- Q. Maximum speed of pushing back is ________ km/h.
A)45
B)30
C)25
D)40
Answer: 25
- Q. Shunting to be done in D/L block section
A)T-806
B)PLCT
C)T-369(3b)
D)Simple memo
Answer: T-806
- Q. Track maintenance machine is permitted to work during
A)Day clear weather
B)Day
C)Day and Night
D)None of these
Answer: Day and Night
- Q. In push button token less territory, before starting the train with for T/369(1) during signal failure at station in advance, SM to get ________ from that station.
A)Both
B)PN
C)Non-PN
D)None of these
Answer: PN
- Q. The headquarter of Central Railway situated at?
A)Gwalior
B)Mumbai (CST)
C)Mumbai (Church Gate)
D)Gorakhpur
Answer: Mumbai (CST)
- Q. SLB determines the limits of block section and ________.
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Station Section
- Q. Authority to pass IBS has been issued from station in rear.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. Number of train signal register of double line is ________.
A)T/66 B
B)T/66 A
C)T/66 C
D)T/66
Answer: T/66 B
- Q. Which authority shall be received to perform shunting beyond LSS at station of double line equipped with
A)T/A 602
B)T-806
C)T/A 802
D)T-806 A
Answer: T-806
- Q. General Manger is responsible for
A)Both railway Board and Railway Ministry
B)Railway Board
C)Railway Ministry
D)None of these
Answer: Railway Board
- Q. When was the Jammu City appeared on the map of Indian Railway?
A)1967
B)1956
C)1963
D)1965
Answer: 1965
- Q. Which of the following zones administers the Matheran Hill Railway?
A)Central Railways
B)Konkan Railways
C)Western Railways
D)Southern Railways
Answer: Central Railways
- Q. Adequate distance mentioned in the automatic block system is ________ meters.
A)105
B)110
C)120
D)115
Answer: 120
- Q. Permission to run C’ class ODC is given by CRS and the maximum speed of train is
A)4
B)2
C)3
D)6
Answer: 2
- Q. What is the maximum speed of a train Ist train dispatched after introduced TSL on double line section?
A)15 kmph
B)30 kmph
C)25 kmph
D)Normal speed
Answer: 25 kmph
- Q. During hand shunting only ________ Bogies can be hand shunted.
A)3
B)1
C)2
D)None of these
Answer: 1
- Q. Termination indication boards post will be pointed alternatively black and white with ________ CM high bands.
A)15
B)20
C)25
D)30
Answer: 30
- Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
A)Both
B)Temporary Working Order.
C)Permanent working order.
D)None of these
Answer: Temporary Working Order.
- Q. What will be the speed of a train running through from station without brake van provoded with Tail lamp?
A)15 kmph
B)20 kmph
C)Stop & Start
D)Normal speed
Answer: Normal speed
- Q. Loss of Railway property of ________ is treated as serious accident.
A)75 Lakhs
B)More than 50 lakhs
C)01 crore
D)More than 02 crore
Answer: More than 02 crore