- Q. First Train started in India?
A)1853
B)1851
C)1852
D)1854
Answer: 1853
- Q. Mission PACE deals with
A)Fast Ticketing System
B)Protection of nature
C)Help Customers
D)Quality of Goods and Services
Answer: Quality of Goods and Services
- Q. What was the main source of earning of Railway?
A)Catering
B)Goods fair
C)Passenger fair
D)None of thses
Answer: Goods fair
- Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
A)10
B)7
C)9
D)15
Answer: 7
- Q. Distant signal shows ________ light in normal condition in double distant signalling is provided.
A)Three yellow
B)One Yellow
C)Two yellow
D)Four yellow
Answer: Two yellow
- Q. When the derailing switch is open, trap indicator shows red target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Red
- Q. What will be the prescribed form for DMT Block?
A)E/223
B)T/409
C)T/806
D)E/233
Answer: E/223
- Q. Air pressure in the engine and brake van of a goods train with 58 N Boxes shall be 5.0 kg/cm2 and ________ respectively.
A)4.5 kg/cm2
B)4.1 kg/cm2
C)4.2 kg/cm2
D)4.7 kg/cm2
Answer: 4.7 kg/cm2
- Q. What is the means of EA in WTT?
A)Extra recovery time
B)Extra allowances
C)Engineering allowances
D)None of these
Answer: Engineering allowances
- Q. Diesel locomotives are built in?
A)Perambur
B)Banglore
C)Varanasi
D)Hubli
Answer: Varanasi
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
A)3
B)5
C)2
D)4
Answer: 5
- Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
A)25
B)20
C)15
D)None of these
Answer: 25
- Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
A)27 meters
B)30 meters
C)3 meters
D)100 meters
Answer: 30 meters
- Q. A material train may be divided outside station limit during emergency under the supervision of ________.
A)Driver
B)Guard
C)PWI
D)None of these
Answer: PWI
- Q. Slip siding protects
A)Station section
B)Station limit
C)Block section
D)None of these
Answer: Block section
- Q. Loco and traffic running staff are eligible for ________ hours rest at Head quarters after running duty of less than 08 hours.
A)12 Hours
B)06 Hours
C)10 Hours
D)None of these
Answer: 12 Hours
- Q. What will be the speed of goods train without brake van while passing station if tail lamp is not provided?
A)Normal
B)20 kmph
C)50 kmph
D)Stop at every station
Answer: 20 kmph
- Q. Where is RDSO Situated.
A)Chennai
B)Vadodara
C)Lucknow
D)New Delhi
Answer: Lucknow
- Q. In Automatic block system, when a train is working on T/B912, the speed over, points at station is
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 15 kmph
- Q. If the block instrument becomes defective on a double line, ________ signal is also treated as defective.
A)Stop signal
B)Fisrt Stop signal
C)Last stop signal
D)None of these
Answer: Last stop signal