More Questions on Indian Railway
- Q. What will be the speed of goods train without brake van while passing station if tail lamp is not provided?
A)Normal
B)20 kmph
C)50 kmph
D)Stop at every station
Answer: 20 kmph
- Q. Signals are treated as ________ if connected points become defective.
A)Both
B)Defective
C)Restricted
D)None of these
Answer: Defective
- Q. To receive a train on unsignalled line, ________ authority is issued.
A)T/369(4b) Pilot in MEMU
B)T/369(3b) Pilot in MEMO
C)T/369(2B) Pilot in MEMO
D)T/369(5b) Pilot in MEMU
Answer: T/369(3b) Pilot in MEMO
- Q. If the G marker Gate signal is at ON, Loco pilot may pass it after stopping for 01 minute by day and ________ minutes by night.
A)8
B)5
C)2
D)4
Answer: 2
- Q. For ‘B’ Class ISMD load, permission must be granted by
A)CE
B)DRM
C)CRS
D)None of these
Answer: CE
- Q. The Ministry of Railways has recently launched which app for freight managers?
A)SNOORTI app
B)SFOORTI app
C)SKOORTI app
D)SMOORTI app
Answer: SFOORTI app
- Q. The first officer of the ________ department to arrive or present shall be responsible for the marshaling of the BD Special.
A)C & W
B)Engineering
C)Mechanical
D)None of these
Answer: Mechanical
- Q. TCAS full form is:
A)Train Collision Avoidance Software
B)Train Collision Advance System
C)Train Complement Accident Software
D)Traffic Collision Avoidance System
Answer: Traffic Collision Avoidance System
- Q. Maximum No. of ________ coaches can be attached in rear of SLR of passenger train.
A)4
B)2
C)3
D)6
Answer: 2
- Q. Semaphore of the signal is painted in the colour as it shows in the night in ________ condition.
A)Both
B)Off
C)On
D)None of these
Answer: On
- Q. In how many zones Indian Railway has been divided?
A)17
B)14
C)16
D)20
Answer: 17
- Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
A)10 meters
B)20 meters
C)15 meters
D)5 meters
Answer: 20 meters
- Q. D class station board is placed ________ meters from the end of the platform.
A)600
B)400
C)500
D)800
Answer: 500
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the brake van.
A)6.8
B)7.8
C)5.8
D)4.8
Answer: 4.8
- Q. To send the assisting engine into obstructed block section T/A 602 authority is issued ________ and the speed of engine shall be ________.
A)15/10 km/h
B)25/10 km/h
C)20/10 km/h
D)None of these
Answer: 15/10 km/h
- Q. Indian Railway will be provided a device to their Gang Men which would be wireless enabled and will intimate them about approaching trains. The Device will be called:
A)Shaktimaan
B)Surakhsha
C)Rail Rakshak
D)Rakshak
Answer: Rakshak
- Q. How many copies of caution order shall be prepared for a train provided with banking engine?
A)5
B)3
C)4
D)None of these
Answer: 5
- Q. To protect his train, Guard must first proceed ________ meters in rear and place one detonator in BG in absolute block system.
A)1200
B)600
C)800
D)None of these
Answer: 600
- Q. The additional Hours in the case of Gate man C saloon attendant, care takers will be ________
A)24 Hours
B)12 Hours
C)08 Hours
D)16 Hours
Answer: 24 Hours
- Q. Fly shunting will take place in
A)Flat Yard
B)Hump Yard
C)Gravity Yard
D)None of these
Answer: Hump Yard
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State