ kmph
A)16
B)10
C)15
D)None of these
Answer: 10
- Q. Station Working Rules of Non-interlocked station is signed by ________.
A)AOM & ADEN
B)DOM & DEN
C)Sr. DOM & Sr. DEN
D)None of these
Answer: Sr. DOM & Sr. DEN
- Q. Under approved special instructions, Distant signal can be placed along with the
A)Both
B)Last Stop
C)First Stop
D)None of these
Answer: Last Stop
- Q. On November 14, 2019, With which locomotive factory, Indian Railways & French multinational company Alstom have entered into procurement cum maintenance agreement to deliver the 10 locomotives in FY (fiscal year) 2019 – 20?
A)Rail Wheel Factory
B)Modern Coach Factory
C)Integral Coach Factory
D)Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
Answer: Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
- Q. What will be distance between fire affected train and rest of the train ?
A)50 meters
B)25 meters
C)45 meters
D)100 meters
Answer: 45 meters
- Q. How many minimum BP pressure is require in engine to charge Goods train?
A)5.8 kg/cm2 D. 5.00 kg/cm2
B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
D)5.00 kg/cm2
Answer: 5.00 kg/cm2
- Q. Motor Trolley permit is ________
A)T/1625
B)T/1425
C)T/1525
D)None of these
Answer: T/1525
- Q. What will be the maximum speed if leading cab of electric engine is defective and assistant driver is operating the train from rear cab?
A)40 kmph
B)15 kmph
C)30 kmph
D)Normal
Answer: 40 kmph
- Q. Load table is mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. What is the length of North-Eastern Frontier Railway (NFR)?
A)4290 km
B)4300 km
C)3700 km
D)5298 km
Answer: 3700 km
- Q. At the starting station, CC rake goods train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. “Act” means the Railway Act is ________.
A)1989 (22 of 1989)
B)1989 (24 of 1989)
C)1989 (23 of 1989)
D)None of these
Answer: 1989 (24 of 1989)
- Q. How an automatic stop signal can be recognized?
A)Eliminated A marker
B)A marker on white disk
C)No mark
D)Four aspects
Answer: A marker on white disk
- Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
A)T/104C
B)T/105B
C)T/106B
D)T/102B
Answer: T/102B
- Q. In two aspects areas where shunting in the face of approaching train is not permitted, shunting can be permitted during ________ and under certain conditions (UP to FSS).
A)Both
B)Day
C)Night
D)None of these
Answer: Day
- Q. What is the speed of a train after normalized in OHE supply immediate after tripping?
A)40/15 kmph
B)60/30 kmph
C)35/20 kmph
D)Normal speed
Answer: 35/20 kmph
- Q. Mountain Railways of India refer to the railway lines built in the mountains of India in the nineteenth and early twentieth century, during the British Raj, even being run today by the Indian Railways. How many railway lines refer to the Mountain Railways of India ?
A)5
B)3
C)4
D)6
Answer: 3
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State