More Questions on Indian Railway
- Q. In case of ACP Guard shall proceed towards the front from ________ side.
A)Back
B)Left
C)Right
D)Noe of these
Answer: Left
- Q. Which state has the longest route (in kilometers) of railway line in India?
A)Rajasthan
B)Maharashtra
C)Andhra Pradesh
D)Uttar Pradesh
Answer: Uttar Pradesh
- Q. During single line working of DL the speed of the first train is ________ kmph
A)15
B)25
C)20
D)None of these
Answer: 25
- Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
A)35
B)20
C)25
D)30
Answer: 30
- Q. Corridor block is mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. When the driver reports rough running or lurch on the run, the SM to issue caution order with speed ________ kmph
A)20
B)10
C)15
D)None of these
Answer: 10
- Q. After the detonator explodes if Driver does not find any signal he can proceed upto ________ Km cautiously
A)2
B)1.5
C)1
D)None of these
Answer: 1.5
- Q. Approved special instructions are issued by ________.
A)PCOM
B)CRS
C)MT
D)None of these
Answer: CRS
- Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
A)30 meters
B)20 meters
C)25 meters.
D)None of these
Answer: 30 meters
- Q. Guard of goods train shall sign on ________ minutes before the actual departure of the train.
A)40
B)45
C)30
D)35
Answer: 45
- Q. The banner flag is a ________
A)Both of these
B)Temporary stop signal
C)Permanent stop signal
D)None of these
Answer: Temporary stop signal
- Q. Nil Caution order number is ________
A)T/C409
B)T/A-409
C)T/B-409
D)None of these
Answer: T/A-409
- Q. When water touches danger level mark, C.O. to be issued for speed – during day
A)20 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. During thick & foggy weather, line must be clear upto ________ for granting line clear at a B’ class station in TALQ signalling system on Double line.
A)Shunt signal
B)Calling-on Signal
C)Home Signal
D)None of these
Answer: Home Signal
- Q. When a goods train is working without brake can the speed is
A)25 kmph by day and 15 kmph by night
B)15 kmph
C)25 kmph
D)None of these
Answer: None of these
- Q. Written authority received to pass approach stop signal.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. The speed of shunting is ________.
A)10 kmph
B)15 kmph
C)20 kmph
D)None of these
Answer: 15 kmph
- Q. How many copies of caution order shall be prepared for a train provided with banking engine?
A)5
B)3
C)4
D)None of these
Answer: 5
- Q. When the derailing switch is open, trap indicator shows red target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Red
- Q. In case of block forward, private number of ________ station is written on shunting authority.
A)T/809
B)T/806
C)T/809
D)T/810
Answer: T/806