More Questions on Indian Railway
- Q. The speed of Motor Trolly over points and crossings is
A)15 kmph
B)10 kmph
C)8 kmph
D)None of these
Answer: 15 kmph
- Q. Time taken by train running at booked speed is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Normal running time
- Q. Whistle boards must be provided at an adequate distance in rear of all level crossing gates on both side?
A)600 meters
B)400 meters
C)500 meters
D)800 meters
Answer: 600 meters
- Q. Which whistle code shall be used by loco pilot while Guard’s assistance is required?
A)Three short
B)Long continue
C)Intermediate long continue
D)Three long
Answer: Three short
- Q. Guard shall use ________ bell code to warn the motorman, if motorman violated the speed.
A)0-00-00
B)000-000
C)00-00
D)000-000-000
Answer: 000-000
- Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.
A)25
B)30
C)20
D)50
Answer: 30
- Q. Which Zone is the largest railway zone in India?
A)Eastern Railway
B)Central Railway
C)Northern Railway
D)Western Railway
Answer: Northern Railway
- Q. Maximum speed of pushing back is ________ km/h.
A)45
B)30
C)25
D)40
Answer: 25
- Q. ________ brake is not provided in the coach of passenger train.
A)Minor
B)Hand
C)Non-hand
D)None of these
Answer: Hand
- Q. ________ is measured with the help of anemometer.
A)Both
B)Wind
C)Velocity
D)None of these
Answer: Both
- Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
A)PWI
B)CI
C)LI
D)TI
Answer: PWI
- Q. The time taken for formation of a goods train in flat yard is
A)3 kmph
B)2 hrs
C)1 hr
D)None of these
Answer: 2 hrs
- Q. Reminder Caution Order is?
A)T/B409
B)T/409
C)T/A409
D)None of these
Answer: T/B409
- Q. Signal has extinguished.
A)------00
B)___0___
C)0___0
D)00___
Answer: ------00
- Q. The length of long welded rail under Indian conditions should be about
A)0.50 km
B)1 km
C)2 km
D)None of these
Answer: 1 km
- Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
A)8 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. TCAS full form is:
A)Train Collision Avoidance Software
B)Train Collision Advance System
C)Train Complement Accident Software
D)Traffic Collision Avoidance System
Answer: Traffic Collision Avoidance System
- Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
A)T/369(1)
B)T/369(3b)
C)T/369(2)
D)T/409
Answer: T/409
- Q. If the train passes through without headlight, SM shall give ________ bell code and advise the reason.
A)0000-0
B)000000-0
C)00000-0
D)0000-00
Answer: 000000-0
- Q. Where is RDSO Situated.
A)Chennai
B)Vadodara
C)Lucknow
D)New Delhi
Answer: Lucknow