- Q. What does the Slip siding protects?
A)Block Section
B)Station Section
C)Station Limit
D)Siding
Answer: Block Section
- Q. Shunting to be done in D/L block section
A)T-806
B)PLCT
C)T-369(3b)
D)Simple memo
Answer: T-806
- Q. Signal that controls the entry of trains into the block section in advance is called as
A)Last Stop signal
B)Fisrt Stop signal
C)Stop signal
D)None of these
Answer: Last Stop signal
- Q. What is maximum width of coaching stock in BG?
A)3250 mm
B)3050 mm
C)3200 mm
D)3300 mm
Answer: 3250 mm
- Q. Calling on signal is placed below any stop signal except ________.
A)Stop Signal
B)First stop signal
C)Last Stop signal
D)None of these
Answer: Last Stop signal
- Q. Where is the headquarters of Central Railway situated?
A)Gwalior
B)Mumbai (CST)
C)Mumbai (Church Gate)
D)Gorakhpur
Answer: Mumbai (CST)
- Q. The maximum speed of a train while passing through station of interlocking std III is?
A)140 kmph
B)50 kmph
C)110 kmph
D)160 kmph
Answer: 140 kmph
- Q. Palace on Wheels train was inaugurated in which year?
A)1982
B)1988
C)1972
D)1965
Answer: 1982
- Q. After the detonator explodes if Driver does not find any signal he can proceed upto ________ Km cautiously
A)2
B)1.5
C)1
D)None of these
Answer: 1.5
- Q. Which app has been launched by the Ministry of Railways to expedite & streamline passenger grievance redressal?
A)Rail Madad
B)Rail Sathi
C)Rail Dost
D)Rail Neer
Answer: Rail Madad
- Q. Where is the wheel and axle plant of Indian Railways situated?
A)Bangalore
B)Chittranjan
C)Kapurthala
D)Perambur
Answer: Bangalore
- Q. Second train during all communication failure shall be dispatched after an interval of
A)35
B)20
C)25
D)30
Answer: 30
- Q. The headquarters of Northern Railway is at
A)Gorakhpur
B)New Delhi
C)Guwahati
D)Mumbai (CST)
Answer: New Delhi
- Q. What is the maximum speed of a train while view is obstructed due to thick and foggy weather?
A)30 kmph
B)Normal speed
C)15 kmph
D)60 kmph
Answer: 60 kmph
- Q. Loco pilot shall not take alcoholic drinks before ________ hours from signing on duty.
A)8
B)5
C)4
D)10
Answer: 8
- Q. Continuity test is to be done.
A)_____00
B)0
C)0
D)00------
Answer: 00------
- Q. In automatic block system SL, the signal that can be dispensed with is
A)Automatic Stop signal
B)Home
C)Starter
D)None of these
Answer: Automatic Stop signal
- Q. Which of the following zones administers the Matheran Hill Railway?
A)Central Railways
B)Konkan Railways
C)Western Railways
D)Southern Railways
Answer: Central Railways
- Q. In Automatic Block system , in BG when there is obstruction in the adjacent line, driver to protect the adjacent line first by placing one detonator at not less than ________ , metres.
A)1200
B)600
C)800
D)None of these
Answer: 600
- Q. In which year Research, Design and Standard organization was established?
A)1959
B)1954
C)1957
D)1967
Answer: 1957