Q. At a C’ class staion in two aspect signalling system, ________ and home signals are provided.
A
Sectional
B
Corner
C
Warner
D
None of these
Correct Answer
Warner
More Questions on Indian Railway
Q. To receive the train which has entered the block section without authority to proceed, SM to issue ________ and pilot the train or by signal post telephone.
A)T/369(B) B)T/369(3b) C)T/369(2b) D)None of these
Answer: T/369(2b)
Q. Trolley caution order no is ________.
A)600 B)400 C)500 D)800
Answer: 400
Q. Signal sighting committee consists of TI, SI/PWI and ________.
A)T/C 912 B)T/B 912 C)T/D 912 D)T/A 912
Answer: T/D 912
Q. IN the BD Spl, the water must be filled ________.
A)Three Week B)Once a week C)Two week D)None of these
Answer: Once a week
Q. Any person aggrieved by a decision if labour commissioner may prefer an appeal to the central government within ________ days from the Regional Labour Commissioner
A)30 B)10 C)20 D)None of these
Answer: 30
Q. The headquarters of South Railways is situated at
A)Delhi B)Kolkata C)Chennai D)Mumbai
Answer: Chennai
Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
A)PWI B)CI C)LI D)TI
Answer: PWI
Q. BD special shall be turned out during night within
A)30 meters B)25 meters C)45 meters D)None of these
Answer: 45 meters
Q. Station section available in which Class of Station?
A)C-Class B)A-Class C)B-Class D)D-Class
Answer: B-Class
Q. Wagon with livestock shall be attached ________ position from engine on a passenger train.
A)Third B)First C)Second D)None of these
Answer: Second
Q. Whenever new signal is placed, caution order is issued to Loco Pilot for ________ days.
A)35 B)15 C)20 D)10
Answer: 10
Q. Length of BOXN Wagon is
A)10.71 meters B)8.67 meters C)9.78 meters D)None of these
Answer: 10.71 meters
Q. How much block overlap is required at the station equipped with MACLS?
Q. For work of long duration, the stop indicator must be erected at not less than
A)40 B)30 C)50 D)45
Answer: 30
Q. Fly shunting will take place in
A)Flat Yard B)Hump Yard C)Gravity Yard D)None of these
Answer: Hump Yard
Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
A)TD-912 B)TA-912 C)TB-912 D)TC-1425
Answer: TA-912
Q. The headquarters of the South Central Railway zone is located in?
A)Hyderabad B)Kolkata C)Secunderabad D)Gorakhpur
Answer: Secunderabad
Q. With reference to headquarters of the various Railway zones, consider the following matches: North Eastern → Guwahati Central → Bhopal Western → Mumbai Which of the above is / are correct matches:
A)Only 2 & 3 B)Only 1 C)Only 1 & 2 D)Only 3
Answer: Only 3
Q. Maximum No. of ________ track machines can be sent for working in a block section.
A)25 B)20 C)15 D)30
Answer: 25
Q. How many training institutions of Railways are in India?