Q. Adequate distance mentioned in the automatic block system is ________ meters.

Correct Answer

120

More Questions on Indian Railway

  • Q. At station which signal will be taken off for block line?
    A)Shut
    B)Repeating
    C)Calling on
    D)No Signal
    Answer: No Signal
  • Q. Matheran Hill Railway is a narrow gauge heritage railway located in which state?
    A)Maharashtra
    B)Tamil Nadu
    C)Himachal Pradesh
    D)Meghalaya
    Answer: Maharashtra
  • Q. India’s first rail auto hub will be located in:
    A)Delhi
    B)Kolkata
    C)Chennai
    D)New Delhi
    Answer: Chennai
  • Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is
    A)10 kmph
    B)5 kmph
    C)8 kmph
    D)None of these
    Answer: 5 kmph
  • Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
    A)Sound energy
    B)Potential energy
    C)Electricity
    D)Magnetic energy
    Answer: Electricity
  • Q. What is the target time for ART during night hours?
    A)60 minutes
    B)30 minutes
    C)45 minutes
    D)20 minutes
    Answer: 45 minutes
  • Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.
    A)25
    B)30
    C)20
    D)50
    Answer: 30
  • Q. Which of the following is / are Union Subjects as per seventh schedule of the Constitution of India? 1)Armed Forces 2)Paramilitary Forces 3)Railway Police 4)Cantonment Areas Select the correct option from the codes given below:
    A)Only 1, 2 & 4
    B)Only 1 & 2
    C)Only 1, 2 & 3
    D)1, 2, 3 & 4
    Answer: Only 1, 2 & 4
  • Q. When an accident occurs the GDR must their report to next SM in form.
    A)ACC5
    B)ACC1
    C)ACC2
    D)ACC3
    Answer: ACC3
  • Q. Which aspect of signal on Automatic section while showing “A” & “AG” both light-up?
    A)Gate opened and point is not set for main line
    B)Gate closed and point is set for main line
    C)Gate opened and point is set for main line
    D)Defective signal
    Answer: Defective signal
  • Q. When baking a train from one line to the other line, it is necessary to present the train guard.
    A)Break van
    B)Point
    C)Station
    D)Any Place
    Answer: Break van
  • Q. Upto how many track machine shall be allowed for working within the block section?
    A)8
    B)2
    C)5
    D)10
    Answer: 5
  • Q. On double line, when a running line is blocked by stabled load , the point to be set against are
    A)Advance point
    B)Either side points
    C)Rear points
    D)None of these
    Answer: Rear points
  • Q. Which city is hosting the International Conference on Green Initiatives & Railway Electrification?
    A)Guwahati
    B)Kochi
    C)Chennai
    D)New Delhi
    Answer: New Delhi
  • Q. What is maximum width for 8-Wheeled Goods stock in BG?
    A)3250 mm
    B)3050 mm
    C)3200 mm
    D)3300 mm
    Answer: 3050 mm
  • Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
    A)Both
    B)Path
    C)Platform
    D)None of these
    Answer: Platform
  • Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 5 kg/cm2 of BP pressure in the engine.
    A)6
    B)10
    C)8
    D)4
    Answer: 6
  • Q. Block competency certificate is given in the prescribed form ________.
    A)T/115A
    B)T/115B
    C)T/115C
    D)T/115D
    Answer: T/115B
  • Q. Trap indicator is provided to indicate ________.
    A)Provision Switch
    B)Indication Switch
    C)Derailing switch
    D)None of these
    Answer: Derailing switch
  • Q. In the classification of A to R accidents, ________ and ‘o’ classes are not included.
    A)Both
    B)Minor
    C)Serious
    D)None of these
    Answer: Serious