- Q. Metro Railway is functioning in which of the following Indian States?
A)West Bengal
B)Gujarat
C)Maharashtra
D)Tamil Nadu
Answer: West Bengal
- Q. Presentation of the first ever railway budget in India held in
A)1925
B)1853
C)1888
D)1905
Answer: 1925
- Q. Who will be called Sahayak?
A)Coolies
B)New Superfast Train
C)Upcoming Event made for Disabled Persons
D)Railway Magazine (including Railway's upcoming ventures)
Answer: Coolies
- Q. The maximum speed of the assistance train to be sent on T/A 602
A)30 kmph
B)10 kmph
C)15 kmph
D)40 kmph
Answer: 15 kmph
- Q. The Maitree Express connects India with which of the following countries?
A)Bangladesh
B)Myanmar
C)Pakistan
D)Nepal
Answer: Bangladesh
- Q. Colour of the semaphore distant signal is ________.
A)Yellow
B)Red
C)White
D)Green
Answer: Yellow
- Q. The distance between two automatic signals is normally
A)3 km
B)2 km
C)1 km
D)None of these
Answer: 1 km
- Q. When a passenger carrying train is working with engine running tender foremost the speed is ________ if cow catcher and head light is not provided.
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these
Answer: 20 kmph
- Q. Which whistle code shall be used by loco pilot while Guard’s assistance is required?
A)Three short
B)Long continue
C)Intermediate long continue
D)Three long
Answer: Three short
- Q. How many dead engine can be attached in a goods train?
A)3
B)1
C)2
D)4
Answer: 1
- Q. 400 meters beyond the home signal of a C’ class station is called as ________.
A)Last stop signal
B)Block section
C)Overlapping block section
D)None of these
Answer: Overlapping block section
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the brake van.
A)6.8
B)7.8
C)5.8
D)4.7
Answer: 4.7
- Q. Goods warning board will be provided from FSS in BG at
A)560 meters
B)1400 meters
C)1000 meters
D)None of these
Answer: 1400 meters
- Q. The headquarters of South Railways is situated at
A)Delhi
B)Kolkata
C)Chennai
D)Mumbai
Answer: Chennai
- Q. Used for A self propelled vehicle repairs in OHE is
A)Moped Trolley
B)Tower wagon
C)Ladder Trolley
D)None of these
Answer: Tower wagon
- Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
A)15 km
B)8 km
C)10 km
D)25 km
Answer: 25 km
- Q. Special instructions are issued by whom?
A)Authorized officer
B)CCM
C)CRS
D)None of these
Answer: Authorized officer
- Q. While ordering ART/MRV each siren shall be sounded for ________ seconds.
A)43
B)41
C)42
D)45
Answer: 45
- Q. Signals are normally located to the ________ side of the line.
A)Both
B)Right
C)Left
D)None of these
Answer: Left
- Q. TCAS full form is:
A)Train Collision Avoidance Software
B)Train Collision Advance System
C)Train Complement Accident Software
D)Traffic Collision Avoidance System
Answer: Traffic Collision Avoidance System
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State