Q. No passenger train shall be started from a station before the ________ time
A)Both B)Advertised C)Non-advertised D)None of these
Answer: Advertised
Q. Where is the Research, Design and Standard Organization situated?
A)Pune B)Lucknow C)Bangalore D)New Delhi
Answer: Lucknow
Q. Modified lower quadrant signaling may be introduced only with section of
A)GM B)Railway Board C)CRS D)None of these
Answer: CRS
Q. In case of accident, siren is repeated at an interval of ________ minutes.
A)20 B)10 C)15 D)5
Answer: 5
Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.
A)25 B)30 C)20 D)50
Answer: 30
Q. When a Goods train is working without guard or BV or Guard and BV the speed is
A)10 B)25 C)20 D)None of these
Answer: 25
Q. Which of the following sectors are included as part of multi – modal logistics hubs in India? 1)Aviation 2)National Highways 3) Ports 4)Inland waterways 5)Railways Select the correct option from codes given below: