- Q. Shunting speed of 5 box wagons is ________ km/h.
A)6
B)2
C)5
D)8
Answer: 2
- Q. passing through station during day when running without brakevan and tail board.
A)25 kmph
B)10 kmph
C)20 kmph
D)Normal speed
Answer: 20 kmph
- Q. If the patrol man does not turn up within ________ minutes, caution order must be issued.
A)15
B)10
C)5
D)20
Answer: 20
- Q. Minimum distance apart of refuges in Tunnels in BG is (at present)
A)200 meters
B)100 meters
C)150 meters
D)None of these
Answer: 100 meters
- Q. Loco pilot must have ________ sets of spectacles in his personal store.
A)Three
B)Two
C)One
D)None of these
Answer: Two
- Q. If loco pilot do not work in any section for more than 6 months, road learning for 2 trips by day and ________ trip by night is given.
A)3
B)1
C)2
D)4
Answer: 1
- Q. The validity of BCC is for ________ years
A)01 years
B)03 years
C)02 years
D)None of these
Answer: 03 years
- Q. During accident or Engine failure in the mid section the report sent to SM must be signed by ________.
A)Both
B)GDR
C)TDR
D)None of these
Answer: GDR
- Q. Accident drill is ordered by DRM and is conducted under the supervision of ________
A)DOM
B)ADRM/Sr.DSO/DSO
C)Sr.DOM
D)None of these
Answer: ADRM/Sr.DSO/DSO
- Q. In Material train, vehicles shall not be detached on gradient.
A)1-400
B)ST 1-260
C)1-100 or steeper
D)None of these
Answer: 1-100 or steeper
- Q. Hand shunting of vehicles is prohibited in gradient
A)1 - 400 or steeper
B)1 - 260
C)1 - 400
D)None of these
Answer: 1 - 400 or steeper
- Q. Indian Railway will be provided a device to their Gang Men which would be wireless enabled and will intimate them about approaching trains. The Device will be called:
A)Shaktimaan
B)Surakhsha
C)Rail Rakshak
D)Rakshak
Answer: Rakshak
- Q. A station where the rail lines end, is called
A)Block station
B)Junction station
C)Way - side station
D)Terminal station
Answer: Terminal station
- Q. After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.
A)T/606
B)T/605
C)T/606
D)T/609
Answer: T/609
- Q. Percentage of in operative cylinders that can be attached in goods train is
A)5%
B)15%
C)10%
D)None of these
Answer: 15%
- Q. At which of the following places steam engines were originally manufactured by Indian Railway ?
A)Chittranjan
B)Varanasi
C)Perambur
D)Patiala
Answer: Chittranjan
- Q. Station Master shall give line clear with ________ while granting line clear.
A)Calling-on
B)Shunt signal
C)Private No.
D)None of these
Answer: Private No.
- Q. EMU train has ________ type of couplings.
A)Shakuu
B)Shakau
C)Shakua
D)None of these
Answer: Shakau
- Q. When a crane is attached to a goods train with jib trailing the speed in BG is ________.
A)25 kmph
B)50 kmph
C)40 kmph
D)None of these
Answer: 40 kmph
- Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
A)25/10 kmph
B)15/8 kmph
C)25/8 kmph
D)25/12 kmph
Answer: 25/8 kmph